4

ANNUAL REPORT i

for AFRRI ~

TR GA l Mark-F .

l l

Reactor

- l I ': ' ,

Prepared by  ;

! M. L Moore .

H. H. Spence .

i M. M. Dougherty i .-  :

8504010056 850326

' I .

PDR ADOCK 05000170 -

R _

PDR ...............

t DEFENSE NUCLEAR AGENCY ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE BETHESDA, MARYLAND 20814-5145

,,i . .. u.e o,a v. i. ..ii uo. 4.a .. a o,.. o o ,. , . . . .o. .s u . i , ,,, a. . . . . .. . , ,,, , ,, m,

  • oinritx,no., i nnei i., o s c. 4,,,,

tett rrest to of f,Lu of thren los. As n=<16 orus H.nhotnol msy Husu,tti institui.-

~. _

r-

' a-Armed Forces Radiobiology Research Institute Reactor Facility Annual Report 1 Oct 1984 to 31 Dec 1984 Prepared by M. L. Moore, Facility Director H. H. Spence, Genior Operator 4

  • ' - ewe ~~ - - - , - - , , , , - . . . _ -

Armed Forces Radiobiology Research Institute Reactor Facility Annual Report 1 Oct 1984 to 30 Dec 1984 htroduction 1his is a supplemental report issued to cover the time period 1 Oct 1984 to 30 Dec

- 1984. We shortened period reflects the change necessary to comply with a change in reporting period required of the new AFRRI technical specifications issued

1 Aug 1984. 'Ihis report when attached-to 'the report submitted 30 Sept 1984, becomes the CY 1984 Annua 1 report in its entirety.

Ihis report is written in a format to include notification items required by the technical specifications. Items ' not specifically required but of a general information value will be given in the General Information section. Each section following the general information corresponds to the required section as listed in Section 6.6.la of the AFRRI technical specifications.

4 General Information 1.' Current key AFRRI personnel are as follows Director - COL Bobby R. Adcock, MS, USA Deputy Director - CDR Richard I. Walker, MSC, USN Chairman, Radiation Sciences Dept. - CDR Vincent L. McManaman, MSC,USN

'Calef, Radiations Sources Division - CPT IAonard A. Alt, EN, USA '

4

- 2. C'irrent key reactor facility personnel Reactor Facility Director - Mark Moore (SRO) l: - Reactor Operations Supervisor - CPT Charles Williamson (SRO)

Reactor Staff Engineer - Maureen Dougherty (SRO) 1

- k.

L Senior Reactor Operator CPT Leonard A. Alt (SRO)

Senior Reactor Operator - MSG Harry Spence (SRO)

Senior Reactor Operator - SFC Steven Holmes (SRO)

Senior Reactor Operator - Stacy Brasfield (SRO)

Nuclear Research Officer - CPT Kenneth Hodgdon (trainee)

Trainee Operator - SP6 Wayne Reed (Trainee)

Trainee Operator - Alexine Holmes (Trainee)

3. 'There were no personnel departures during this period.
4. Were were no changes in the RRFSC this period.

- Section I CHANGES 'tT) DESIGN, CHARACTERISTICS, PROCEDURES, AND THE RESULTS OF SURVEELLANCE TESTING

a. Were were no changes to design, characteristics, or procedures as given in the SAR this period. A current startup and shutdown checklist are enclosed for information.
b. All surveillance items were accomplished on time. Malfunctions discovered are included in Section IV.

Section II ENERGY GENERATED ON CURRENT CORE Month Kwh Oct 8810.4 Nov 5998.0 Dec 6502.6 Total power - 486348.3 Kwh Total pulses greater than $2.00 - 3556 L

f.3 .

Section III UNSCHEDULED SHUTDOWNS Were were no unscheduled shutdowns in this reporting period. Unscheduled maintenance is listed in Section IV.

Section IV SAFETY CORRECTIVE MAINTENANCE We following are malfunctions that occurred to reactor equipment during this reporting period. We reason for the corrective action taken, in all cases, was to return tne failed unit to its proper operational status.

13 Nov 84_ During a startup checklist the linear count rate section of the linear channel failed to respond on serial ranges. We linear count rate board was replaced with a calibrated, fu111y functional board. We old

- board was checked,' repaired and found functional.

26 Nov 84 Gas stack monitor found to be inoperative due to loss of counting gas.

Oas tank replaced with full tank, lines purged, system operational.

10 Dec 84 Loss of signal on linear count rate section .003w to 300w. Replaced amplifier on board XH211. Channel recalibrated, system returned to service.

