_
12k?
x
- f' escnfreo UNITED STATES OF AMERICA USNac a
NUCLEAR REGULATORY COMMISSION
'65 CR 29 /\\l0Qo
- - - - - - - - - - - - - _ Atomic Safety and Licensing Appeal Panel Before the cc;JM 1.,EC% T/f y i
i
- Vmr
.i In the Matter of f
{
PHILADELPHIA ELECTRIC COMPANY hj Limerick Generating Stations
[ Units 1 and 2 NOS. 5 0-3 5 2 and 5 0-3 5 3 GI (i;' ' -
i!
i SUPPLEMENTAL MOTION OF THE GRATERFORD INMATES IN OPPOSITION TO THE APPLICANT'S REQUEST
__FOR AN EXEMPTION UNDER 10 C.F.R. 50.12(a) and (b).
N h
,1 I.
INTRODUCTION i
e The Inmates hereby incorporate by. reference their initial da Ii Motion in Opposition to the Applicant's Request for an Exemption under 10 C.F.R. 50.12(a) and (b) from the Requirements of Emer-gency Planning listed in 10 C.F.R. 50.47(a) and (b).
The appli-cant has requested th'is exemption from the emergency planning
. requirements outlined above as they apply to the radiological i
emergency response plan of the Pennsylvania Bureau of Corrections-with regard to the State Correctional Institute at Graterford, 6
In the applicant's request for said exemption, they led the Licensing Board to believe that they were ready to ascend to full power, but for the continuing litigation of the Graterford Inmates.
New evidence suggests otherwise, thus the I
Inmates file this Supplement.
8504010023 850329 PDR ADOCK 05000352 G
PDR bb3
enr~
4
~
f 7
i i
II.
LEGAL ARGUMENT - The applicant has misled the Board as to FI its state of readiness at the Limerick Generating Station with regard to its request to ascend to full power.
I j
On February 7, 1985, the applicant filed a Motion entitled, i
" Applicant's Motion for Exemption from the Requirements of 10 C.F.R. 50.47(a) and (b) as they Relate to the Necessity of Atomic q Safety and Licensing Board Consideration of Evacuation Provisions b of the Emergency Plan for the State Correctional Institute of f Graterford".
Attached to the applicant's Motion was an aff". davit executed by V.S.
Boyer, purported to be the Vice President of the Philadelphia Electric Company (see Exhibit "A").
In this af-l fidavit, Mr. Boyer states in paragraph 3,
that the Limerick Generating Station is a plant that "will be ready to proceed to power levels greater than allowed under our existing license by March 1, 1985".
The applicant supplemented this Memorandum byway of letter and attached affidavit on March 18, 1985, at which time they included a second affidavit signed by V.
S.
Boyer, Vice Presi-dent, Philadelphia Electric Company, stating in paragraph 4, "The schedule for the power ascension phase of operation of Unit 1 of the Limerick Generating Station is such that the plant will be ready to proceed to power levels greater than allowed under our existing license by the end of March, 1985."
(See Exhibit "B".)
s The applicant uses this affidavit in support of their contention that a grant of such an exemption under 10 C.F.R. 50.12 would be %
Sp
~ ~l h-
.io:
l((
n-
~
rz m.
4 '.
~
in:the public-interest. :On'page 7'offtheir Motion', they-re '
O m
i t e r a t'e that the " Limerick' facility will be physically ready to r;
begin operations.boveJ57. power by: March 1, 1985.
They further-s t a t e :. t ha t "any delays.'in its ~ preparation are'beyond.the control of the applicant".'(see=page 8).
.They then go on to cite numerous t1.. financial argumentsfthat-they contend will result in a consider-p-
f
-able loss.of money if said exemption is not granted.
I
.L i
On March 15, 1985, the same Vincent S.
Boyer, Vice Presi-dent of the Philadelphia Electric Company filed an application with the Delaware River Basin Commission requesting yet another
. exemption from the 59 degree temperature constraints on with-drawals of water from the Schuylkill River. -In a letter to the
. Delaware River Basin Commission by Edward G.
- Bauer, Jr.,
also a Vice' President and General Counsel for the Philadelphia Electric Company, he ' indicates-that ' "In order to proceed with the power ascension program after issuance of the license, it is necessary.
to have in place.a supplemental cooling water system."
-(See
. Exhibit."C" a t ta ch ed.-)'
Upon examination-of this request, it J.would appear to the Inmates that the Limerick-Generating Station I
is not yet ready to begin its power ascension program as pre-viously stated in Mr. Boyer's affidavits supporting their request for an exemption from further emergency planning now pending before,this Licensing Board.
The Inmates contend that Mr. Boyer, who' admittedly is " deeply involved in the licensing process" has mm
I I
~
.s x
. t n:
~
m,, v..
. p7.., ;w -
a,.
,j
. 2 w.,_
- _.N i.3,.,
s r 1g;L ; ; ;wv;y ' ~
3 a-x hs:nu;g-v, : : e.,_-
" =
s,
,.,s-
^,
[,
E
'", d. 3-h
- (1 4 ',1,:
c4~.
". (,
c.
' +
6; ' ' 3!
o
. 1 sr g :
s
. Qj?',
r m'isledE the1 Lic ensing Board :in an; at temp t -M to 7 gain; the exemption-vfg m
' a.
s
~
- a
c
- > :r e'q u e s t e d. h e r o i n. i T h e r I n m a t e s request a clarification on this.
n
(
r
. ~
theJBoardJsho'uld take this matter into iissueland'believelthat:
.m m,
~
. +..
s.
a
..~
a
'donsiderjarioniin their deliberations' regarding the applicant's-1 1
a.
u
- reque s t
- .f o rt: said exemp tion.
r
-3 "r
i 97, 1 ;1 -...
sn; Respectfully submitt e
.py
.. ~,
og o
m yg-
- (
g, lt A A k
-jl n
7j
_Y hAKTU f R. ' O E,'ESQUIKE j,
r Th ;
Attorney,.f r Inmates',- SCIG~
y n
- u. -- :,
m a
- 3. j e /
.. q:
m.
- l
~
- s,.
c M..
i_
y}lv
- e ce h,
a,
'n.. -
.t-
~ ~ -.U.i
~.'
k :_
9 e
T
-t N
T
'q gg,,,
1
- ~
+
Ai'
~
.(..
".t
?b 4,-
a A.
f
.'3',
f y
M s
/
.1 2
v
'--T,,'
y D0
)
igI4 r
+ 6e #l' J
+
,eL-g_
E
'-V
.e j
Y g-F,-
'L,"
Qg '.
i
.t s >
w
'Ap p
A^
f p
w 4
y y.
4 k.,,
s 4-
~
f
%y>, !
P.,..,f><
s
+
'?"
'aj
.+g.'-
'- (
7 -,
~.
I L
.e f
f
(..
..n 4
t,,',
I.'
.i n..
n
+ :.
44,
+
g
f%W y
L+
j
~
. l%d%~;.
- ~
'l
~
^
^
- 28^6c
,l P '
. [h b'
~ "_-
c:.
,.,f~lWyp,h:"
._f%,
~
2 yg.,
r l UNITED-STATES OF AMERICA-1 se n
DMg
~
4 NUCLEAR'RECULATORY'CONMISSION:
+
A x 7:
/
f efo're the tat'omic SafEtdy~ and Licensing AppeaO Panel-i B
ug:
s(
t.
3 1
-l_
?/
'{
j[:IQ[
W- "]Initbe*Matterofl c
C
^
'l
. L.
iPHILADELPHIA': ELECTRIC 0MPANY
- y
' [ w 7 LI.merick: Generating! Stations'
~ A
. Units'l and 2>
'NOS. 50-352'and 50-353
~
g 4'..
~
~
4 CERTIFICATE.OF-SERVICE' "QC >
EI,sAngtis1R.:L~ove, attorney for the/ Inmates at_the State-y x 1 J.CorrectionallInstitute;at Graterford, hereby certify-that a true e
- 6 f,'^^
.and Mccurate.copyJ.ofLthe Supplemental MotionLof the'Graterford
[
,4 3 Inmates inj0pposititon - to c the Appli' cant's. Request for an. Exemption luider L10?Cd.R..-.50:12(a) - and (b) e in reference to the above --
s
+
- ca'ptioned/ matt 6r,.was/ mailed first class, postage-prepaid, on-
~
I J
s x:
m l March' 0 2' 6), ul985", - to thei following lis t :
w:..
[*
-Administrative Judge' Helen F. Hoyt Martha W. Bush, Esquirei _
3
-.1.9 -
M-Atomic' Safety &~ Licensing Board.
. Municipal. Services:-Building.
4 U.S. Nuclear Regulatorp Conmission 15th & JFK Blvd.
A y
-Washington,7D.C.L20555 PhiladelphiaF PA 19107 -
f s
f~
- ). Administrative Judge. Jerry Harbour..
-Atomic Safety & Licensing'
- Atomic Safety & Licensing. Board
' Appeal-Board Panel-U.S. -Nuclear Regulatory Conmission -
U.S. Nuclear Regulatory Conmiscion
- Washington,~ : D.C. 20555.
Washington, D.C. 20555 i'
'Ahlinistrative' Judge Richard F. Cole
, Robert J.'Sugarman, Esquire w
Atomic Safety &. Licensing Board Sugarman, Denworth & Hellegers V
"U.S.; Nuclear Regulatory Conmission 16th F1, Center Plaza s.7
. Washington, D.C. 20555 101 North Broad Street Philadelphia, PA 19107
^,
LAnniP.lHodgdon, Esquire
-f^
Counsel for NRC Staff Docket & Service Section.
iOffice of the Executive Legal Director U.S. Nuclear Regulatory Conmission U.S.2 Nuclear Regulacory Conmission Washington, D.C. 20555 (3 copies)
- ; Washington, D.C.-20555
-]
of'
^
r
g-g 7
Mr. Robert L. Anthony Troy B. conner, Jr., Esquire 103 Vernon Lane, Box'186 Conner & Wetterhahn i
Nylan, PA 19065 1747 Penna. Ave. IG suite 1050 d
Washington, D.C. 20006 t
I David Wersan, Esquire
! Asst. Cosnumer Advocate Jay M. Gutierren, Esquire j Office of Consumer Adtucate U.S. Nuclear Regulatory Cm mission 1425 Stra#.>erry Square Regt n 1 631 Park Avenue
j Atomic Safety & Licensing Board Panel l, U.S. Nuclear Regulatory Corani.ssion Phyllis Zitzer
' Washington, D.C. 20555 Lincrick Ecology Action P.O. Fox 761 p Fr d P m o 762 Queen Street i61ForestAvenue Pottstown, PA 19464 h Arbler, PA 19002 q
& arles W. Elliott, Esquire
' 7_ori G. Ferkin, Esquire Counsel for Limerick Ecology Action 325 N. 10th Street
, Governor's Energy Council I P.O. Box 8010 Easten, PA 18042 p 1625 N. Front St.
' Harru, burg, PA 17105 Eugene J. Era dley, Esquire Counsel for Philadelphia Electric 2301 Market Street l Mr. Thomas Gerusky, Director Philadelphia, PA 19101 1 Eureau of Radiation Protection
- Dept. of Enviromrntal Resources Edward G. Bauer, Jr.
Fulton E,nk Euilding, 5th F1.
'; 'Ihlrd and unust Streets V.P. and General Ccunsel
( Harrisburg, PA 17120 Philadelphia Electric co.
ll 7301 Market Street i
j!
