RC-95-0167, Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS
ML20086C025
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/30/1995
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Stephen Dembek
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086C027 List:
References
REF-GTECI-070, REF-GTECI-NI, TASK-070, TASK-70, TASK-OR GL-90-06, GL-90-6, RC-95-0167, RC-95-167, NUDOCS 9507060241
Download: ML20086C025 (3)


Text

a South Cirtline Electric & Gas Comp ny Giry J.Tryl r P.O. Box 88 Vee President Jenkinsville. SC 29065 Nuclear Operations (803) 345-4344 AMAMICarrpany June 30,1995 RC-95-0167 Document ControlDesk  :

U.S. Nuclear Regulatory Commission  !

Washington, DC 20555 '

Attention: Mr. Stephen Dembek Gentlemen: j

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) l DOCKET NO. 50/395 OPERATING LICENSE NO.NPF-12  :

TECHNICAL SPECIFICATION CHANGE -TSP 950002  :

POWER OPERATED RELIEF VALVES (PORVs) and BLOCK VALVES l South Carolina Electric & Gas Comp (SCE&G), acting for itself and as agent for South Carolina Public Service Author , hereby requests an amendment to the Virgil C. Summer Nuclear Station (VC NS) Technical Specifications (TS). This  ;

change is being submitted pursuant to 10 CFR 50.90. The proposed change will revise the specification for the Pressurizer Power Operated Relief Valves (3/4.4.4) to follow the guidance of Generic Letter (GL) 90-06, Generic Issue 70, and the improved Westinghouse Standardized Technical Specifications.

SCE&G responded to GL 90-06 on December 21,1990, at which time we indicated that there was no action required with respect to the Pressurizer Power Operated Relief Valves (PORVs). It was stated that they are not used to perform any safety related functions at VCSNS. Additional reviews have determined that credit is taken for the PORVs in the Steam Generator Tube Rupture recovery evolution as described in Chapter 15 of the VCSNS Final Safety Analysis Report.

The TS change request (TSCR) is contained in the following attachments:

AttachmentI Description of Changes Chart Marked-up Technical Specification Pages Revised Technical Specification Pages AttachmentII Description of Amendment Request and the Supporting Safety Evaluation AttaclunentIII Description of Amendment Request and the Associated NoSignificant Hazards Evaluation

~

This proposed TSCR has been reviewed and approved by both the Plant Safety Review Committee and the Nuclear Safety Review Committee.

(M. r. n o 9507060241 950630 10. j PDR ADOCK 05000395 - l L P PDR ,.

l l

.- j l

Docum:nt Crntr:1 D:sk l

TSP 950002 i RC-95-0167 Page 2 of2 ,

l l

I declare that these statements and matters set forth herein are true and correct to l the best of my knowledge, information, and belief.

Should,you have any questions, please call Mr. Philip Rose at (803) 345-4052 at your convemence.

Very truly urs, CVV Gar yo i PAR /GJT/dr  !

Attachments (3)  ;

. l c: J. L. Skolds J. B. Knotts Jr.  :

O. W. Dixon M. K. Batavia R.R.Mahan (w/o Attachments) J. I. Byrd R.J. White CentralFile System S. D. Ebneter RTS(TSP 950002)

NRC ResidentInspector File (813.20) i STATE OF SOUTHCAROLINA  :

TO WIT :

COUNTY OF FAIRFIELD  : l i

Ihereby certify that on the 36 da of duvve- 19 Q5before m a Notary Pubhc of the State of South darolina in and for 6Camkv chhI the sub criber, 3ersonally appeared Gary J. Taylor, being duly sworn, and states that he is Vice ,

? resident, Nuclear Operations of the South Carolina Electric & Gas Company, a '

corporation of the State ofSouth Carolina, that he provides the foregoing response for t the purposes therein set forth, that the statements made are true and correct to the i best of his knowledge, information, and belief, and that he was authorized to provide the response on behalf ofsaid Corporation. 1 WITNESS my Hand and NotarialSeal d SUEf bh &.

\ Not ublic M My Commission Expires M bra '

d003 Date l

NUCLEAR EXCELLENCE - A SUMMER TRADITION!

i

Document Control Desk

' Attachment I TSP 950002 RC-95-0167 Page 1 of1 SCE&G -- Explanation of Changes PAGE A e ted Description of Change Reason for Change g eti9n B]r 3/4410 3.4.4 1 Replaced Action a and Action b with Follows guidance ofNUREG 1431, Action a " Insert 1". E MERITS TS Section 3/4.4.11.A.

Action b Action c Renumbered Action c as " Action h" 2 Added clarification asterisk. For clarification.

New Page 3.4.4 1 New Action To comply,in part, with the 3/4 4-10a Action d recommendations provided in GL 90-06 Action e and NUREG 1431.

Action f 2 Added clarification asterisk. For clarification. _

New Page 3.4.4 1 New Action g. To comply,in part, with the 1 3/4 4-10b Action g Action h was originally Action c. recommendations provided in GL 90-06 Action h and NUREG 1431.

4.4.4.1 2 Deleted 4.4.4.1.a and 4.4.4.1.b. Moved Follows guidance of GL 90-06 for testing l 4.4.4.1.a the words from 4.4.4.1.b to the end of conditions. I 4.4.4.1.b 4.4.4.1. Added the words"during Modes '

3 or 4" to the end of 4.4.4.1.

4.4.4.2 3 Change "3.4.4.a or 3.4.4.b" to Necessary due to expanded Action "3.4.4.b,3.4.4.c, or 3.4.4.d" Statements -- editorial.

B 3/4 4-2 B 3/4.4.4 1 Replaced with new section. To provide more detail on the basis for and the PORV TechnicalSpecification.

B 3/4 4-2a i

l l

1

- _..,. ., ._. ~ -_ _ .- -. --- - - _ -. , . - . - . . , . . . _ . , . - . .