Calling Addriss A11bima Power Company
- 600 North 18th Street Post Office Box 2641 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President-
""',i'a'e a*u7i"S "
AlabamaPower
"*"~ ~
June 1, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:
Attached for your infonnation is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated April 26,1984.
The format of-the attachment is tabulated chronologically by
- Alabama Power Company's requested NRC approval date. Alabama Power Company is ready to discuss a modification of this licensing status which would address all licensing issues.
If you have any questions, please advise.
Yours truly, Y
R. P. Mcdonald RPM /CJS:1sh-D16
- Attachment cc:.Mr. L. B. Long Mr. J. P. O'Reilly Mr. E.-A. Reeves Mr. W. H. Bradford.
8406110304 840601' PDR ADOCK 05000348 P
- ~ -
,s
ATTACHMENT PAGE 1 STATUS OF LICENS!hG ITEMS TIQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE i
REMARKS 01-06-84 COMPLETE 10-25-82 1.-
Emergency Preparedness Program Audit Once Per 12 Months,-FNP-1 and 2 2.
Administrative 04-06-83 01-09-84 COMPLETE Change to
. Footnote to T.S. Table 3.3-3, FHP-1 and 2 12-10-82 01-10-84
-3.
Administrative COMPLETE
-Change to T.S.
Table 3.7-4a, FNP-2
'4.
Change for 10-08-82 01-27-84 COMPLETE Turbine Valve Testing, FNP-1 arid 2 5.
Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FNP-1 and 2
- 6. ' Administrative 05-27-84 02-29-84 COMPLETE Change to Table 5.7-4a, FNP-1 7.-
10CFR50.49-02-22-84 04-16-84 COMPLETE Environmental Qualification -
Schedule Extension Subnittal,
FNP-1 12-30-82 07-01-83 8a. River Water 49374 OVERDUE ~
06-20-83 05-18-84 49375 FROM MRC
- System 03-02-84 Del etion, - FNP-l' and 2 (T.S.
03-27-84' 3 4.7.5 and 3 4.7.6) l
ATTACIMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SU8MITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 8b. Diesel 08-03-82 07-01-83 49374 OVERDUE Generator 12-30-82 10-01-83 49375 FROM NRC Overload Test, 06-03-83 05-18-84 FNP-1 and 2 01-31-84 (T.S.
03-02-84 4.8.1.1.2.c.5) 03-27-84 54237 OVERDUE 9.
Movable Control 03-04-83 07-15-83 Rod Action 06-03-83 11-01-83 54238 FROM NRC Statement, 07-28-83 05-25-84 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 51629 10.
Safety 05-03-83 11-03-83 Related 06-29-83 05-01-84 51631 Battery 07-29-83 06-01-84
. Surveillance, 08-29-83 07-15-84 FNP-1 and 2 09-23-83 (Revised)
(T. S.3/4. 8. 2. 3, 01-27-84 3/4.8.2.4 and 3/4.8.2.5)
- 11. Charcoal Filter 03-04-83 09-01-84 49953 Surveillance,
.03-01-84 06-22-84 49954 FNP-1 and 2 (T.S. 4.7.7, 4.7.8 and 4.9.14) 11-24-82 09-01-83
.05-17-84 47479 COMPLETE -
12.
License Condition 06-29-83 06-28-84 Amendment 2.C(17) 03-23-84 No. 34 Containment Mini-Purge, FNP-2
( T.S.3.6.1.7 )
12-12-83 07-01-84 54531 13.
Reactor Head
-Vent and Other 54532 0737-Items,.
.G.L. 83-37, FNP-1-and 2
~(Proposed T.S.
- 3/4.4.12 and existing T.S..
s
- Tabl e ~ 3.3-C.
'3.3-11:and
- 3/4.6.4)
.e
ATTACHMENT PAGE 3 STATUS OF LICENSING IlEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 03-02-84 07-08-84 54450
-14.