Philadelphia, PA 19101 g Spence W. Perry, Esquire g Associate General Counsel Steven P. Hershey, Esq.
y m, Poem 840 Cotmunity Legal Services, Inc.
h 500 Cr Street, SW 5219 Chestnut Street qkbshington,D.C.20472 Philadelphia, PA 19139 h
(h Sr. Resident Inspector Janes Wiggins ti U.S. Nuclear Regulatory Conmission hP.O. Box 47
.M,
Sanatoga, PA 19464
/
Tinothy R.S. Campbell, Director in, Mr sh!
gl Dept. of Eanrgency Services Ibntgomerv Cet ty legal Md
- 14 East Biddle Street Counsel for/ rutes, SCIG h
!! West Chester, PA 19330
/
hDirector, l Penna. D mrgency Management Agency
' Bascarnt, Transportation & Safety Bldg.
!Harrisburg, PA 17120 l
1 i
l i
Lt f
' STATE OF MARYLAND COUNTY OF MONTGOMERY Affidavit of V.
S.
Boyer V.
S..-B o y e r, being first duly sworn, states as follows:
1.
My name is V.
S.
Boyer.
I am Senior Vice President, Nuclear Power'of Philadelphia Electric. Company,
("the Company"),
owner and operator of the Limerick Generating Station.
I have been deeply involved with the construction, 1
- nsing, and operation of the Limerick Generating Station and oversee the efforts of the Company in the area of Emergency Planning for our
__/
nuclear generating stations. ~~ I am aware of the status
-7 of and responsibility for emergency planning efforts for the Limerick Generating Station on the part of the Commonwealth of Pennsylvania, the Federal Emergency Management Agency, local governments and the Nuclear Regulatory Commission.
2.
Annex 1 to Appendix E of the Bureau of Correction's Emergency Plan - the Radiological Emergency Response Plan for the State Correctional Institution of Graterford ("Graterford Plan") has been prepared by the Bureau of Correction of the Commonwealth of Pennsylvania.
Although the Company has provided assistance to many entities with radiological emergency planning responsibilities, neither the Pennsylvania EXHIBIT "h' k
m.;
t 4 m:
b.
Emergency-Management Agency nor Bureau of Corrections requested the.
assistance of Philadelphia Electric Company in.the development of the Graterford Plan.
The Company.
is,
- however, providing certain equipment required for~ the implementation. of the plan and requested by the Commonwealth.
3.-
The schedule for the power ascension phase of operation of Unit 1 of the Limerick Ge'nerating Station is such
~
that'the plant will be ready to proceed to power levels greater than allowed under our ' existing license by I
j March 1, 1985-4.
-Delays in the issuance.of approval for proceeding to full. power will - result in a delay in the commercial b
operation of the unit.
Such delays -will increase : the costs ' of: Limerick ~ Unit 1 by -$28 million per month.
This' cost' figure is made. up of $23 million per month
. AFUDC ~ and ~ $5 million per month operational, security and maintenance costs.
In addition, the fuel costs of the-Company's customers. will be increased -by
$15 lmillion.a month forleach month of delay.
h 5.
Any delays in the authorization for full power for Unit 1 ' may. alsoi impact on - the restart of construction of Unit 2.. The Pennsylvania Public Utility Commission is
. presently holding hearings on whether construction at Unit-2 should be-continued,- but in ' compliance with a T
y'.
3 w..
y:m.
m :, -
~
> p; h.
. Ii y.
3 0.
N cew,,
c...
pribr. order:. issuedE by the :PUC _ ' construction. of No. 2 tunit. ha's: be'en ; suspended until No.
1 is; placed in.
s fcommercialfoperation..
s m.
, o
' }/) tK:,& r f V
Senior Vice President-1 Ehubscribed;andsworntobefore:me
~
.this
~7th
'j
- day,of= February,:1985.
hjlu g G =
l g},3, : y,,
Notary. Publi_c :
_ren M. Thompson.
