- 05000416/LER-1992-006, :on 920428,operators Received Alarm,Indicating Actuation of RPS Via Channel G of APRM Sys.On 920427, Excessive Undervessel Leakage Occurred.Caused by Electrical Short.Uncoupling Tool Removed from Svc + (ML20101B700)
- ML20101B701 + (ML20101B701)
- ML20101B707 + (ML20101B707)
- 05000324/LER-1992-013, :on 920430,unexpected Primary Containment Isolation Sys Group 6 Isolation Received & Standby Gas Trains Autostarted.Caused by Incomplete Clearance Instructions.Bus Load Lists Incorporated + (ML20101B709)
- 05000325/LER-1992-003-02, :on 920413,discovered That Foundation Bolts on Control Bldg Emergency Air Filtration Unit 2A Not in Full Contact W/Nuts.Root Cause Analysis in Progress.Angles & Bolts Removed & Replaced & Welds Fabricated + (ML20101B710)
- ML20101B711 + (ML20101B711)
- 3F0592-11, Suppls 880830 & 890913 Responses to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Potential for Adverse Thermal Effects Remains Limited to Hpi/Makeup Lines, Based on Complete Review of RCS Interfaces + (ML20101B723)
- 05000302/LER-1992-006, :on 920501,four safety-related Pipe Supports Did Not Meet Minimum Fs as Specified in NRC IE Bulletin 79-02.Caused by Design Oversight by Ae Firm in 1984.Sys Modified in Compliance W/Bulletin 79-02 + (ML20101B725)
- 05000413/LER-1992-006-01, :on 920429,particulate Activity Monitors Declared Inoperable Due to Technical Deficiency in Procedure.Calibr Procedure Revised & Particulate Activity Monitors Recalibr + (ML20101B734)
- ML20101B738 + (ML20101B738)
- ML20101B740 + (ML20101B740)
- 05000302/LER-1992-007, :on 920501,facility Determined That Calculated Input Voltage to Motor Operators on Two Steam Admission Valves May Experience Voltage Lower than Minimun Required. Caused by Initial Plant Design.Mod in Progress + (ML20101B745)
- 05000331/LER-1992-008, :on 920402,discovered That Two Bolts Broke When Subjected to Less than Required Torque Requirements.Caused by Hydrogen Induced Cracking.Bolts Replaced & Sent Offsite for Testing to Determine Cause + (ML20101B749)
- ML20101B750 + (ML20101B750)
- 05000364/LER-1992-003, :on 920502,inadvertent Actuation of ESF Equipment Occurred.Caused by Inadequate Procedural Guidance. New Procedure Was Developed to Provide Guidelines for Temp Signal Test + (ML20101B751)
- ML20101B752 + (ML20101B752)
- ML20101B753 + (ML20101B753)
- ML20101B755 + (ML20101B755)
- 05000331/LER-1984-041, :on 841111,reactor Water Conductivity Increased Above Tech Spec Limit.Caused by Resin or Air Intrusion. Operating Procedures Improved to Minimize Sys Disturbances + (ML20101B757)
- ML20101B759 + (ML20101B759)
- BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station + (ML20101B765)
- ML20101B766 + (ML20101B766)
- ML20101B768 + (ML20101B768)
- ML20101B770 + (ML20101B770)
- ML20101B777 + (ML20101B777)
- ML20101B781 + (ML20101B781)
- ML20101B784 + (ML20101B784)
- ML20101B787 + (ML20101B787)
- ML20101B789 + (ML20101B789)
- 05000370/LER-1991-012, :on 911108,automatic Reactor Trip Initiated Due to Control Rod Failure.Caused by Equipment Failure. Iae Personnel Downloaded Traces of Electronic Circuit Performance + (ML20101B790)
- ML20101B791 + (ML20101B791)
- ML20101B795 + (ML20101B795)
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition + (ML20101B798)
- ML20101B801 + (ML20101B801)
- ML20101B806 + (ML20101B806)
- JAFP-96-0110, Forwards Corrected Page of GL 95-07 180-day Response + (ML20101B809)
- ML20101B817 + (ML20101B817)
- ML20101B818 + (ML20101B818)
- ML20101B827 + (ML20101B827)
- ML20101B828 + (ML20101B828)
- ML20101B830 + (ML20101B830)
- ML20101B832 + (ML20101B832)
- PLA-4431, Responds to NRC Re Violations Noted in NOV & Proposed Imposition of Civil Penalty in Amount of $100,000. C/As:Independent Assessment of Security & Nuclear Safety Concerns Program Completed + (ML20101B841)
- ML20101B850 + (ML20101B850)
- ML20101B854 + (ML20101B854)
- ML20101B855 + (ML20101B855)
- ML20101B859 + (ML20101B859)
- ML20101B863 + (ML20101B863)
- ML20101B868 + (ML20101B868)
- ML20101B873 + (ML20101B873)
- ML20101B874 + (ML20101B874)