Interim Deficiency Rept Re Welding Documentation on Class A,B,C & D Piping Sys.Initially Reported on 741031.Final Rept Expected by 750307
ML20086B949
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/29/1974
From:
TENNESSEE VALLEY AUTHORITY
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8311220126
Download: ML20086B949 (1)


Text

-

OTENNESSEE VALLEY ALgHOFilTV CH ATTANOOGA, TENNESSEE 37401 40 November 29, Icy 7h e sany O$[T EASM Mr. Donald F.

Knuth, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, DC 20545

Dear Mr. Knuth:

SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - WELDING DOCUMENTATION DEFICIENCY ON TVA CLASS A, B, C, AND D PIPING SYSTEMS Initial report of the subject deficiency was made verbally to C.

E. Murphy, AEC-DRO Region II Inspector, on October 31, 1974.

In compliance with paragraph 50.55 (e) of 10 CFR Part 50, this is submitted as an interim report.

Administrative measures to correct the subject deficiencies are being taken in accordance with sections XII and XIII of the TVA

~ ~~

~ ;

report, " Corrective Action Report for Welding," dated Oc*.ober 24, t

1974.

A copy of that report was given to C. L. Murphy, AEC-DRO Region 11 Inspector, on November 6, 1974.

We expect that we should be able to provide the final report by March 7, 1975.

Very truly yours,

,s

(

c

'J.

E. Gilleland Assistant to the Manager of Power CC:

Mr. Norman C. Moseley, Director Directorate of Tegulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.

- ~ >

Atlanta, Georgia J0303 3311220126 741129 PDR ADOCK 05000327 S