Interim Deficiency Rept DER 84-25 Re Containment Supply Registers Not Cycling.Initially Reported on 840501.Bechtel Studying Problem to Determine Reportability & Justification. Next Rept Expected by 840817
ML20091M412
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29611-TDS, DER-84-25, NUDOCS 8406110287
Download: ML20091M412 (3)


Text

.

4 4-O ll <' fly,}

q Arizona Public Service Company,,,,

,i 0

,,I Po Dox 2W4

  • PHotNix, Anl/ONA 6'436

-s6 p i; > -

May 29,1984 ANPP-29611-TDS/TRB U. S. Nuclear Regulatory Commission Region V' Creekside Oaks Office Park 1450 Maria Lane - Suite 210

' Walnut Cres.k, CA 94596-5368 Attention: Mr. T. W. Bishop,-Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 84-25 A 50.55(e) Potentially Reportable Deficiency Relating to Containment Supply Registers Would Not Cycle File 84-019-026; D.4.33.2 Reference!' Telephone Conversation between P. Narbut and T. Bradish on May 1, 1984

Dear Sir:

The NRC was notified of a potentially. reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report -is attached.

It is now expected that this information will be

~

finalized by Auguet 17, 1984, at which time a complete report will be submitted.

Very truly yours, YCW nh E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/IRBtru Attachsent

^

cc: See Page IVo--

l l5 y

4

F

. Mr. T. W. Bishop.

DER 84 Page Two ec: -

Richard DeYoung, Director Office of Inspection and Enforcement' U. S. Nuclear Regulatory Commission

. Washington, D. C. 20555 T. G. Woods, Jr.

lD. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers

' B. S. Kaplan L. A.-Souza D. E. Fowler J. Vorees

~ J. R. Bynum J. M. Allen P. P. Klute

- A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L..E.' Vorderbrueggen G. A. Fiorelli S. R. Frost J..Self D. Canady Records Center-Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 TITE 4

'y

.y t

j

INTERIM REPORT - DER 84-25 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2, & 3 I. Potential Problem During receiving inspection, Containment Supply Registers would not cycle. The tension wire (music wire) that is used for blade adjustments have become brittle and break off.

The same type supply registers have been installed into Units 1, 2 and 3.

It has been identified that similar problems were observed in the installed units.

In the event of a shutdown, no air would be able to travel through those devices if the wire was broken.

II. Approach To and Status of Proposed Resolution Bechtel engineering is currently studying this problem to determine reportability and technical justification for corrective action.