Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091M346 + (ML20091M346)
- ML20091M348 + (ML20091M348)
- AECM-84-0293, Special Rept 84-023/0:on 840505,Div 1 Diesel Generator Failed During Start Attempt for Monthly Functional Surveillance.Cause Unknown.Monthly Surveillance Revised to Include Monitor Solenoid Start Signal Instrumentation + (ML20091M349)
- ML20091M350 + (ML20091M350)
- ML20091M354 + (ML20091M354)
- RBG-17949, Interim Deficiency Rept DR-189 Re Insulated Lugs in Control Room.Next Rept Will Be Provided by 840824 + (ML20091M355)
- 05000301/LER-1991-001-02, :on 910929,main Steam Isolation Valve Failed to Close.Caused by Degradation of Valve Operators.Investigation Was Performed to Assess MSIV Performance & Perceptions of Valve Performance + (ML20091M356)
- 05000361/LER-1984-028, :on 840505,waste Gas Sampling Sys Pressure Control Valve 2/3PCV0582 Failed Open,Resulting in Flow Through Sample Pump Discharge Relief Valve 2/3PSV0580 Into Waste Gas Discharge Header.Valve Replaced + (ML20091M359)
- ML20091M360 + (ML20091M360)
- RBG-17-948, Interim Deficiency Rept DR-192 Re Duct Pieces Fabricated by Mccroskey Sheet Metal.Next Rept Expected by 840822 + (ML20091M362)
- ML20091M363 + (ML20091M363)
- RBG-17948, Interim Deficiency Rept DR-157 Re ASME Stock Fittings.Next Rept Will Be Provided by 840829 + (ML20091M367)
- ML20091M369 + (ML20091M369)
- 05000353/LER-1991-029-01, On 911223,reactor Containment & Isolation Control Sys Activated.Caused by Failure of PCRVICS Fuse B21 H-F15A.All Sys Responded as Designed.Fuse Replaced & All Isolations Reset + (ML20091M370)
- ML20091M373 + (ML20091M373)
- ML20091M374 + (ML20091M374)
- ML20091M375 + (ML20091M375)
- RBG-17946, Interim Deficiency Rept DR-146 Re multi-pole Circuit Breakers Mfg by I-T-E Electrical Products,Siemens-Allis,Inc & Supplied by Gould,Inc.Next Rept Will Be Provided by 840829 + (ML20091M376)
- ML20091M377 + (ML20091M377)
- ML20091M380 + (ML20091M380)
- ML20091M382 + (ML20091M382)
- ML20091M383 + (ML20091M383)
- ML20091M385 + (ML20091M385)
- ML20091M387 + (ML20091M387)
- 05000275/LER-1984-014, :on 840506,while in Mode 2,spurious Reactor Protection Sys Signal Resulted in Reactor Trip.Caused by Faulty Temp Modifier in Protection Set II Control Cabinet. Component Replaced + (ML20091M388)
- ML20091M390 + (ML20091M390)
- AECM-84-0302, Informs That GE Overview Review of Tech Specs Complete.Ge Provided Enhancements &/Or Improvements in Wording. Successful Completion of Review Provides Addl Assurance That Tech Specs Complete & Adequate + (ML20091M392)
- ML20091M395 + (ML20091M395)
- ML20091M399 + (ML20091M399)
- ML20091M401 + (ML20091M401)
- ML20091M404 + (ML20091M404)
- ST-HL-AE-3985, Special Rept:On 911224,control Valve Failed Open Causing Reduction of Reactor Coolant Sys Pressure.Cause Can Not Be Determined.Verified No Loose Connections,High Resistant Contacts or Voltage Fluctuations Present + (ML20091M407)
- ML20091M412 + (ML20091M412)
- 3F0484-03, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/84-05.Corrective Actions Withheld (Ref 10CFR73.21 & 10CFR2.790(d)) + (ML20091M421)
- 3F0184-13, Confirms That Forwarding Security Event Rept Re Incident Involving Threat Made by Terminated Contract Worker Was Never Received + (ML20091M422)
- ML20091M424 + (ML20091M424)
- ML20091M431 + (ML20091M431)
- ML20091M433 + (ML20091M433)
- AECM-84-0296, Special Rept 84-012/1:on 840201,147 Doors in Auxiliary & Control Bldgs Not in Compliance W/Original Spec Requirements.Design Change 84/4502 Issued to Rework Doors. Updated Rept Expected by 841010 + (ML20091M434)
- ML20091M435 + (ML20091M435)
- ML20091M441 + (ML20091M441)
- 05000324/LER-1982-088-03, Suppression Pool Suction Supply Valve 2-E11-F004B Stem Spun Beyond Full Open Valve Position.Caused by IGSCC Due to Improper Heat Treating.New Valve Stem Installed + (ML20091M447)
- ML20091M448 + (ML20091M448)
- ML20091M449 + (ML20091M449)
- TXX-4199, Forwards Description & Summary Evaluation of Deferred Preoperational Thermal Expansion Testing,Per 840514 Commitment.Concurrence Requested to Defer Test Until After Fuel Load + (ML20091M450)
- LD-84-208, Responds to NRC Re Deviations Noted in IE Insp Rept 50-528/83-41.Corrective Actions:Replacement of Existing Sample Probe by multi-point Sample Probe & Relocation of Probe Planned + (ML20091M452)
- CP-202000230, Submittal of Property Damage Insurance Coverage + (ML20091M456)
- ML20091M460 + (ML20091M460)
- ML20091M461 + (ML20091M461)
- 05000445/LER-1991-032, :on 911206,incomplete Calibr of Four Channels & Nonconserative Indication of Reactor Power Noted.Caused by Error in Wording of Work Order Instructions.Steps Have Been Revised in Surveillance Database + (ML20091M473)
- ML20091M475 + (ML20091M475)