Monthly Operating Repts for Nov 1995 for Catawba Nuclear Station
ML20095E949
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/30/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20095E942 List:
References
NUDOCS 9512180217
Download: ML20095E949 (12)


Text

.

j i

OPERATINE DATA REPORT DOCKET NO 50-413 BATE December 15.'1995 GPERATINGSTATUS COMPLETED BY R.A. Willians TELEPHONC 704-382-5346

1. Unit Mase: Catamba 'i 2.ReportingPeriodiNovember1,1995-hveeber 30,1995 30LicensedTherealPower(MWtle 3411 4.NaseplateRating(6rossMWe):

13056 Notes ellaseplate Rating 50 Design Electrical Rating (Net MWe):

1145 (6ross MWe) calculated as -

6. Marleue Dependable Capacity (Gross MWel:

1192 1450.000 IWA a.90 power.

7. Maxleus Dependable Capacity (Net MWelt 1129 factorperPagelit,
8. If Changes Occur in Capacity Ratings (itees flueber 3 Through 71 Since Last lluRE6-0020.

1 Report. Give Reasons:

1. Power _ Level To Which Restricted, If Any (Not Ne):

10.ReatenForRestrictions,ifany:

ThisMonth Yr.-to-Date Cueulative

!!. Hours In Reporting Period 720.0 8016.0 91369.0

12. Nueber of Hours Reactor Was Critical 720.0 7030.1 71549.7
13. Reactor Reserve Shotdoen Hours

-+-

--0--

- 14. Hours Generator On-Line 720.0 6969.2 70344.7

15. Unit Reserve Shutdown Hours - - 16. Gross Thereal Energy Generated (MWH) 2441705 23288227 229431658
17. Gross Electrical Energy Generated (WH) 879493 8311911 80995441
18. Net Electrical Energy Generated (MWH) 833458 7861020 76184482
19. Unit Service factor 100.0 84.9 77.0
20. Unit Availability Factor 100.0 84.9 77.0
21. Unit Capacity Factor (Using MOC Net) 102.5 86.9 73.6
22. Unit Capacity Factor (Using DER Net) 101.1 85.7 72.8
23. Unit Forced Outage Rate 0.0 0.6 8.3
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - May 31, 1996 - 100 days

25. If Shut Down At End Of Report Period. Esticated Date of Startup:
24. Units In Test Status (Prior to Cosearcial Operation):

Forecast Achieved INiilALCR!i!CALITY IN!ilALELECTRICITY COMERCIAL OPERATION 9512180217 951212 PDR ADOCK 05000413 R_

.PDR m

_ 1

l 1

l i.

OPERATING DATA REPORT TACKET NO 50-413 I

IMIT Catawba 1 1

DATE Deceeber 15. 1995 f

COMPLETED BY R.A. Willines TELEPHONE 704-382-5346 MONDI Noveeber. 1995

gif, AVERAGE DAILY POWER LEVEL QA1 AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1852 17 1161 2

1148 18 1137 3

1149 19 1160 0

1860 20 1159 5

!!62 21 116?

6 1159 22 1165 7

1156 23 1162 8

1158 24 1162 9

1160 25 1162 10 1158 26 1159 11 1152 27 1155 12 1161 28 1150 13 1159 29 1156 14 1159 30 1164 13

!!60 16

!!61 l

9

' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME urantsa 1 DATE 12 / A d / n i

REPORT MONTH November 1995 COMPLETED BY x.

A.

williams TELEPHONE t > u e ; - 3 es 2 - 3.5 e b (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE

'N Y

S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S i

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sneets For Licensee C-Refueling 3-Automatic Scram-Event Report (LER)

D-Regulato n Restriction 4-Other (Explain)

File ( N G-0161)

E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

G-Operator Error Exhibit I - Same Source H-Other

-a m

________.m_____._________________._

{.

i,,

DOCKET: 50-413 UNIT: Catawba 1

. Date: 12/15/95-t NARRATIVE

SUMMARY

MONTH: November 1995 Catawba Unit I began the month of November operating at 100% full power.1he unit operated at or near -

~

100% full power for the entire month.

P 4

4 4

1 4

4 1

J J

Prepared by: R. A, Williams Telephone: (704)-382 5346

MONTilLY REFUELING INFORM,. TION REOUEST 1.

Facility name:

Catawlm Unit i 2.

Scheduled next refueling shutdown: Mav 1996 3.

Scheduled restart following refueling: Scotember 1996 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: MQ 8.

Present licensed fuel pool capacity: 1411 Size of requested or planned increase: :::

{

9.

