ML20095E918
Jump to navigation
Jump to search
| ML20095E918 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 07/31/1995 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20095E906 | List: |
| References | |
| NUDOCS 9512180207 | |
| Download: ML20095E918 (1) | |
Text
.
t..
e t
OPERATING DATA REPORT l
0 REVISION 1
" '"'J ost !;'",,5 OPERATING STATUS COMPLETED Bf R.A. Willises TELEPHONE 704-332-5346
- 1. Utit hase: McGuire 1
- 2. Reporting Period:.Tuly 1, 1995-July 31, 1995
- 3. Licensed Thersal Pcwer (Mt):
3411
- 4. Naseplate Rating (Bross M e):
13055 Notes eNaseplate Rating 5.' Design Electrical Rating (Net MWe):
!!B0 (Bross Me) calculated as.
- 6. Marisus Dependable Capacity (Stoss MWel:
!!71 1450.000 MVA
.90 power-
- 7. Marisus Dependable Capacity (Net MWe):
!!29 factor per Page 111,-
- 6. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NUREB-0020.
Report. Elve Reasons:
i
- 9. Power Leve) To Which Restricted, if Any (Net Mels
- 10. Reason For Restrictions, If anyt j
l This Month Yr.-to-Date Cusulative 1
- 11. Hours in Reporting Feriod 744.0 5087.0
!!9783.0
$12.NusbarOfHoursReactorWasCritical 641.1 4900.2 85259.5
)
13.' Reactor Reserve Shutdown Hours
--0--
--0--
--0-- '
- 14. Hours Senerater On-Line 635.7 4885.3 B4398.0
- 15. Unit Resene Shutdenn Hcurs -
--0--
--0--
' 16. Gross Thersal Energy Benerated (MWH) 2124395_
16544195 264366621
- 17. Gross Electrical Energy Eenerated ( M H) 705407 5664416 90816139 i
- 18. Net Electrical Energy Benerated ( MH) 673909 5445331 86752699
- 19. 1l nit Service Factor B5.5 96.0 70.5 j
- 20. Unit Availability Factor 85.5 96.0 70.5
)
- 21. Unit Capacity Factor (Using MDC Net) 80.2 94.8 63.1
]
- 22. Unit Capacity Factor (Using DER Net) 76.8 90.7 61.4 E3. Unit Forced Outage Rate 14.6 4.0 13.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i Refueline - December 08. 1995 - 43 days
- 25. If Shut Down At End Of R;p::. Period. Estiaated Date of Startup
- 26. Ur.its in Test Status Grier ti Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATIDN 9512190207 951212 PDR ADOCK 05000369 R
-