12 Dec 84 Magnet "on" light bulb not making good contact, causing safe rod to drop. Bulb contacts cleaned, bulb replaced, system tested found fully operational.

Section V FACILITY CHANGES Were were no changes to the facility this period.

Section VI

SUMMARY

OF SAFETY EVALUATION CHANGES NOT SUBMITTED TO NRC PURSUAKT'tO 10 CFR 50.59 Were were no changes, new tests, or experiments this period.

L- - - . . . - - ---- ._- , . _ _ _ _ _ _ . _ , . . _ _ , , _ _ , _ _ _ _ _ _ . _ __

O.

?.

Section VII

SUMMARY

OF RADIOAC'IYVE EFFLUENTS RELEASED a.- - Liquid waste - %e estimated average release on a quarterly basis is for the quarter less than 25% of the allowable release.

b. . Gaseous Waste - Dere was no particulate discharge in the last quarter CY 1984. We total Argon 41 discharged 1 Oct - 31 Dec is 8.3 Cf.
c. Solid Waste - All solid material was transferred to the AFRRI byproduct license, none was disposed of under R-84.

Section VIII ENVIRONMENTAL RADIOLOGICAL SURVEYS

a. We results of environmental sampling of soll, water and plant growth were not demonstrably above the normal range of background levels. We radionuclides found were those normally expected in natural background radioactivity and from longterm fallout.
b. Results of the environmental dosimetry program showed the following for the calendar year 1984:
1. We average background was determined to be 81.9 +/- 5.5 mrem.
2. De average reading above background was determined to be 7.0

+/- 2.5 mrem.

3. De highest station reading was determined to be 34.1 +/-20.5 mrem.
4. De results above are expressed at a 95% confidence level,
c. R1 plant surveys, including effluent filters analysis, showed no measurable activity (unless specified in VII above).
d. Dere were no special environmental studies.

L__

9 4

Section IX EKPOSURES GREATER THAN 25% OF 10CFR20 There were no visitors to, or staff members of, the reactor facility that received greater than 25% of the allowable dose given in 10CFR20 this reporting

' period.

'6 e

-,i f

I' t'

i f

e l:

.-+w--e-- , e- w -= , , , . ,-t --w , - - , - -t*'e-~v aww-- = ww-,==cv-*tmw w m-e t%w-e------,-wv--- *~ -vw---r---e7--e ,---w-=ve- w- --r

- J, ,.

r.

4 m+

<.m .

mr

~ DAIL.Y OPERATIONAL START UP CHECKLIST  :

CHECKLISTNo. DATE

,. SENIOR SRO PRESENT/0N CALL PERFORMED BY

% OPERA TORS TIME COMPLETED

' l. EQUIPMENT ROOM (Rm 3152)

1. Gas atack monitor pump and cooling air blower "ON" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. Air compressor pressure (psi) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. Air eempressor water traps DRAINED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

~ 4. Air dryer operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.l ,

5. Doore 231,231 A. 3152 and roof hatch SECURED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
II. LOBBY AREA 1 1.obby audio alarm turned "OF F". . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ill. EQUIPMENT ROOM (Rm 2158)

1. Profilter differential pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12. Primary diosharge pressure (pei) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. Domineralizer flow rates set to 6 gpm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. 4. Steak roughing filter D.P. (inches of water) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

' 5. Steak almolate filter D.P. (inehes of water) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

8. Visual inopsetion of ares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

- ~ 7. Door 2168 SECU R E D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _. _. ._ ... .. .. ._. .. . . . . . . . . . . . . . . . . . . . . . . .

IV. PREPARATION AREA Visual inspection of ares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

V. REACTOR ROOM (Rm 3161) ,

. 1.- Transwne rod air prewure (psi) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

p 2. Shielding doors bearing air pressure (peil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

- 3.' Tank water level below full merk (inches) . . . . . . . .~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

- 4. Visuel inspection of core and tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15. Number of fuel elemente and control rode in tank storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18. Air particulate. monitor ,

- (a) Operating and tracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..

. (b) Alarm test completed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7. Door 3162 S E C U R E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .'

+

~

m

  1. I
Arnni Ponu et lensvious soarions OF THIS FOnM ARE OSSOLETE.)

i . isocT.se l

t P

r . . - - . - - _ _ _ _

r VI. REACTOR CONTROL ROOM

. 1. E mergency air system R E S ET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2. Console recorder D AT E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. Stock ges recorder 8 fuel temp. recorder D ATE D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. 4. Logboo k D AT E D and R E V I EW E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5. Water monitor box (a) Background activity (ma) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b) Alarm test completed and alarm reset to 0.5 ma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c) Water monitor box conductivity. List resistivity in MG-cm (must be > 0.5 MG-cm) . . . . . . .

(d) DM1 conductivity. List resitivity in MG-cr1 (must be > 0.5 MD-cm) . . . . . . . . . . . . . . . . .

(e) DM2 conductivity. List resistivity in MG-cm (must be >0.5 MG-cm) . . . . . . . . . . . . . . . .

6. Stock ges flow rate ( K cfm ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7. Gas stock monitor

( a) Background (com ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

( b) Alarm check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c) High alarm sa t to 10 5 ,,, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

8. Stack particulate monitor (a) Backgrou nd ( cpm ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b) Alar m check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c) High alar m set to 2 x 10 3 ,,, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

9. Radiation Monitors ALARM POINTS READING ALARM SETTING .

MONITOR FUNCTIONAL (mR/hr) (mR/hr)

(a) R 1 500 (b) R.2 10 .

. (c) R 3 10 (d) E 3 10 (e) E-6 10 (f) R 5 (criticality) 50

10. Timer"ON"....................................................................

1 1. TV monitors "O N " . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12. Source level on log channel 2 0.5 ces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13. Check 0.5 cps source RWP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14. Time delay OPE R ATI V E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . .

~ 15. OPERATIONAL CHANNELS Cal Log Switch Pos No. Range Switch  % Linear  % Log 1 0.3 watt 2 30 watt 3 300 watt 4 1 kw

< 5 10 kw l 6 3 MW

16. Rod raising interlock for Mode i . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

l 17. Rod raising interlock for Mode 111 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

! 18. Zero power pulse (obtain signal w/ trip test before pulse). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

19. SCRAM CHECKS (insure each rod is checked with at least one scram) .+

t (a) Carriage movement (f) Fuel temp 2 (k) HV loss safety 1 (b) Fuel temp 1 O (e) Safety flux 2 O (1) HVloss safety 2 O (c) Safety flux 1 O (h) Timer I

(d) Manual (i) Emergency stop (e) Pool H 2O level (J) Reactor key I

' 20. Water temperature (IN LET) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

['

l

21. Period trip test for 1 KW interlock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~. .
22. APM high level audible alarm check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

l l

PAGE 2 of 2 J

[' .

rs

  • DAILY OPERATIONAL SHUT.DOWN CHECKLIST CHECKLIST No. DA TE TIME COMPLETED PERFORMED BY I. REACTOR ROOM (RM-3161)

- 1. All rod drives DOWN . . . . . . . .......... ....... . . .......................

2. Carriage lights O F F . . . . . . . . . . ........ .. ... .......... .. ... ...........
3. Door 3162 S E C U R E D . . . . . . . . ........................................ ....

- 4. Door 3161 locked with key. . . . . . . . . . . . . ............ ........................

fl. EQUIPMENT ROOM (RM-3152) a

1. Distillation unit discharge valves CLOSE D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. Ai r d ry er O P E R AT I O N A L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. Doors 231, 231 A, 3152 and Roof Hatch SECU R E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ill. EQUIPMENT ROOM (RM 2158)

1. Primary discharge pressure (PSI) . . . ................................................
2. Demireralizer flow rates set to 6 gpm ................................................
3. Visual in spe ction f or le a k s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. D oo r 2158 S E C U R E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

IV. PREPARATION AREA

1. ER 2 plug door CONTROL LOCKED; door CLOSED and handwheel PADLOCKED . . . . . . . . . . . . . .
2. E R 2 l igh t s O N_ a nd t h eo s ta t a t 10 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. ER 1 plug door CONTROL LOCKED: door CLOSED and handwheel PADLOCKED . . . . . . . . . . .. . .
4. E R I lights g a nd theosta t at 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5. Vi s ual in s pection o f a rea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

V. LOBB Y AREA L ob by ala rm a u d io @ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

AFRRI FORM 62 PREVIOUS EDITION OBSOLETE PAGE 1 of 2 21 AUG 84

r- ~ L.

VL REACTOR CONTROL ROOM (RM-3160)

1. Reactor tak light: O F F . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.TimerDEE.................................................................-

3. TV monitors 2EE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. Console L OC K E D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -
5. Diffuser and secondary pumps QEE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6. Purification and primary pumps O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7. Radiation monitors:

MONITOR READING HIGH LEVEL ALARM SETTING (mR/hr)

(a) R 1 20 (b) R-2 N/A (c) R 3 N/A .

(d) E 3 N/A (e) E-6 .N/A (f) R-6 (stack) N/A (g)R 5 (criticality) 20 a

. ~ .

r!

\,-

9 J

PAGE 2 of 2

.