Projected date oflast refueling which can be accommodated by present license capacity:

Scotember 2002 l

j DUKE POWER COMPANY DATE: December 15.1995 i-Name of

Contact:

R. A. Williams Phone: (704) - 382-534fi 4

(

i e

n OPERAi!NG DATA REPORT DOCKET NO,,,__ L-414 DATEgreenber 15. 1995 OPERATING SI G Cor LETED BY R.A. Williaes TELEP4ONE 704-382-5346

1. Unit Nase Catawba 2
2. Reporting Period Novesber 1, 1995-November 30,1995
3. Licensed Thereal Power (MWt):

3411

- 5. Design Electrical Rating (Not m):

lit 5

_ Notes' *E seplate Rating

t. Naseplate Rating (Gross m ):

1305e (6 toss m i calculated as

6. Maxinus Dependable Capacity (Stoss MWe):

!!92 1450.000 IM :.90 power facter per Page lit,

7. Manieve Denendable Capacity (Not MWe):.

!!29 NURE6-0020.

I, If Changes occur in capacity Ratings (Itees Number 3 Through 71 Since Last Report. Give Reasons:

9. Power Level to Which Rcstricted, if Any (Net MWel
10. Reason For Restrictions, if any __

This Monti Yr.-to-Date Cueulative

!!. Hours in Reporting Period 720.0 80J6.0 81385.0

12. Musber Of Hours Reactor Was Critical 54.6 6412.9 63422.2
13. Reactor Reserve Shutdown Hours

--0--

--0--

-+-

- 14. Hours Generator On-Line 15.4 6332.3 62393.7 15.UnitReserveShutdownHours -

--0--

--0--

16. Gross Theraal Energy Generated (MWHI 9749 21331903 201030786
17. Gross Electrical Energy Generated (MWH) 1439 7548982 71248362
18. Net Electrical Energy 6etierated (MWHI

-13477 7134205 67099758 19.UnitServiceFactor 2.1 79.0 76.7 20.UnitAvailabilityFactor 2.1 79.0 76.7

21. Unit Capacity Factor (Using MDC Net!

0.0 78,8 72.9

22. Unit Capacity Factor (using DER Nell 0.0 77.7 72.0
23. Unit Forced Outage Rate 95.6 10.1 9.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estleated Date of Startup:

26.UnitsinTestStatus(PriortoCoseercialOperation):

Forecast Achieved INiilALCRii! Call 1Y INiilAL ELECTRICITY COMMERCIALOPERAi!0N

i

3 s

\\

'OPEM TING NTA REPORI' 90(*ET 110 50-414 Ipili Catauha 2 NTE December 15. 1995<

' COWLFTER BY ' R.A. Ililliaan

'TELEPMWE 704-302-5346:

-HONTH

'lieventer. 1995 inue

  • t)

'Ine

  • ti

, 0 li 0'

-21

-0 18 0

3 0

11 0

4 0

M 0

~

5 0

21

-0 6

0 N

0 j.

7 0

23 0

8 0

M 0

1 t

0 n

0 i

10 0

24 0

0 27 0

12 0

28 0

l 13 0'

29 0

i 14 0

30 17 15 0

L' 16 0

t l

fi

~

UNIT SHUTDOWMS AND POWER REDUCTIONS DOCKET Nd.

50-414' UNIT NAME arawsA 2 DATE 12/13/3d REPORT MONTH November 1995 COMPLETED BY x.

A.

williams PAGE 1 OF 3 TELEPHONE t/usi-duz-deso (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE M

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 6

95 1 S

359.43 C

RC FUELXX END-OF-CYCLE 07 REFUELING OUTAGE 7

95-11-15 S

10.00 A

CG XXXXXX OUTAGE EXTENDED 0.4 DAYS DUE TO ADDITIONAL PRIMARY SYSTEM CLEAN-UP 8

95-11

.'.6 F

124.00 A

SF VALVEX 5.2 DAY OUTAGE DELAY DUE TO REPLACEMENT OF SAFETY INJECTION CHECK VALVE 9

95-11-21 7

60.00 A

WG HTEXCH 2.5 DAY OUTAGE DELAY DUE TO DIESEL GENERATOR

'2B' HEAT EXCHANGER REPAIR 10 95-11-24 F

40.00 A

SF PUMPXX 1.7 DAY OUTAGE DELAY DUE TO

'2A' SAFETY INJECTION PUMP SEAL LEAK REPAIR 11 95-11-25 F

46.00 A

CB VALVEX 1.9 DAY OUTAGE DELAY DUE TO POWER OPERATED RELIEF VALVE REPAIR (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee C-Refueling 3-Automatic Scram Event Reoort (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

[-

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 i-UNIT NAME taransa 2 DATE 12/1d/3d___

REPORT MONTH November 1995 COMPLETED BY x.

