Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E741 + (ML20095E741)
- ELV-03653, Responds to NRC 920414 Telcon Request for Addl Info Re Thermal Design Flow & Analyses of Inadvertent Opening of SG Relief or Safety Valve,Steam Sys Supply Failure & Main Steam Line Break Info Used for Superheat Study + (ML20095E743)
- ML20095E747 + (ML20095E747)
- ML20095E750 + (ML20095E750)
- ML20095E752 + (ML20095E752)
- ML20095E758 + (ML20095E758)
- ML20095E760 + (ML20095E760)
- RBG-42272, Clarifies Intent to Match SR 3.0.2 Re Extensions to Surveillance Intervals Proposed in 951024 License Amend Request 95-21,to Generic Implementing Specs in NRC + (ML20095E770)
- RBG-18597, Interim Deficiency Rept DR-219 Re Design Loads of Conduit Supports.Interim or Final Status Rept Will Be Provided by 841101 + (ML20095E771)
- ML20095E772 + (ML20095E772)
- ML20095E775 + (ML20095E775)
- RBG-18596, Interim Deficiency Rept DR-220 Re License Indications on Valve Seats of Cylinder Leads in Standby Diesel Generators Supplied by Tdi.Interim or Final Status Rept Will Be Submitted by 841101 + (ML20095E799)
- ML20095E803 + (ML20095E803)
- ML20095E808 + (ML20095E808)
- ML20095E814 + (ML20095E814)
- 05000336/LER-1995-043, :on 951115,reactor Core Power Exceeded Rated Thermal Power of 2,700 Mw for Period of 11 H.Caused by Personnel Error.Changed Procedure OP 2316A + (ML20095E818)
- ML20095E820 + (ML20095E820)
- ML20095E826 + (ML20095E826)
- ML20095E831 + (ML20095E831)
- TXX-4273, Advises of Adoption of Westinghouse Generic Core Damage Assessment Methodology,In Response to NUREG-0737,Item II.B.3, Post-Accident Sampling Capability + (ML20095E846)
- ML20095E847 + (ML20095E847)
- ML20095E856 + (ML20095E856)
- ML20095E858 + (ML20095E858)
- ML20095E859 + (ML20095E859)
- ML20095E862 + (ML20095E862)
- ML20095E873 + (ML20095E873)
- TXX-4276, Informs That Qualification Maint Program Described in FSAR Section 2.4,App 3A Will Be Fully Implemented Prior to Unit 1 Fuel Load + (ML20095E875)
- ML20095E876 + (ML20095E876)
- TXX-4268, Application to Amend CPPR-126,reflecting Partial Exemption from 10CFR50,App a Requirements (GDC-4).Fee Paid.Affidavit Encl + (ML20095E880)
- ML20095E881 + (ML20095E881)
- RBG-42241, Special Rept:On 950912,EDG Failed to Start During Test. Caused by Machining Errors Caused by Mfg Resulted in Binding Between Piston & Bore + (ML20095E885)
- ST-HL-AE-5236, Forwards Change QA-026 to Rev 4 to Operations QA Plan Control & Issuance of Documents + (ML20095E893)
- ML20095E897 + (ML20095E897)
- ML20095E902 + (ML20095E902)
- ML20095E903 + (ML20095E903)
- ML20095E907 + (ML20095E907)
- ML20095E910 + (ML20095E910)
- ML20095E913 + (ML20095E913)
- ML20095E914 + (ML20095E914)
- ML20095E918 + (ML20095E918)
- RBG-42289, Submits Info in Response to follow-up Questions Re Plant Request for Use of ASME Code Case N-509.Detailed List of Integrally Welded Attachments to Assist in NRC Review, Attached,Per Request + (ML20095E924)
- ML20095E926 + (ML20095E926)
- ST-HL-AE-5246, Forwards Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (ML20095E932)
- ML20095E935 + (ML20095E935)
- ML20095E943 + (ML20095E943)
- ML20095E945 + (ML20095E945)
- 05000275/LER-1984-020, :on 840719,diesel Generator 103 Automatically Started Due to Undervoltage on Unit 2 Bus F.Caused by Const Workers Inadvertently Jarring Relay Panel & Actuating Undervoltage Relay + (ML20095E946)
- TXX-9530, Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station + (ML20095E947)
- ML20095E948 + (ML20095E948)
- ML20095E949 + (ML20095E949)
- ML20095E950 + (ML20095E950)