ML20100C945

From kanterella
Jump to navigation Jump to search
Forwards Status Update for Listed Tech Spec Change Requests. Priority for NRC Review & Approval Requested for 105 & 116. Notification of Changes in Implementation for Amends & Current OL Requested
ML20100C945
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/26/1985
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-85-2041, NUDOCS 8504010015
Download: ML20100C945 (2)


Text

%

c.

. b GPU Nuclear Corporation Nuclear

,ome::=

s Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Olal Number:

March 26, 1985 5211-85-2041 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Status of TMI-1 Technical Specification Change Requests (TSCRs)

Attached is a table which provides an updated status of TSCRs for THI-1 which have not yet been approved by the NRC. This table should facilitate a mutual understanding of the status of each pending TSCR.

It is requested that the priority for NRC review and approval be given to TSCRs 105 and 116.

We request, as in previous TSCR status reports, to be notified by telephone of any amendment that is issued with an implementation different than requested.

The Operating License for THI-1 has been amended several times since issuance.

For consistency, we request a copy of the Operating License as it currently reads be sent to us.

Sincerely,

$p0 k

p

. D. i kill Director, THI-1 HDH/SM0/spb cc:

R. Conte

0. Thompson J. Thoma D\\

Attachment O

GPU Nuclear Corporation is a subsidiary of the General Public Utilitins Corporation 0212A

\\

DATE SUOMITTED' PUBLIC NOTICE IWLEENTATION 1

TSCR SUBJECT.

TO NRC ISSUE ~DATE REQUESTED'

.1 STATUS'

-_ 38 Fuel Handling Building Fuel Rev. 0, 9/21/76 30 days of receipt.

MRC' approval requested.-

-Cask Drop Rev. 1,:2/28/85-104 RV Material Surveillance Rev. 0. 6/5/81 NRC approval requested.-

(Capsule Withdrawal Sequence)

Rev.1, 4/5/83 Rev.--2, 7/10/84 10/24/84 Ismediately 105 Snubber Surveillance Program Rev. 0, 6/8/81 NRC approval reques'ted Rev. 1, 2/17/84 9/28/84-60 days of receipt-as soon as possible..

116 R8 Purge Surveillance.and Rev. O. S/13/83 60 days of receipt..

NRC approval requested l-Rev. 1. 11/24/83 as soon as possible.

l 12/3/84 140 High Radiation Area Dosimetry Rev. O, 9/24/84 11/21/84 Ismediately

.NRC approval requested.

Rev. 1, 12/21/84 142 Decay Heat Removal Capability 2/28/85 120 days of receipt.

'NRC approval requested.

143 Regulating Control Rod 2/1/85 Inmediately NRC approval requested.

Power SCRs 1

l-l l

0212A