A.

w1111ams PAGE 2 OF 3 TELEPHONE

(/uei-Jez-33sb (1)

(2)

(3)

(4)

(5)

R MET-1 E

HOD T

A OF LICENSE W

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 12 95-11-27 F

22.00 A

CB XXXXXX O.9 DAY OUTAGE DELAY DUE TO

'2B' REACTOR COOLANT PUMP SEAL LEAK-OFF PROBLEM r

13 95-11-28 F

18.00 A

EE ENGINE 0.8 DAY OUTAGE DELAY DUE TO DIESEL GENERATOR

'2B' VOLTAGE OSCILLATIONS 14 95-11-29 F

13.00 A

WB VALVEX 0.5 DAY OUTAGE DELAY DUE TO COMPONENT COOLING VALVE REPAIR i

15 95-11-29 F

9.38 A

WB PUMPXX 0.4 DAY OUTAGE DELAY DUE TO '2A2' COMPONENT COOLING PUMP SEAL LEAK REPAIRS 4-P 95-11-30 S

B HA TURBIN MAIN TURBINE OVERSPEED TRIP TEST SOAK 16 95-11-30 S

2.80 B

HA TURBIN MAIN TURBINE OVERSPEED TRIP TEST r

l (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee l

C-Refueling 3-Automatic Scram Event Report (LER) l D-Regulato n Restriction 4-Other (Explain)

File ( M EG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain) i l

i l

i f

b l

l l

i

UNIT SHUTDOWNS AMD POWER REDUCTIONS DOCKET NO.

50-614 UNIT NAME Carawtsa 2 DATE 12 /1d / n REPORT MONTH November 1995 COMPLETED BY x.

a.

williams PAGE 3 OF 3 TELEPHONE

( > u s J - $ ts 2 - d.$ 4 6 r

(1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 5-P 95-11-30 F

A CG VALVEX VOLUME CONTROL VALVE MALFUNCTION l

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato n Restriction 4-Other (Explain)

File. (NG-0161)

E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

- ~... _.

1, 1

DOCKET: 50-414 -

UNIT: Catawba 2 Date:.12/15/95 NARRATIVE

SUMMARY

MONTH: November 1995 Catawba Unit 2 began the month of November in end-of-cycle 07 refueling outage. He refueling outage spanned 54.31 days and was scheduled for 40 days. The refueling outage was extended 0.4 days due to additional primary system clean-up. He following items delayed the refueling outage an additional; 5.2

. days due to replacement of safety injection check valve,2.5 days due to diesel generator '2B' heat

- cxchanger repair,1.7 days due to '2A' safety injection pump seal leak repair, 1.9 days due to power operated relief valve repair, 0.9 days due to '2B' reactor coolant pump seal leak-off problem,0.8 days due to diesel generator '2B' voltage oscillations,0.5 days due to component cooling valve repair,0.4 days due to '2A2' component cooling pump seal leak repairs. The unit was placed on line 11/30/95 at 0549. The unit increased power to 14% power and held from 0616 to 1240 due to main turbine soak. On 11/30/95 at 1445 the turbine overspeed trip test was performed and the unit was placed on-line at 1735. During power escalation, the unit held at 14% power from 1826 to 2220 due to volume control valve malfunction. The unit began decreasing power at 2220 due to the volume control valve malfunction and ended the month operating at approximately 10% power.

Prepared by: R. A. Williams Telephone: (704)- 382 5346 a

-- m

. -. - - ~

l i

!~.

1 MONTHLY REFUFI ING INFORMATION REOUEST I.

Facility name:

catawba. Unit 2 2.

Scheduled next refueling shutdown: March 1997 3.

Scheduled restart following refueling: Anril 1997 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.

4 l

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

i j

If yes, what will these be?

1 i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

1 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

i 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

l 7.

Number of Fuel assemblies (a) in the core: 12.1

_ (b) in the spent fuel pool: 524 i

8.

Present licensed fuel pool capacity: 1411 i

Size of requested or planned increase: =

1 9.

Projected date oflast refueling which can be accommodated by present license capacity:

sentember 2011 DUKE POWER COMPANY DATE: December 15.1995 i

j Name of

Contact:

R. A. William

  • Phone: (704). 382-5346 l