Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN068406, Monthly Operating Rept for May 1984 + (ML20092M725)
- ML20092M730 + (ML20092M730)
- ML20092M733 + (ML20092M733)
- ML20092M736 + (ML20092M736)
- ML20092M744 + (ML20092M744)
- ML20092M747 + (ML20092M747)
- ULNRC-03270, Submits Westinghouse Alloy 600 Re Steam Generator Mechanical Plugs.Util Currently Plans to Replace or Repair Plugs During Refuel 8 or Refuel 9 + (ML20092M749)
- BSEP-84-1482, Special Rept 2-SR-84-8:on 840519,fire Barrier Limiting Condition for Operation Issued to Permit Removal of Fire Barrier Located at Seal SW-3-022.Specified Time Frame Exceeded.Fire Watches Established Until Work Completed + (ML20092M750)
- ML20092M752 + (ML20092M752)
- ML20092M757 + (ML20092M757)
- ML20092M764 + (ML20092M764)
- ML20092M767 + (ML20092M767)
- ML20092M768 + (ML20092M768)
- ML20092M769 + (ML20092M769)
- ML20092M781 + (ML20092M781)
- ML20092M785 + (ML20092M785)
- ML20092M787 + (ML20092M787)
- ML20092M799 + (ML20092M799)
- ML20092M801 + (ML20092M801)
- ML20092M802 + (ML20092M802)
- 05000220/LER-1981-055-03, /03L-0:on 810605,visual Insp of Doors & Access Openings for Adequacy of Sealing Documented,But No Record Made of Test Using DOP & Freon.Caused by Vagueness in Procedure NI-RTP-38.Procedure Revised + (ML20092M812)
- 05000483/LER-1992-003, :on 920123,during Startup,Closure of Feedwater Bypass Control Valves to Control SG Level Led to Turbine Trip.Caused by Attempt to Maintain Reactor/Turbine Power at Low Loads.Ts 3.2.2 to Be Revised + (ML20092M815)
- ML20092M817 + (ML20092M817)
- DCL-20-021, Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant + (ML20092M819)
- ML20092M821 + (ML20092M821)
- ML20092M824 + (ML20092M824)
- ML20092M830 + (ML20092M830)
- GO2-95-194, Forwards Response to NRC Re Violations Noted in Insp Repts 50-397/95-07 & 50-397/95-13.Corrective Actions: on-coming Operator Questioned CRS & Obtained Permission to Close Valve + (ML20092M834)
- ML20092M836 + (ML20092M836)
- ML20092M845 + (ML20092M845)
- ML20092M854 + (ML20092M854)
- BECO-92-016, Submits Report of Insurance to Cover Property Damage to Pilgrim Nuclear Power Station Per 10CFR50.54(w) + (ML20092M858)
- ML20092M867 + (ML20092M867)
- AECM-84-0316, Special Rept 84-025/0:on 840509,smoke Detector N534C Alarmed & Would Not Reset.Caused by Accumulation of Dust Particles on Ionization Detector.Detector Replaced & Functional Check Performed.Zone Reset + (ML20092M878)
- ML20092M880 + (ML20092M880)
- ML20092M887 + (ML20092M887)
- ML20092M892 + (ML20092M892)
- ML20092M894 + (ML20092M894)
- ML20092M896 + (ML20092M896)
- LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02 + (ML20092M898)
- ML20092M904 + (ML20092M904)
- ML20092M906 + (ML20092M906)
- 05000397/LER-1984-054, :on 840529,turbine Governor & Intercept Valves Tripped Closed.Caused by Incorrect Overspeed Protection Control Test Techniques.Procedure Deviation Issued to Secure Testing Function + (ML20092M907)
- ML20092M908 + (ML20092M908)
- ML20092M912 + (ML20092M912)
- ML20092M927 + (ML20092M927)
- ML20092M930 + (ML20092M930)
- ML20092M936 + (ML20092M936)
- BSEP-84-1535, Special Rept:On 840521,diesel Driven Fire Pump Rendered Inoperable Due to Decrease in Diesel Closed Cooling Water Expansion Tank Level.Caused by Leaking Tubes in HX Tube Bundle.Hx Tube Bundle Replaced + (ML20092M941)
- ML20092M943 + (ML20092M943)
- ML20092M947 + (ML20092M947)