ML20095E826
| ML20095E826 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/08/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9512180166 | |
| Download: ML20095E826 (1) | |
Text
- - ~. ~. _ _ ~..
~.. -
Et:tlin supp:rt D3pertmtnt 4
A 4
Y PECO ENERGY e
'" 'av c -a "x Nuclear Group Headquarters 965 Chesterbrook Boulevard
{
Wayne. PA 19087-5691 December 8,1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 i
NPF-85 U. S. Nuclear Pegulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Units 1 and 2 Technical Specifications Change Requests implementation Dates f
Gentlemen.
l t
The purpose of this letter is to notify the NRC of implementation dates associated with recently issued Technical Specifications Change Requests (TSCRs) for Limerick Generating Station.
TSCR #
BRIEF DESCRIPTION IMPLEMENTATION DATE 94-48-0 Eliminate Active Safety Function of Eight Drywell November 17,1995 Chilled Water System Valves 95-02-0 Change HPCI System Response Time to 160 November 3,1995 f
seconds l
If you have any questions, please do not hesitate to contact us.
Very truly yours, A6L)V 0.
.f -
G. A. P unger, Jr.,
Director - Licensing cc:
T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident inspector, LGS R. R. Janati, PA Bureau of Radiological Protection i
180059 i
~
I 9512180166 951208 PDR ADOCK 05000352 1 D R._
- PDR,
..