Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1976-048-03, /03L:on 761207,torus Pressure Indication on Recorder PR-16-19-44 Inoperable.Caused by Blown Fuse.Fuse Replaced + (ML20086B922)
- ML20086B932 + (ML20086B932)
- ML20086B935 + (ML20086B935)
- 05000271/LER-1976-047-03, /03L:on 761130,ECCS Valve Switch 1 Did Not Actuate at 300 Psig Tech Spec Limit.Caused by Switch Assembly Roller Dislodged from Actuating Cam.Pressure Reduced to Atmospheric Level + (ML20086B938)
- ML20086B939 + (ML20086B939)
- 05000271/LER-1976-046-01, /01T:on 761129,during Loss of Voltage to Motor Control Ctr 89B,uninterruptible Ac Electric Power Sys Tripped.Exide Power Sys Investigating Cause.Failed Gate Driver Boards Replaced + (ML20086B940)
- ML20086B941 + (ML20086B941)
- 05000271/LER-1976-045-03, /03L:on 761123,after Being Automatically Tripped, Containment Air Sampling Pump Motor Failed to Start.Pump Bypass Valve Opened & Pump Motor Replaced + (ML20086B942)
- 05000271/LER-1976-044-03, /03L:on 761121,during MSIV Partial Closure Testing,Reactor Protection Sys Relay 5A-K3F Deenergized Normally,Then Reset.Caused by Failure of Limit Switch. Return Springs Replaced.Further Action Will Be Taken + (ML20086B945)
- ML20086B946 + (ML20086B946)
- 05000271/LER-1976-043-03, /03L:on 761118,during RHR Valve Testing, Uninterruptible Ac Power Sys 1B Tripped.Caused by Problems W/Voltage Regulation & Sys Logic.Defective Circuit Board Returned to Exide Co for Failure Analysis + (ML20086B948)
- ML20086B949 + (ML20086B949)
- ML20086B951 + (ML20086B951)
- ML20086B952 + (ML20086B952)
- ML20086B953 + (ML20086B953)
- ML20086B968 + (ML20086B968)
- ML20086B977 + (ML20086B977)
- 05000272/LER-1976-010-03, /03L-0:on 760927,both Intermediate Range Nuclear Instrument Channels Rendered Inoperable.Caused by Prior Wetting of Nuclear Detectors within Detector Well.Connectors Cleaned & Reinstalled + (ML20086B982)
- ML20086B983 + (ML20086B983)
- ML20086B989 + (ML20086B989)
- ML20086B992 + (ML20086B992)
- ML20086C000 + (ML20086C000)
- ML20086C003 + (ML20086C003)
- ML20086C004 + (ML20086C004)
- ML20086C007 + (ML20086C007)
- ML20086C014 + (ML20086C014)
- ML20086C015 + (ML20086C015)
- ML20086C019 + (ML20086C019)
- ML20086C020 + (ML20086C020)
- ML20086C021 + (ML20086C021)
- ML20086C022 + (ML20086C022)
- ML20086C024 + (ML20086C024)
- RC-95-0167, Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS + (ML20086C025)
- ML20086C030 + (ML20086C030)
- ML20086C031 + (ML20086C031)
- ML20086C034 + (ML20086C034)
- ML20086C036 + (ML20086C036)
- ML20086C037 + (ML20086C037)
- BECO-LTR-95-068, Repts Changes,Tests & Experiments at Plant for Period of Jan-Dec 1994 + (ML20086C038)
- ML20086C039 + (ML20086C039)
- ML20086C041 + (ML20086C041)
- ML20086C042 + (ML20086C042)
- ML20086C047 + (ML20086C047)
- ML20086C049 + (ML20086C049)
- ML20086C050 + (ML20086C050)
- ML20086C055 + (ML20086C055)
- ML20086C074 + (ML20086C074)
- ML20086C077 + (ML20086C077)
- B15225, Application for Amend to License NPF-49,by Incorporating Changes to TS Re 24-month Fuel Cycle Plant Sys Surveillance Extensions + (ML20086C081)
- ML20086C084 + (ML20086C084)
- 05000458/LER-1995-004-01, :on 950419,auxiliary Bldg Door Was Determined Inoperable Due to Failure of Latching Mechanism.Immediately Restored Secondary Containment Door to Acceptable Configuration + (ML20086C087)