ML20112G399
| ML20112G399 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/07/1996 |
| From: | Terry C, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Laura Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20112G401 | List: |
| References | |
| TXX-96387, NUDOCS 9606110407 | |
| Download: ML20112G399 (1) | |
Text
e
! 4 M
Log # TXX 96387 2M File # 10010 L
4 10250 E
5 Ref. # 10CFR50.36(c)(5) 1UELECTRIC l
- c. L..re T'm June 7, 1996 Gnmp \\ke Prrudent U. S. Nuclear Regulatory Commission Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Attn: Ms. L. J. Smith
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N0. 50 446 TRANSHITTAL OF UNIT 2 CYCLE 3 STARTUP REPORT
Dear Mr. Tapia:
Pursuai,. to Technical Specifications 6.9.1.1, enclosed is the Unit 2.
Cycle 3 Startup Report. Unit 2 achieved Criticality for Cycle 3 on May 5, 1996.
Cycle 3 contains the first batch of Siemens Power Corporation fuel for Unit 2.
This enclosure describes the Siemens fuel nuclear and mechanical design parameters.
Should you have any questions, please contact Mr. J. D. Seawright at (214) 812 4375.
Sincerely,
/
- b. -
Alg C. L. Terry By:
hL
/ ' bf Roder'D. Walker 7
~
Regulatory Affairs Manager 1
JDS/grp Enclosure j
c-Mr. L. J. Callan, Region IV Resident Inspectors CPSES i
Document Control Desk Mr. P. H. Ray, NRR hb I
9606110407 960607 PDR ADOCK 05000446 PDR P
.L1UUb'f Energy Plaza 1601 Bryan Street Dallas. Texas 75201 3411 1