My ' commission'. expires :
July 1, 1986-W u
4 a
,F s
Ir i!.
[E.
s 1
[k.
M 2
w 9
1 r.
>s A
4 m
b.
5 BEFORE THE UNITED STATES NUCLEAR REGULATORY C0bMIISSION In the Matter of PHILADELPHIA ELECTRIC COMPANY Docket Nos. 50-352 (Limerick Generating Station Unit 1)
AFFIDAVIT OF V. S. BOYER V. S. BOYER, being first duly sworn, states as follows:
1.
My name is V. S. Boyer, I am Senior Vice President, Nuclear Power of Philadelphia Electric Company ("the Applicant"), owner and operator of the Limerick Generating Station.
2.
Ify affidavit of February 7, 1985 in support of Applicant's
!!otion for Exemption from the Requirements of 10 C.F.R. Section 50.47(a) and (b) provided, inter alia, certain infonnation relating to Limerick Unit 1 operating schedules and costs of delay in achieving commercial operation.
3.
As a result of Applicant's current evaluations of the status of Limerick Unit.1 and costs of delay it is necessary to update certain of the information provided in ny February 7,1985 affidavit.
4.
The schedule for the power ascension phase of operation of Unit v.
1 of the Limerick Generating Station is such that the plant will be ready to proceed to power levels greater than allowed under our existing license b_y_thq end of March, 1985 T
EXHIBIT "B"
YW
).
K.
h.
{'
V {-
[
5.
Delays in the issuance of approval for proceeding to full power will result in a delay in the commercial operation of the unit. Such delays will' increase the costs of Limerick Unit 1 by $34 million per month. This cost figure is made up of $24 million per month AFUDC and $10 million per month operational, security.and maintenance costs.
In addition, the fuel costs of the Company's customers will be increased by $15 million a month for each month of delay.
6.
The remainder of my February 7,1985 affidavit is unchanged.
V. S. Boyef' Sybscribed and sworn to before me this /42 day of March, 1935.
AA Notary Public F.: RICIA O. IONoLL
% rf puti;,py:3eg3 p,,g gg,.
b & N G'T3!G.1 EQtid; Fgb;;gn Q gjg wt
e g
%y[ f.. -
[
1 PHILADELPHIA ELECTRIC COMPANY 7
'8 2301 MARKET STREET P.O. BOX 86 99
- PHILA D ELPHI A. PA.19101
' 4'c KowARoc.sAutR Je.
g gg 1S85
~
EUC CM E J. G R AC LEY DOM AL3 SLAMM EH RUQOLP64 A. CHILLEMI E. C. Mt R M H A LL
. Y. H. M AN CR CO R N ELL PAUL AUCR S ACH March 15, 1985 sow ARo a. Cuu.cu. Ja.
TM O M AS H. 84ILL E R J R.
IR CM E A. M.M E N#t A '
.....u........
Ms. ' Susan Welsman, Secretary.
Delaware River Basin Commission P. 0. Box 7360 West Trenton, New Jersey 08628
Dear Ms. Weisman:
Transmitted herewith for filing with the Commission is Philadelphia Electric Company's Application under Sectica 3.3 of the Ccmpact for approval of the temporary substitution, during 1985, of in-stream monitoring of dissolved oxygen levels in place of the 590F temperature censuraint on withdrawals for Limerick Generatirg Station Unit No.1 incorporated in Docket Decision 69-210CP (Final) November 5,1975, and as necessary release of varying amounts of water, not exceeding 32.5 cfs, from water supply storage during 1985.
L This filing consists of six copies of the following documents: a) completed DRBC application form, including Attachments 1 and 2 and Exhibits 1 through 8 thereto; b) completed DRBC Environmental Fom; and c) completed Applicant's Statement - Project Review Fee Fom.
Enclosed is Philadelphia Electric Company's check in the amount of $100 to cover the Project Review Fee.
