Text
_ _ - - - _ _ _.
,-.m k
UNITED STATES j
p i..
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30086-0001 i
eup THE CLEVELAND ELECTRIC ILLUNINATING COMPANY. ET AL.
I DOCKET NO. 50-440 i
PERRY NUCLEAR POWER PLANT. UNIT NO. I l
AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 78 License No. NPF-58 1
1.
The Nuclear Regulatory Commission (the Commission) has found that:
1 l
A.
The application for amendment by The Cleveland Electric Illuminating Company, Centerior Service Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated January 10, 1996, complies with the standards i
and requirements of the Atomic Energy Act of 1954, as amended (the i
Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility Wil operate in conformity with the application, the 4
i provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; f
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of i
the Commission's regulations and all applicable requirements have been l
satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and 1
paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby i
amended to read as follows:
l 9601310211 960119 DR ADOCK 0500 0
.._~. -
i-
)
i '.
\\
(2) Technical Snecifications i
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 78' are hereby incorporated into this license.
1 The C eveland Electric Illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
1 i
3.
This license amendment is effective immediately.
FOR THE NUCLEAR REGULATORY COMMISSION N
i i
Gail D. Marcus, Director Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation i
Attachment:
Changes to the Technical l
Specifications i
Date of issuance:
January. 19, 1996 i
9 I
l i
i l
4 i
b e
)
4
-n.
y
~, ~.
n-
~
i i
ATTACMENT TO LICENSE AMENDMENT NO. 78 i
FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
Remove Insert 3/4 1-5 3/4 1-5 3/4 3-8 3/4 3-8 3/4 6-8 3/4 6-8 3/4 6-8a
I l
~
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1.3.2. 4.1.3.3. 4.1.3.4 and 4.1.3.5.
1 4.1.3.1.4 The scram discharge volume shall be determined OPERABLE by j
demonstrating:
a.
The scram discharge volume drain and vent valves OPERABLE at least once per 18 months
- by verifying that the drain and vent valves:
l l
1.
Close within 30 seconds after receipt of a signal for control rods to scram, and j
2.
Open when the scram signal is reset.
t b.
Proper level sensor response by performance of a CHANNEL FUNCTIONAL TEST of the scram discharge volume scram and control rod block level t
ipstrumentation at least once per 31 days.
i i
i i
i l
Operability testing may be extended to be performed during the fifth refueling outage.
PERRY - UNIT 1 3/4 1-5 Amendment No. 78 t
I 6
=
I g.
E l
TABLE 4.3.1.1-1 (Continued)
E G
REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREENTS CilANNEL OPERATIONAL CHANNEL FUNCTIONAL CHANNEL CONDITIONS IN WHICH
'~
FUNCTIONAL UNIT CHECK _
TEST CALIBRATION SURVEILLANCE. REQUIRED t'
8.
Drywell Pressure - High S
0 R
- 1. 2"'
9.
Scram Discharge Volume Water Level - High a.
Level Transmitter S
Q R"
- 1. 2, 5*'
b.
Float Switches NA 0
R
- 1. 2. 5*'
- 10. Turbine Stop Valve - Closure NA Q
R 1
..2 t
- 11. Turbine Control Valve Fast i
w&
Closure. Valve Trip System Oil i
Pressure - Low NA Q
R 1
l
- 12. Reactor Mode Switch Shutdown Position NA R
NA 1., 2. 3. 4. 5 l
i
- 13. Manual Scram
~
NA W
NA 1,2.3.4,5 l
I (a) Neutron detectors may be excluded from CHANNEL CALIBRATION.
(b) The IRM and SRM channels shall be determined to overla for at least 1/2 decades during each startup after entering OPERATIONAL CONDITION 2 and the IRM and APRM channels shall be detensined to overlap for at least
=
1/2 decades during each controlled shutdown, if not perfonned within the previous 7 days.
r+
y (c) Deleted i
h s
. ~.,
. - - = -.
CONTAINMENT SYSTEMS
\\
MSIV LEAKAGE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION i
3.6.1.4 Two' independent MSIV leakage control system (LCS) subsystems shall be
[
2 i
f APPLICABILITY: OPERATIONAL CONDITIONS 1*. 2*, AND 3*.
i ACTION:.
With one MSIV leakage control system subsystem inoperable, restore the -
i i
rable subsystem to OPERABLE status within 30 days or be in at least HOT 5
N within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS
. 4.6.1.4 Each MSIV leakage control system subsystem shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying:
'J.
Blower OPERABILITY by starting the blower (s) from the control room and operating the blower (s) for at least 15 minutes.
i 2.
Inboard heater OPERABILITY by demonstrating electrical i
continuity of the heating element circuitry by verifying the inboard heater draws 8.28* 10% amperes per phase.
- b. 'During each COLD SHUTDOWN. if not performed within the 3revious 92 days, by cycling each motor operated valve, including t1e main l
l steam stop valves, through at least one complete cycle of full travel.
j j
l c.
At least once per 18 months by:
I 1.
Performance of a functional test ** which includes simulated actuation of the subsystem throughout its operating sequence, and verifying that each automatic valve actuates to its correct position, and the blower (s) start (s).
2.
Verifying that the blower (s) develop (s) at least the below required vacuum at the rated capacity:
a)
Inboard system 15" F,0 at = 100 scfm.
b) Outboard system,15" H O at = 200 scfm.
2 The provisions of Specification 3.0.4 are not a>plicable from the effective date of this amendment until the completion of Operating Cycle 6.
Required testing may be extended to be performed during the fifth refueling outage.
PERRY - UNIT 1 3/4 6-8 Amendment No. 63, 11, 78
CONTAISIENT SYSTEMS
_MSIV LEAKAGE CONTROL SYSTEM SURVEILLANCE RE001REMENTS (Continued) d.
By verifying the inboard flow and inboard and outboard pressure instrumentation to be OPERABLE by performance of a:
1.
CHANNEL FUNCTIONAL TEST at least once per 31 days, and 2.
CHANNEL CAllBRATION at least once per 18 months **.
i Required testing may be extended to be performed during the fifth refueling outage.
PERRY - UNIT 1 3/4 6-Ba