Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092H521 + (ML20092H521)
- ML20092H523 + (ML20092H523)
- ML20092H525 + (ML20092H525)
- ML20092H531 + (ML20092H531)
- ML20092H534 + (ML20092H534)
- ML20092H540 + (ML20092H540)
- ML20092H543 + (ML20092H543)
- ML20092H544 + (ML20092H544)
- ML20092H546 + (ML20092H546)
- ML20092H549 + (ML20092H549)
- ML20092H551 + (ML20092H551)
- ML20092H554 + (ML20092H554)
- ML20092H559 + (ML20092H559)
- ML20092H566 + (ML20092H566)
- ML20092H571 + (ML20092H571)
- 05000413/LER-1992-002, :on 920116,discovered That Breaker Train B Sys Controls Had Not Been Opened During Preceding Maint Activities,Per Tech Spec 3.0.3.Caused by Inappropriate Actions.Enhancements Made to Red Tag Program + (ML20092H574)
- 05000414/LER-1992-002-01, :on 920115,unexpected ESF Actuation Occurred. Cause Unknown.Recorder Installed to Capture Event Should It Recur While in Steam Pressure Mode + (ML20092H593)
- ML20092H594 + (ML20092H594)
- ML20092H600 + (ML20092H600)
- ML20092H607 + (ML20092H607)
- ML20092H608 + (ML20092H608)
- ML20092H611 + (ML20092H611)
- ML20092H614 + (ML20092H614)
- ML20092H618 + (ML20092H618)
- ML20092H620 + (ML20092H620)
- ML20092H622 + (ML20092H622)
- ML20092H625 + (ML20092H625)
- BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests + (ML20092H626)
- 05000317/LER-1995-004-01, :on 950816,inoperable Fire Barrier Penetration Seal Was Discovered.Caused by Inadequate Engineering Oversight & Less than Adequate Surveillance Procedure.Sealed Penetration Seal + (ML20092H627)
- ML20092H628 + (ML20092H628)
- ML20092H632 + (ML20092H632)
- HL-5023, Forwards Ei Hatch Nuclear Plant IST Program, for Third Interval + (ML20092H639)
- ML20092H640 + (ML20092H640)
- ML20092H646 + (ML20092H646)
- ML20092H647 + (ML20092H647)
- ML20092H657 + (ML20092H657)
- ML20092H662 + (ML20092H662)
- ML20092H664 + (ML20092H664)
- ML20092H669 + (ML20092H669)
- ML20092H677 + (ML20092H677)
- ML20092H678 + (ML20092H678)
- ML20092H681 + (ML20092H681)
- ML20092H684 + (ML20092H684)
- ML20092H688 + (ML20092H688)
- ML20092H691 + (ML20092H691)
- ML20092H692 + (ML20092H692)
- ML20092H706 + (ML20092H706)
- ML20092H719 + (ML20092H719)
- ML20092H721 + (ML20092H721)
- BECO-84-088, Application for Amend to License DPR-35,consisting of Proposed Change 84-04,revising Tech Specs to Require Two Licensed Senior Reactor Operators When Plant Operating & Addressing NRC Change Request + (ML20092H729)
- ML20092H730 + (ML20092H730)