The ' affidavit 'of Vincent S. Boyer, Senior Vice President, Nuclear Power, Philadelphia Electric Company, which is part of Attachment 2 of the application, indicates that issuance of a full power license frem the Nuclear Regulatory Commission for Limerick Unit No.1 can be anticipated about May 1, 1985; that in order to proceed with the power ascension program after issuance of the license it is necessary to have in place a supplemental cooling water system; that delays in proceeding to full power will delay commercial operation of the unit, and that the cost of not operating the unit for lack of water is estimated to be $49 million per month.
EXHIBIT "C"
~
+
. P 5..
lT h
Accordingly, the Company requests immediate action on its application, 4
' pursuant to Section 2-3.9(c) of the~Ccmmission's Rules of Practice and y
. Procedure Lto-protect the public interest 'and to avoid substantial and
~
. irreparable injury to the public and to the Company.
Communications regarding this application should be directed' to the Jundersigned, e,
t-Very truly yours,
?
I.. -
p 1
Edsard G.
uer, Jr.
(EGB JR:pkc g-Enclosures.
r-i h]
e
} :'
?
k' m
m.
m=,,
3f
, [.
~
^?
~ ~ ~ ~
~ ~~
~ ~ '
~
+
g
~.
1.
DE(. AWARE RIVER ' BASIN-COMMISSION A
+
p-i-5 S.
(Type of Application: f(Check one or more -see reverse side) i(c)l LAddition to t he Comprehensive Plan...........,............. (. )
i
. (b)L: Change in a Comprehensive Plan' Pro ject.................... ( )-
- (c) Approvo1 under Section 3. 8 of the Compact................. (X)
J v.
((d) L!nclusion in "A-List" cf the Water Resources Program......... ( ).
_4 N ursuant to the Delow' ore River Bosin Compact P
g.
5 ond'the' P,ules of Practice and Procedure of the For Use of Commission IDelaware P.iver-Basin Commission, cpplication Docket No.
is;hereby made for resiew of the project des-Dole Received
- cribed below:'
Action by Commission 1
i s{
[ h :(A)
" Application From:
z
! N. cme' Philadelchia Electric'
- ..c 7
~
Mciling Address 2301 Market Stree_t,
. Philadelphiai-PA 19101' Telephone (215) 941-4000 J Nome of Counsel Edward G. Bauer, Jr.
F ard Eugene!J. Bradley v
Nome of. Engineerv. S. Boyer 1
- (B)
Type of Project: (Check)
%~~
(I) 11mpoundment................( )
L(4) Stream Encroachment.......( )
(2) - Withdtcwol of Water.........(x).
(5). We l l..................... ( )
(3) l Disposal of Wast es...........('.)
(6) O t h e r.................... ( )
(C)
Description of. Project:
v - en m -n*ina,,en F,cr 1985, withdrawal of water frem the ScNyWi11 War n
o
, at Limrick Generatina' Station Unit No.1 by terarv subs *i*ution of in-g*
stream monitoring of distnived oxyaen leve s in olace of 59 F te_ra*ure l
constraint incorporated in Docket tb.69-210 CP (Final)- (Novenber 5,1975);
' and as necessary, release of varvim amm*s of m&pr m* -caar'ine' W 9 A, frcm water sucolv storace as a-rwia*n. *ha neu e e % in* mnus in 1~
~
said docket to be inacolicable to any such releases.
Signcture of Authorized Person Nome v. s. sever Titic Senior Vice,Presiden_t:.,
Doicg/f/3ff,,@231_earpme -
C
pww-l
[
Delaware River Basin Commission f
ENVIRONMENTAL FORM Applicant j Philadelphia Electric Comany Dote 3[f*/d)f"
. Title of Project Interim consumptive water supply Location Limerick Generating Station DRBC Docket No.
I.
List any significant enviranmental impacts, beneficial and advene," caused by the proposed action.
