ML20092M817

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Revised EPIP Listing,Epips Index,Rev 21 to EPIP-04 & Rev 16 to EPIP-11.W/951003 Release Memo
ML20092M817
Person / Time
Site: Palo Verde  
Issue date: 09/13/1995
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092M822 List:
References
NUDOCS 9510040103
Download: ML20092M817 (2)


Text

_ _ -

3{

o

. = '

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION 10 CFR 50, Appendix E.V P O. BOX 52034

  • PHOENIX. ARIZONA 65072 f"l34 102-03470-AKK/RLV September 13,1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Emergency Plan implementing Procedures Update in accordance with 10 CFR 50, Appendix E.V, enclosed please find copies of revised PVNGS Emergency Plan Implementing Procedures (EPIPs). The procedures included with this transmittal are indicated on the enclosed list. Included for your information is a complete listing of the PVNGS EPIPs (Procedures index).

The enclosed EPIPs contain information considered private or proprietary (including names and internal telephone numbers). In accordance with Generic Letter No. 81-27, the specific information has been bracketed on the EPIPs. Arizona Public Service Company (APS) requests that this information be considered confidential and withheld from public disclosure pursuant to 10 CFR 2.790(a) and 10 CFR 9.17(a).

By copy of thir, letter, APS is forwarding two copies of the enclosure to the NRC Region IV Office.

Copies of the revised EPIPs are provided to the NRC Resident inspectors' Office as an update to the assignerJ controlled procedures.

if you have any questions, please contact Scott A. Bauer at (602) 393-5978.

Sinc rely, h

Angela K. Krainik, Department Leader Nuclear Regulatory Affairs AKK/RLV/rv Enclosure 3 gg(.g cc:

E. F. Bates (w/ Enclosure 2 copies)

L. J. Callan (w/o Enclosure)

K. E. Johnston (w/o Enclosure)

A 'g\\

K. E. Perkins (w/n Fnclosure) 9510040103 950913 PDR ADOCK 0500 8

{)<10 M 4

em naoog UNITE') STATES y

j NUCLEAR RE!!ULATORY COMMISSION WASHINGTON D.C. - annt

\\*****/

October 3, 1995

' Docket No. 50-528/529/530 MEMORANDUM TO:

Chief Information d Re rds Management Br n f FROM:

.C rlto

ammerer, irector Div slon of Freedom of Information and Publications Services, ADM

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN j

DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may-now be made publicly available.

Attachment:

Emergency Plan-j-

4 a

~

lc v

4

_)