Forwards Rev 5 to Updated FSAR for Vogtle Electric Generating Plant.Rev 5 Reflects Removal of Figures That Are Reproductions of Controlled Engineering Drawings
ML20092M757
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/29/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092M758 List:
References
LCV-0657-C, LCV-657-C, NUDOCS 9510040024
Download: ML20092M757 (2)


Text

,,-

Georga P *e? CornpaW O

40 inve ness Cemer Parkway Post Omco Bor 1295 4

B.rm ngham Nanama 35201 l

Tele: pone 205 877 7122 o

A

~

Georgia Power c.x.uccoy Vce Presdcrt Nuclea' September 29,1995 LCV-0657-C O

Docket Nos. 50-424 50-425 O

u. S. Nuciear Resuiaterx Cemmissien ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT UPDATED FINAL SAFETY ANALYSIS REPORT In accordance with the 10 CFR 50.4 (b) and 50.71 (c) Georgia Power Company (GPC) hereby submits one signed original and ten copies ofRevision 5 to the Vogtle Electric F

Generating Plan Updated Final Safety Analysis Report (UFSAR). This submittal is

\\

provided on a replacement page basis and is accompanied by an effective page list that identifies the current pages of the UFSAR. This Revision 5 reflects changes through l

March 31,1995.

l Revision 5 reflects the removal offigures that are reproductions of controlled engineering drawings. The UFSAR text now refers to these controlled drawings by their plant identification numbers in lieu of the figura numbers that previously appeared in the text. In accordance with 10 CFR 50.59, a safety evaluation was prepared which determined that no unreviewed safety question exists regarding this change to the UFSAR.

p The controlled drawings reflected in figures that were previously included in a UFSAR d

have quickly become outdated, in some instancc: prior to submittal to the NRC. This occurs because 10 CFR 50.71(c) allows the revision to reflect plant changes up to a l

maximum of 6 months prior to the date of submittal. Also, considering 18-month UFSAR l

revision schedule, the figures in the UFSAR may be as much as 24 months out of date.

Incorporating the controlled drawings by reference encourages the document user to O

estai the cerre 1 era-i 8 revisien. The ievei of detati centai ed in the ursa is net reduced since the same information continues to be included by reference.

\\A oscanf T

'b l

gA*188EeZi83l)f l

K.

,L-

l

- a6 O

U. S. Nuclear Regulatory Commission Page 2

- O Mr. C. x. McCex states that he is vice,resiaent ef oeerS a Pewer Comganz and is i

authorized to execute this oath on behalf of Georgia Power Company and that, to the best of his knowledge and belief, the information contained in the enclosed UFSAR Revision 5 l

accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to O

Co--issie re<= ire-e t.

i GEORGIA POWER COMPANY By:

k C. K. McCoy Sworn to and subscribed before me this day of

.1995.

'/

O W, 7 6 61 p G Notary Public YCCE.&ifim' i

CKM/JLL 1

Enclosure:

Updated FSAR, Revision 5

O l

xc: Geornia Power Comnany Mr. J. B. Beasley, Jr.

i Mr. M. Sheibani i

NORMS

.O U. S. Nuclamr Ramdatory Cr.nmission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle