Interim Deficiency Rept,Item 171 Re Location of Rebar in Masonry Block Walls Not Specified by Design Requirements. Initially Reported on 840427.Item Not Reportable Per 10CFR50.55(e)
ML20091M475
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/23/1984
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
171, MQAH-84-226, NUDOCS 8406110313
Download: ML20091M475 (1)


Text

o-r,..

CP&L pQ *.

arolina Power & Light Comp ny

& h P. O. Box.165, New Hill, North Carolina 27562 May 23, 1984 1

FILE: SH N-2/18 MQAH 84-226 Item 171 Mr. James P..O'Reilly

' United States Nuclear Regulatory Commission Region 11 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 MISLOCATED REBAR IN MASONRY BLOCK WALLS

Dear Mr. O'Reilly:

This is to confirm the May-23, 1984 telephone conversation between Mr.-K. V. Hate' (CP&L) and Mr. A. Hardin (NRC).

Mr. Hardin was informed that the April 27, 1984 potentially reportable item, pertaining to the location of the rebar in the block walls not being as specified by the design requirements, has_been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e).

Thank you for your consideration in this matter.

NJC/mt Yours very truly, cc:

Mr. R. C..DeYoung Mr. G. Maxwell i-f Mr. R. L. Prevatte.

N.

Chiangi - Manager Quality A.

2rance/ Quality Control Harris Plant

.8406110313 840523

- PDR ADOCK C5000400 S

pg e

p-P 1