The beneficial-impact of-the requested tcrporary substitution of instream renitoring of dissolved oxygen levels in place of the 59CF tcene.rature constraint ard the requested release of water frcnt the Blue thrsh Pes.uvoir or other basin water sucoly storaces as a back-uo sur:oly will be to cermit scheduled cceration of Limerich, already evaluated bv the DRDC.___ See, - DPEC FEA for Neshaminy Rater Supolv Systern (Aum:st 1990) ; DPEC Level B Study; and AEC/NTC FES for Limerick (Noverber 1973 and Acril 1980. There will be no adverse impacts frcm the temporary susoension of' the 590F tccperature constraint.
(See Paragraph below). There will be m adverso 'irmets fr-m the releaso of water frcm Blue Marsh Resem See,' CCE E S for Blue Marsh (April 1971l: th= Sucolement to the CCs_ucTc: for' Blue Krsh la xe 1973); ard the DPEC Tafel B Studv (May 1981). See Attachnent 1.
y2.
% hot mitigati.ng measures will be used to reduce er alleviate the adverse environmental impacts ?
There will be no adverse imnacts frtm the tctrrerarv suerension of the 59 F tenmrat-tre 0
constraint. Decradation of wate-iality of tha Schuvikill River balew the Li: erick
'A Generatirn Station will be creclu5ed by instream ronitorina of dissolvad oxwen levels and releases frem t. rater surolv stcrace when to levels fall Mim a~ eneabie lerels.
7here vill be no adverse irmctn fem the rwan~~t r=1==can nf W a* F-w="*-
sucolv storace. Thus, m mi r_ iga ti'r' '"a= wan nam h= Ma-*h y
3.
Summar!::e the citernatives considered.
The alternatives considered were (1) no action, (2) release of water fran the Ontelaunee Reservoir, and (3) release of water frera Green Lane Resentir. See
' Attachnent 2.
.+.:
4.
List any known objecton to the proposed oction.
tbne.
e,n gagg.--
j
~ 1 - M_
^
' APPLICANT'S STATEMENT - PROJECT REVIEW FEE
s._ 50.,,000 -
. g. Construetion 'and Fabric'ation '
45,000
'O TOTAL ESTIMATED PROJECT COST Footnotes / Remarks non-structural - tercrary_ suspension of 59CF tagerature constraint ard release of varyirq amounts not exceeding 32.5 cfs of water
. supply storage frcm Blue Marsh Reservoir or other basin w1ter supply stcrage,-
-~~
as appropristiE~,ih 19Bb.
5.L Filing Fee ScheduIe (Check applicable it'ern(s))
E(The filing fee is the greater of (a) or (b)),,
Computations X _(a) minimum fee: $100. for any projects or1 (a)$
100.
(b) ~afternative feen (b)
(1) _1/10, of,1%' of estimated.,p'roject cost up to $1,000,000.
(1) $
(2) 1/50 of.1% of remaining cost above $1,000,000, but not
-(2)$
to exceed'a maximum fee ' f $50,000 as to any one project, l
~
o
" ~ '
PM =
exclusive,of added environmental fe'es..
100.00 Total $
~
6.' Fifing Fee Required with Appilcation
- Please enclose check in this amount with application. Check should b made payable to Defaware e
. River Basin Cornmission.
NOTE: Should this pro [ect require an EnvironmentalImpact Statement or an Environmental Assessment, you wit! be notified at 'a later date and on Applicant'sf Statement. Environmental Review Fee will be forwarded for completion and 'poyment of oc ficable fee.'-
i Signature of Certifying Official
> Date
- 3. /
[
' Senior Vice President; Nuclear Power s' Title
,, ACKNOWLEDGMENT BY ORBC OF FEE PAYMENT -
Received Check' No.
., dated
, Bank No. ___
5 in amount of
. COPIES: (t) Admintetrettee Divisten Cepr - whit
- Signature
'O" -
(t) APPLICANT - Retale Tble Copy - pink -
-(si Applicent - DRBC Reeelsted Copy - rellow (4) Projoes Review Copr -- blee uh-