Meteorological Tower 54451 Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5) 15a. Mechanical 11-24-82 09-01-83 05-17-84 49182 COMPLETE -
Snubber 09-01-84 Amendment Listing, FNP-2 No. 34 (T.S. Table 3.7-4B) 11-24-82 09-01-83 05-17-84 49182 COMPLETE -
15b. Containment Penetration 09-01-84 Amendment Overcurrent No. 34 Protection, FNP-2 (T.S.
Table 3.8-1)
- 16. Generic Letter 02-03-84 09-01-84 54235 83-43, 54236 Reporting Requirements of 10CFR50.72 and
.50.73, FNP and 2 (T.S.
6.9.1.11,12,13)
- 17. Correct Snubber 05-27-83 02-29-84 COMPLETE Listing, FNP-1 (FNP-1)
(FNP-1) and 2 (T.S.
Table 3.7-4) 12-08-83 09-01-84 53402 (FNP-2)
(FNP-2) 03-01-84 09-01-84 18a. Change Monthly 54452 Channel 54453 Calibration of-Excore Neutron Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1)
J.
w
ATTACHMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL.
SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE f
REMARKS 18b. ' Correct 03-01-84 09-01-84 54452 Facili ty 54453 Organization Chart, FNP-1 and 2 (T.S.
Figure 6.2-2) 18c. Correct Valve 03-01-84 09-01-84 54452 Numbers Listed 54453 in T.S., FNP-1 and 2 (T.S.
Table 3.6-1)
- 19. Respirator 01-13-84 02-12-84 53468 Iodine Filter 02-10-84 09-09-84 53469 Exemption 02-13-84 Request, FNP-1 03-05-84
.and 2-05-08-84 20.
Increase Fuel 03-30-84 10-01-84 Enrichment 05-29-84 Design Limit for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.
5.3.1 and 5.6.1.2)
- 21. RCS Pressure 04-10-84 10-06-84 48714 Isolation Valve 48715
. Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)
- 22. Administrative 05-14-84 11-12-84 NEW ITEM Change to j
Reflect Senior Vice President Change, FNP-1 and 2 (T.S.
6.1, S.2, 6.5, 6.6, 6.7 and
-Figure 6.2.1)
1 ATTAC N NT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS
- 23. RWST and 06-01-84 12-01-84 Accumulator IST Justification, FNP-1 and 2 (IST Program)
- 24. RCP Breaker 08-01-84 02-01-85 Position Trip Deletion, FNP-1 and 2 (T.S.
Table 3.3-1)
- 25. Special Test 08-01-84 02-01-85 Exception to Eliminate Excessive ' Flux Mapping During Startup After R.O., FNP-1 and 2 (T.S.
3/4.10.2)
- 26. Waste Gas DELETED BY Recombiner APC0 Analyzer
. Surveill ance, FNP-1 and 2 (T.S. Table 4.3-9)
- 27. Chl orine 08-01-84~
02-01-85 Detection Sy stems,- FNP-1 and 2 (T.S.
3.3.3.6)
- 28. Revised Heatup 04-20-84 03-01-85 and Cooldown (FNP-1)
(FNP-1)
Curves Based on-
- Reactor Vessel 06-18-84 02-10-84 10-85 54234 Material
~(FNP-2)
(FNP-2)
(FNP-2)
Surveillance Program, FNP-1 and-2 (T.S.
3/4.4.10.1)-
c
ATTACHnENT PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SU8MITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 29.: Administrative 07-01-84 To be Change to deter-Correct T.S.
mined Errors (e.g.
Room Air Temperature Requirements, FNP-2 T.S.
Table 3 17-8) and G.L. 84-13 FNP-1 and 2
- 30. Tcchnical 30 days To be Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.
of 3/4.3) generic changes 06-18-82 To be
- 31. Schedular Exenption to 07-27-82 deter-Appendix R 05-15-84 mined Al ternative Shutdown Requirement, FNP-1 and 2 l
4
-,y-