ML20095E862

From kanterella
Jump to navigation Jump to search
Forwards Suppl BVPS Unit 2 Rept of Facility Changes,Tests & Experiments Nov 1993 - Oct 1994. Rept Provides Description of Facility & Procedure Changes & Summary of SEs for Temporary Mods Not Included in 950505 Rept
ML20095E862
Person / Time
Site: Beaver Valley
Issue date: 12/11/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095E867 List:
References
NUDOCS 9512180190
Download: ML20095E862 (1)


Text

_ . _ . . . . _ _. ._ _ _ __- ._ _ _ _ _ _ _ _ _ . _ _. _ . _ . . . _ - _ _ _ _ _

  • Beaver Valley Power Station 8 "

. <liy3%",72d[^"#'

(412) 643-8069 FAX December 11, 1995 GEORGE S. THOMAS

$."$'*IJ**"'

Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Report of Facility Changes, Tests and Exg,eriments

Reference:

Report of Facility Changes, Tests and Experiments, dated May 5,1995 In accordance with 10 CFR 50.59, a supplement to the Annual Report of Facility Changes, Tests, and Experiments for the Beaver Valley Power Station, Unit No. 2, is attached. This report provides brief descriptions of facility and procedure changes and a summary of safety evaluations for several temporary modifications which were not included in the May 5,1995 report. Because these changes were temporary and did not result in FSAR revisions, these items were omitted from the original report.

Each change was evaluated to determine (1) if the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the Updated Final Safety Analysis Report may be increased, or (2) if a possibility for an accident or malfunction of a different type than any evaluated previously in the Updated Final Safety Analysis Report may be created, or (3) if the margin of safety as defined in the basis for any technical specification is reduced. In each case, it was determined that the change did not constitute an unreviewed safety question as defined in 10 CFR 50.59.

If you have any questions regarding this report, please contact Roy drosi, Manager, Nuclear Safety, at (412) 393-5210.

Sincerely,

  • /S George S. Thomas Attachment c: Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager I

9512180190 951211 ,

PDR ADOCK 05000412 8 R PDR