CP-202000230, Submittal of Property Damage Insurance Coverage
| ML20091M456 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/31/2020 |
| From: | Hicks J Luminant, TXU Energy, Vistra Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CP-202000230, TXX-20023 | |
| Download: ML20091M456 (3) | |
Text
6555 SIERRA DRIVE IRVING, TEXAS 75039 o214-812-4600 VISTRAENERGY.COM Jack C. Hicks Manager, Regulatory Affairs Luminant P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 o 254.897.6625 CP-202000230 TXX-20023 U. S. Nuclear Regulatory Commission Ref 10 CFR 50.54(w)
ATTN: Document Control Desk Washington, DC 20555-0001 3/31/2020
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 PROPERTY DAMAGE INSURANCE
Dear Sir or Madam:
Pursuant to 10 CFR 50.54(w)(3), Vistra Operations Company LLC (Vistra OpCo), hereby submits the attached summary report of the level and source of on-site property damage insurance coverage for Comanche Peak as of April 1, 2020. The level of coverage maintained is in excess of the $1.06 billion as required by 10CFR50.54(w).
TXX-20023 Page 2 of 2 This communication contains no new commitments regarding CPNPP Units 1 and 2.
Should you have any questions, please contact Carl B. Corbin at {254) 897-0121.
Sincerely, JackC~
Copy (email)-
Scott A. Morris (scott.morris@nrc.gov), Region IV Dennis Galvin (dennis.galvin@nrc.gov), NRR Attachment John Ellegood (john.ellegood@nrc.gov) Senior Resident Inspector, Comanche Peak Neil Day (neil.day@nrc.gov) Resident Inspector, Comanche Peak
Attachment to TXX-20023 Page 1 of 1 Comanche Peak Power Company LLC Comanche Peak Nuclear Power Plant Nuclear Property Insurance Coverage As of April 1, 2020 Property - All Risk (Operating Facility)
Policy No.
Insuring Company Amount of Insurance Expires P20-115 Nuclear Electric Insurance Limited.
$ 1,500,000,000 April 1, 2021 X20-115 Nuclear Electric Insurance Limited.
$ 750,000,000 April 1, 2021 Total
$ 2,250,000,000