y OPERATING DATA REPORT i
DOCKET NO. 50-364 DATE June 6, 1984 COMPLETED BY W.G.Hairston,III
{
TELEPHONE (200 R99-5156 OPERATING STATUS l
- 1. ' Unit Name: Joseph M. Farley - Unit 2 Notes
- 1) Cumulative dsta since L 2.- Reporting Period:
May. - 19 84 -
"3 Licensed Thermal Power (MWt):.2652 7-30-81, date of 860
~
< 4.' Nameplace Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 829 16.- Maximum ' Dependable Capacity (Gross MWe):
852.5
,7. Maximum Depend 2ble Capacity (Net MWe):
809.1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons-N/A l
V-
. 9. Power Level To Which Restricted. If Any (Net MWe):
N/A-
- 10. Reasons For Restrictions.lf Any:
N/A
. This Month
' Yr.-to-Date
" Cur'nulative i
- 11. Hours In Reporting Period 74 4 3,647 24,888
.12. Number Of Hours Reactor Was Critical 744. 0 3,600.0 22,142.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line.
744.0 3,551.7 21,850.5 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 O.0
- 16. Gross Thermal Energy Generated (MWH) 1,950,480 9,249,066 54.586,910 t
- 17. Gross Electrical Energy Generated (MWH) 628.538 3.012.880 17.999.756
- 18. ' Net Electrical Energy Generated (MWH) 598,816 2,867,560 17,067,586 r
- 19. Unit Service Factor-100.0 97.4 87.8
- 20. Unit Availability Factor.
100.0 97.4 87.8
- 21. Unit Capacity Factor (Using MDC Net) 99.5 97.2 84.8
- 22. Unit Capacity Factor (Using DER Net) 97.1
') 4. 8 82.7 23.. Unit Forced Outage Rate 0.0 2.6 4.9
- 24. Shutdowns Scheduled O$er Next 6 Months (Type. Date.and Duration of Eachi:
N/A 25.. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test StatuitPrior to Commercial Operation)
Forecast Achieved INITI\\L CRITICALITY 5-6-81 5-S-81 INITIAL ELECTRICITY 5-24-81 5-25-81 COMMERCIAL OPERATION 8-1-81 7-30-81 I
B407020'418 B40531 PDR ADOCK 05000364 R
PDR to m )
~
~..
DOCVlTNO.
50-364
_.a.-
^
"./.
UNIT -
DAR June 6, 1984 COMPLETED BY W.G. Hairs ton, III TELEPHONE (205)899-5156 t
.\\l0NTl!
May, 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (5tWe-Net)
(alwe-Net) 815 1,
17 821
-; 2 814 13 991
.3:
80 8 g9 gi7
'4 812 20 815 y
813 gg 7gg 6
806 22 a
714 7
808 23 -
R01 g-811-24 791 9
823 25-806
~
10 825 26 Rn6 825
- gg 27 806
[2 819 23 807 13 815 29 812 813 14 30 752 818 li.
Is33-734
'16 823 ELSTRUCT!ONS On this form:: tist the sve.-age daily unit power levelin MWe Net for esch d:y in the reporting munih. Compute o i the neare:r whole rne;: wait.
(997)
e--
A
. UNIT SIIU1 DOWNS AND FOWER REDUCTIONS :
DOCK ET NO. 50-364 ~
9'
. UNIT NAM E J.M. Farlev '-Uni t. 2 :
DATE June 6. 1984 REPORT MONTil May, :1984 '
COMPLETED alY L U C liat rsenn III.
TEl.EPilONE ~ Dns) Roo-si s6 "L
.E E
}
5' Licensee Eg ft Cause & Cmrective No.
Date g
5g 2ye Event g?
g3.
Action to
'H f5 E
U di =
- Report
- o vi U u
Prevent Recurrence o
2
~
6 There Were No Unit Shut-owns Or Signi fican t - 'ower Reductior s In T ie Month O ' May.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee C Refueling 3 Automatic Scram.
Event Repost (1.ER) File INtillEG-D Ilegulatory Restriction 4 Other (Explain) 0161)
E-Operator Training A license Examination F-Ad niinist rasive 5
3 G Opciational Eiror (Explain)
Eshibis 1 Same Somce 19/77) ll Olhes (Explain) p-,
--w+e w
e.-at-
P D
[
- Malling Address L
Alf tnma Power Company 600 North 18th Street Post Office Box 2641 Tetephone 205 783-6090 R. P. Mcdonald Senior Vice President-Nuclear Generation Flintridge Building AlabamaPower lre scultwn eect c s ask"'
June 8, 1984 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.