7
^
e L
IG FILE COW Public Service Electric and Gas Company 80 Park Placo Newark, N.J. 07101 Phone 201/622-7000 July 14, 1976 SPD Reference No.76-212 Director of Nuclear Reactor Regulation
[
U.
S.
Nuclear Regulatory Commission
'D Q' '(. \\ [yu
(\\.h Washington, D.
C.
20555 f
N gh.s g7 Attention:
Mr. Karl Kniel, Chief Light Water Reactors Branch 2 g:, ~4
,O c.s,
- =)
Gentlemen:
vM'
/.
<)
x REQUEST FOR DEFERMENT
\\
INCOMPLETE ITEMS N
a7 NO. 1 UNIT SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-272 In accordance with the requirements of 10CFR50 55(d) of the Commission's regulations, PSE&G hereby transmits a listing of incomplete preoperational tests and other items for which deferment until after core loading is indicated.
A review of our FSAR commitments has identified a small number of significant or safety related items that will not be com-pleted prior to our scheduled core load date of August 2, 1976.
We have evaluated these items and have determined that the incomplete status of these items at the time of core loading will have no adverse effect on the health and safety of the gen-eral public or station personnel.
Attachments 1 and 2 identify those items which will be completed prior to and after initial criticality, respectively.
The lists include our evaluation of the deferment of completion of the items.
We, therefore, request that the Operating License for Unit 1 be conditioned to reflect the completion of the items identified in the attachments in the sequence indicated.
Very tr'uly you s,
/
B311220170 760714 f
PDR ADOCK 05000272 Ifg,g A
PDR R.
L. Mittl General Manager - Projects EAL:ft Attach. (2)
/
enpv 9PNT REGIOT_
h The Energy People owni :=u w]
ATTACEMENT #1 ITEMS TO BE COMPLETED PRIOR TO INITIAL CRITICALITY
=
ITEM DESCRIPTION SAFETY EVALUATION 1
Auxiliary Unit No. 1 Auxiliary Building Postulated results of the'High Building Elevation 84.
An additional per-Energy Break Condition can not manent opening is required in the occur until after criticality pipe alley for High Energy Break is achieved.
Conditions.
O 2
Testing Verification of pressurizer relief To complete this test the pig'nt line high temperature alarm.
must be at operating conditions.
These conditions will not be attained until after core load.
3 Testing Demonstrate the ability to control The system must be in normal oper-Steam Generator Blowdown flow with ation before tests can be performed.
valves GB8 and GB10.
New trim has These conditions will not be attain-been added to these valves and addi-ed until after core load.-
tional testing is required.
4 Testing Demonstrate proper operation of The s'ystem must be in normal oper-valves llRH29 and 12RH29 (RHR Pump Theseconditionswillnotbeattlalln-ation before tests can be perfor p.
Recirculation).
Setpoints were adjusted and additional verifica-ed until after core load.
tion testing is required.
5 Testing Verify RHR pump motor winding The system must be in normal oper-temperature measurements.
ation before tests can be performed.
These conditions will not be attain-ed until after core load.
es e
NM
^
ATTACHMENT #1 (Paga 2)
ITEMS TO BE COMPLETED PRIOR TO INITIAL CRITICALITY l
ITEM DESCRIPTION SAFETY EVALUATION 6
Testing No. 14 Reactor Coolant Pump The system must be in normal oper-upper motor bearing was observed ation before tests can be p'erforded.
to have high vibration during These conditions will not be attain-Hot Functional Testing.
Motor ed until after core load, was rebalanced.
Retesting is required.
O 7
Testing No. 11 Reactor Coolant Pump demon-The system must be in normal oper-strated high leakage from No. 3 ation before tests can be performed.
seal during Hot Functional Testin~g.
These conditions will not be attnin-The seal has been replaced and ed until after core load, additional observation is required.
8 Testing Four RTD's in Reactor Coolant Sys-The system must be in normal oper-tem failed during Hot Functional ation before tests can be performed.
Testing.
These were replaced and These conditions will not be attain-will be retested.
ed until after core load.
O Testing
.Several snubbers were replaced fol-The system must be in normal oper-lowing Hot Functional Testing.
Addi-ation before tests can be performed.
tional~ thermal expansion measurements These conditions will not be attrg -
will be performed, ed until after core load.
W 10 Testing The following operational tests are These systems are not required to incomplete and will be performed and be operational until after core results reviewed prict to initial load.
criticality.
'l.
Boron Recycle (SUP 10.5) 2.
Waste Evaporator (SUP 16.2) 3.
Drumming Station (SUP 16.3) 4.
Rosin Removal (SUP 16.4) 5.
Response Time Testing (SUP 20.1) 6.
Process Radiation Monitoring System (all except those required by Tech Specs for Mode 6 operation) (SUP 22A)
. 9..
ATTACEMENT #1 (Page 3)
ITEMS TO BE COMPLETED PRIOR TO INITIAL CRITICALITY ITEM DESCRIPTION SAFETY EVALUATION 11 Testing Service Water (SUP 28)
System has been operated and has Operational testing has not been supported all testing required.'
completed.
Testing will be com-Delay of the formal operational pleted and results reviewed prior test will not effect the func-to initial criticality.
tioning or reliability of the system.
O 12 Testing Moisture Separator and reheater This SUP is a static test andAwill system performance (SUP 39).
be performed prior to turbind This test has not been completed.
operation.
The test will be performed and results reviewed prior to initial criticality.
' 13 Testing Control Room Air Conditioning System has been operated and has Operational testing has not been supported all testing required.
completed.
Tes ting will be com-Delay of the formal operational ~
pleted and results reviewed prior test will not effect the func-to initial criticality.
tioning or reliability of the system.
g 4
O a
e o
e en b e
e
,