ML20095E918

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for McGuire Nuclear Station, Unit 1
ML20095E918
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/31/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20095E906 List:
References
NUDOCS 9512180207
Download: ML20095E918 (1)


Text

.

t..

e t

OPERATING DATA REPORT l

0 REVISION 1

" '"'J ost !;'",,5 OPERATING STATUS COMPLETED Bf R.A. Willises TELEPHONE 704-332-5346

1. Utit hase: McGuire 1
2. Reporting Period:.Tuly 1, 1995-July 31, 1995
3. Licensed Thersal Pcwer (Mt):

3411

4. Naseplate Rating (Bross M e):

13055 Notes eNaseplate Rating 5.' Design Electrical Rating (Net MWe):

!!B0 (Bross Me) calculated as.

6. Marisus Dependable Capacity (Stoss MWel:

!!71 1450.000 MVA

.90 power-

7. Marisus Dependable Capacity (Net MWe):

!!29 factor per Page 111,-

6. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NUREB-0020.

Report. Elve Reasons:

i

9. Power Leve) To Which Restricted, if Any (Net Mels
10. Reason For Restrictions, If anyt j

l This Month Yr.-to-Date Cusulative 1

11. Hours in Reporting Feriod 744.0 5087.0

!!9783.0

$12.NusbarOfHoursReactorWasCritical 641.1 4900.2 85259.5

)

13.' Reactor Reserve Shutdown Hours

--0--

--0--

--0-- '

14. Hours Senerater On-Line 635.7 4885.3 B4398.0
15. Unit Resene Shutdenn Hcurs -

--0--

--0--

' 16. Gross Thersal Energy Benerated (MWH) 2124395_

16544195 264366621

17. Gross Electrical Energy Eenerated ( M H) 705407 5664416 90816139 i
18. Net Electrical Energy Benerated ( MH) 673909 5445331 86752699
19. 1l nit Service Factor B5.5 96.0 70.5 j
20. Unit Availability Factor 85.5 96.0 70.5

)

21. Unit Capacity Factor (Using MDC Net) 80.2 94.8 63.1

]

22. Unit Capacity Factor (Using DER Net) 76.8 90.7 61.4 E3. Unit Forced Outage Rate 14.6 4.0 13.9
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i Refueline - December 08. 1995 - 43 days

25. If Shut Down At End Of R;p::. Period. Estiaated Date of Startup
26. Ur.its in Test Status Grier ti Consercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATIDN 9512190207 951212 PDR ADOCK 05000369 R

PDR

-