Forwards Annual Rept for Armed Forces Radiobiology Research Inst Triga Mark-F Reactor & SAR for Armed Forces Radiobiology Research Insp Triga Mark-F Reactor. Summary of SAR Changes Made During Relicensing Action Also Encl
ML20100D010
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 03/26/1985
From: Adcock B
ARMED FORCES RADIOBIOLOGICAL RESEARCH INSTITUTE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
Shared Package
ML20100D012 List:
References
01133, 1133, NUDOCS 8504010049
Download: ML20100D010 (3)


Text

-

~

sq J LDEFENSE NUCLEAR' AGENCY

' - ARMED FORCES RADl'OBIOLOGY RESEARCH INSTITUTE BETHESDA, MARYLAND 20814 -

-f)

[ c

2 -

' ' ^

%%p - -

m .

, 01.133

  1. ^^ ' TO: Regional Administrator- MAR 2 6 G85

.USNRC'

- . 631 Park Avenue; 9 King of Prussia,' PA 19406 4

,i' 9 USNRC g

~

Director Of 1hspection and Enforcement g

gECElyED Washington, D. C. 20555 -

MAfpf g ~ ~ '

c

_ USNRC_ .

9 %asnaarmesa riac Director of Nuclear Reactor Regulation p

.. Washington, D. C. 20555 C, A Q

Dear Sirs:

^

Please find enclosed the fourth quarter section of the annual report.for the Armed Forces Radiobiology Research Institute reactor facility. Wis report, when attached to the previously submitted annual report for 1 Oct 83 to 30 Sept 84, will~

constitute a complete report for CY 1984. Enclosed are required copies of the

- SAR updated to Sept 1984. .%e sheet attached (to the SAR) summarizes SAR changes made under 10CFR50.59 and reviewed by the reactor safety committee,

- and changes made during the AFRRI relicensing action. Dese changes occurred as a result of errors in the original SAR, from interaction between NRC and AFRRI-during the 4-year relicensing period, and from administrative changes from 1981 to Sept 1984. De attached sheet is a list summarizing the changes made to the SAR.

We list refers .to each change by its page, as found in the new SAR dated Sept 1984. We contact for inform'ation on these reports is the- Reactor Facility .

Director, Mr. Mark Moore. He may be reached at 301-295-1290.'

.n

(

SOB . DCOCK Colonel, MS, USA .

Director I

I r

.O N 3AR s

, t

,9 8504010049 850326

~

kDR ADOCK 05000170

. (

. f
x. .

m Y,.

q .

Summary of SAR Changes

'Ihe SAR dated Sept 1984 includes changes from the original published date of May 1981 to Sept 1984. 'Ihese changes were reviewed by the AFRRI Reactor and Radiation Facility Safety Committee and found to contain no unreviewed safety questions and were made under 10CFR50.59.

!!he following summarizes those changes made in the enclosed copies of the AFRR1 SAR. Since many of' the changes are simply changes of names or. new function (adminstrative) diagrams, all such changes will be labeled administrative. Changes resulting from incorrect spelling, punctuation, and grammar are labeled grammar.

Changes resulting from communication with the NRC during the licensing process (questions and answers) or as a result of the intervention process are labeled relicensing process. - Other changes summarized on an individual basis.

Change # Page' Change # Summary of change on page 1 1 1 Administrative 2 -IV 1 Administrative

/ 3 IV 2 Administrative 4 1-1 1 Administrative y 5 2-1 1 Administrative 6 2-1 2 Administrative 7 2-1 3 Administrative 8 2-1 4 Administrative 9 2-7 1 Administrative 10 2-10 1 Administrative 11 2-10 2 Administrative 12 3-7b 1 Describes a new Reactor ventilation system. Full description submitted to NRC 1983. System is switched to single pass, negative pressure air from multipass, negative pressure air in Reactor room ventilation system. System becomes single branch of institute air.

13 3-8 1 Diagram of Change 12 14 3-10 1 Deleted explanation of old air system.

15 3-11 1 A 'more complete description of how the dampers are closed to isolate reactor room.

16 3-15 1 Allows bulk water temperature measurement to be taken in a more representative area of pool.

17 3-16 1 Relicensing process. Changes averaging time of conductivity requirements from monthly to weekly.

18' 3-26 1 Changes the description of RAM monitoring system to describe equal but updated system.

19 3-26 2 Grammar 20 3-27 1 Makes RAM audible alarms in remote locations optional (SAF Room).

21 3-27 2 Same as #20 22 3-29 1 Places all compressed air supplies into one unit under reactor staff control.

23 3-29 2 Describes #22 24 3-29 3 Describes #22 25- 3-41 1 Administrative s

m

F

.a.

26 '4-1 ~1- Changes wording to reflect true fuel composition (20%

T. , to <20%).

11 < 27. 4-1 2 Reword and regroup descriptions of experimental facil-ities.

28 4-1. 3 Same as 27 29 4-1 4 Same as 27 130 4-3 1 Add As Required to PTS since tubes are not normally instalTed.

' 31' 4-6 1 Same as 27 32 4-8 1 Same as 27 33 '4-12 1 Same as 26

.34 4-13 1 Same as 26 35 4 1 Describes control rod air followers as allowed in Tech-nical fDecifications.

36 4 1 Same as 35 37 4-19 1- Same as 35

'38 '4-27 '1 Grammar 4-28 Relicensing process. Describes !$ec scrams.

-39, 1 40 4-30 1 See 33 41 5-1 1 See 30

+y 42 5-1 2 See 32 f 43 5-5 1 Administrative L 44 5-8 1 See 41 i 45 5-9 -1 See 20 46 5-14 1 Administrative 47- 5-14 2 Administrative

. 48 - 5-15 1 Administrative 49 5 2 Administrative 50 5-15 3 Administrative

. 51' ~ 6-2 1~ Administrative

- 52 ~ 6-14 1 Administrative 53 6-17 1 . Administrative 54 6 1 Administartive 55 7-2 1 Adminstrative 56 7-3 1- . Changes the requirement for director of AFRRI from Medical Department to Medical Services Corps officer.

57 .7-4 1 Relicensing process. Describes RRFSC.

'58 7-4 2 Same as 57 59 7 1 Administrative 60  : 7-5 2 Administrative 61 7-5 3 Administrative

-62' 7-5 4 Administrative 63 7-6 1 Administrative 64' 7-6 2 Administrative 65 7-7 1 Administrative 66- 7-8 1 - Administrative 67 7-8 2 Administrative 68 :7-8 3 Administrative

-69 7-8 4 Administrative

70. 7-8 5 - Administrative 71 7-8 6 Administrative l