Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112G317 + (ML20112G317)
- ML20112G320 + (ML20112G320)
- ML20112G322 + (ML20112G322)
- ML20112G324 + (ML20112G324)
- ML20112G327 + (ML20112G327)
- ML20112G330 + (ML20112G330)
- ML20112G340 + (ML20112G340)
- ML20112G343 + (ML20112G343)
- ML20112G345 + (ML20112G345)
- 05000327/LER-1996-004-02, :on 960509,normal Feeder Breaker Unexpectedly Tripped,Resulting in Loss of Power Signal & Start of Four Dgs.Caused by Failure of Breaker Mechanism.Spare Breaker Operating Mechanism Refurbished & Installed + (ML20112G346)
- ML20112G347 + (ML20112G347)
- ML20112G349 + (ML20112G349)
- ML20112G352 + (ML20112G352)
- NLS8400196, Responds to NRC Re Rev to Emergency Plan Clarifying Various Areas of Concern,Including Emergency Director,Location of Personnel & Alternate Methods of Contacting Key Personnel + (ML20112G355)
- ML20112G364 + (ML20112G364)
- ML20112G370 + (ML20112G370)
- ML20112G371 + (ML20112G371)
- ML20112G374 + (ML20112G374)
- 05000298/LER-1995-018, :on 951121,recognized Design Bases of Steam Tunnel Blowout Panels Not Well Documented.Cause Cannot Be Established.Bulk of Fiberglass Removed from Blowout Panels + (ML20112G375)
- ML20112G377 + (ML20112G377)
- ML20112G381 + (ML20112G381)
- ML20112G383 + (ML20112G383)
- ML20112G387 + (ML20112G387)
- ML20112G389 + (ML20112G389)
- ML20112G391 + (ML20112G391)
- ML20112G392 + (ML20112G392)
- ML20112G396 + (ML20112G396)
- ML20112G398 + (ML20112G398)
- ML20112G399 + (ML20112G399)
- ML20112G402 + (ML20112G402)
- BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station + (ML20112G403)
- ML20112G405 + (ML20112G405)
- ML20112G406 + (ML20112G406)
- ML20112G410 + (ML20112G410)
- ML20112G412 + (ML20112G412)
- RBG-20-430, Forwards Revs to Fsar.Revs Reflect Change in Calculations for UHS Max Temp Due to Revs in Plant Equipment Operation + (ML20112G413)
- ML20112G414 + (ML20112G414)
- 05000498/LER-1996-002-01, :on 960507,failure to Meet Requirements of Tech Specs Occurred.Caused by Inattention to Detail During Documentation & Review of Testing Results.Feedback from Event Given to Individuals Involved + (ML20112G415)
- ML20112G416 + (ML20112G416)
- ML20112G417 + (ML20112G417)
- ML20112G422 + (ML20112G422)
- RBG-20-502, Forwards Revised Pages to 850131 Response to SER Outstanding Issue 3,providing Addl Details of Subcompartment Analyses of High Energy Line Breaks Necessary for Independent Verification Analysis + (ML20112G424)
- ML20112G434 + (ML20112G434)
- ML20112G437 + (ML20112G437)
- ML20112G438 + (ML20112G438)
- ML20112G441 + (ML20112G441)
- RBG-19-844, Forwards Process Control Program & Offsite Dose Calculation Manual for Review + (ML20112G444)
- ML20112G446 + (ML20112G446)
- ML20112G449 + (ML20112G449)
- L-84-377, Forwards Disposition of Nonconforming Matls Supplied by Tube-Line Corp Reported in 840928 Response to IE Bulletin 83-06.Status Rept Also Encl.Next Rept Scheduled for 850104 + (ML20112G458)
- 05000254/LER-1996-007-02, :on 960510,secondary Containment Damaged.Caused by Tornado.Initiated Shutdown,Ac Power Restored to Prompt Notification Sys & Station Blackout Bldg Cables Spliced Per Er 9603099 + (ML20112G460)