Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100C612 + (ML20100C612)
- NRC-96-0004, Forwards Fermi 2 Physical Security Plan Rev 26,per 10CFR50.54(p)(2).Plan Withheld + (ML20100C620)
- ML20100C625 + (ML20100C625)
- ML20100C640 + (ML20100C640)
- ML20100C650 + (ML20100C650)
- ML20100C665 + (ML20100C665)
- ML20100C683 + (ML20100C683)
- AECM-85-0057, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5) + (ML20100C690)
- ML20100C726 + (ML20100C726)
- ML20100C735 + (ML20100C735)
- ML20100C747 + (ML20100C747)
- ML20100C791 + (ML20100C791)
- 05000352/LER-1995-011, :on 951227,ESF Actuation Resulting from RWCU Sys Isolation.Caused by Unexpected Acute Failure of High B RWCU Pump Seal.Replaced Pump Seal + (ML20100C797)
- ML20100C799 + (ML20100C799)
- ML20100C803 + (ML20100C803)
- ML20100C809 + (ML20100C809)
- NRC-96-4630, Forwards Responses to NRC RAIs on AP600 Design Certification Test Program + (ML20100C810)
- ML20100C812 + (ML20100C812)
- ML20100C813 + (ML20100C813)
- ML20100C815 + (ML20100C815)
- ML20100C829 + (ML20100C829)
- ML20100C834 + (ML20100C834)
- ML20100C852 + (ML20100C852)
- ML20100C860 + (ML20100C860)
- ML20100C893 + (ML20100C893)
- ML20100C909 + (ML20100C909)
- ML20100C934 + (ML20100C934)
- ML20100C936 + (ML20100C936)
- ML20100C941 + (ML20100C941)
- B11490, Forwards Response to SER (NUREG-1031) Confirmatory Item 15 Re thermal-hydraulic Analysis to Support N-1 Loop Operation. Inlet Flow Distributions for Three & Four Loops in Operation Provided for Comparison + (ML20100C943)
- ML20100C945 + (ML20100C945)
- RBG-20-496, Forwards Minor Revs to FSAR Section 6.2.6 Re Containment Leak Rate Testing of Electrical Penetrations.Penetration Design Now Incorporates Double O-rings to Be Type B Tested by Pressurizing Between Seals + (ML20100C949)
- ML20100C954 + (ML20100C954)
- RBG-20-495, Informs That All Procedures Required to Govern Control of Heavy Loads Lifted by Reactor Bldg Polar Crane Listed in Table 4 of 840301 Submittal Will Be Completed Prior to Fuel Load W/Exception of Load 5, Portable,Refueling Shield + (ML20100C957)
- ML20100C965 + (ML20100C965)
- ML20100C966 + (ML20100C966)
- ML20100C973 + (ML20100C973)
- ML20100C975 + (ML20100C975)
- ML20100C980 + (ML20100C980)
- ML20100C984 + (ML20100C984)
- ML20100C986 + (ML20100C986)
- ML20100C988 + (ML20100C988)
- ML20100C991 + (ML20100C991)
- ML20100C994 + (ML20100C994)
- ML20100D006 + (ML20100D006)
- ML20100D010 + (ML20100D010)
- ML20100D014 + (ML20100D014)
- ML20100D027 + (ML20100D027)
- ML20100D030 + (ML20100D030)
- ML20100D034 + (ML20100D034)
- ML20100D038 + (ML20100D038)