Submits Update on Commitment for New Training Tracking Sys. Commitment Corrective Steps in Response to Violations Occurred Due to Inadequate Overview
ML20086C037
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/30/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS950153, NUDOCS 9507060246
Download: ML20086C037 (4)


Text

--

.y ' a

. 4 -

Me aska Public Power District _. _ _

a Co0PER NUCLEAR STATION P.O. BOX 98. 8AoWNVLLE, NEBRASKA M321 Nebr "iMWi ""

s

'NLS950153 June 30, 1995 U.S. Nuclear Regulatory Commission

. Attention: Document Control Desk' Washington, D.C.

20555

Subject:

NPPD Commitment for a naw Training Tracking System.

Reference:

1)

NRC Inspection Report 93-202, Violations 298/93202-04 and 298/93202-05 2)

Letter from G.

R. Horn (NPPD) to U.S.

Nuclear Regulatory Commission, dated June 20, 1994, "NPPD Response to Inspection Report 50-298/93-202."

l 3)

Letter from J.

H. Mueller (NPPD) to U.S.

Nuclear Regulatory Commission, dated December 19, 1994, "NPPD Commitment for a new Training Tracking System."

4)

Letter from J.

H. Mueller (NPPD) to U.S.

Nuclear Regulatory Commission, dated April 11, 1995, "NPPD Commitment"for a new--

Training Tracking System."

Gentlemen:

This correspondence is to update you on the District's commitment to have a new Training Tracking System final and in full use at Cooper Nuclear Station by June 30, 1995, as stated in an April 11, 1995, letter from J. H. Mueller to the NRC (Reference 4).

This commitment is one of the corrective steps in response to violations which occurred due to inadequate overview and commitment to the STA Training Program implementation by management and the involved individuals and an inadequate overview of the fire brigade training program. The underlying cause of these violations was failure en the part of management to adequately support these programs, and reinforce the training commitments inherent to the programs.

NPPD has taken aggressive action to correct these deficiencies and believes that actions taken will prevent recurrence.

The commitment to develop and install a new Training Tracking System is intended to provide an upgraded computerized tool to support NPPD's management and supervision while implementing the requirements of the' training program.

Hardware failures and software design discrepancies during the development project have resulted in eeveral schedule slippages.

The system software has I

been installed and validation and testing were in progress when a hardware i

f, component failure interrupted the project's progress.

The existing Training Tracking Syst' in use by NPPD provides adequate management information to monitor and control the training and qualification l

process. The new system will provide an enhanced human interface, faster on-j line response, and a more economic operation. The unavailability of the new i

Training Tracking System does not compromise our ability to ef fectively

.l monitor the training and certification status of our personnel.

{t

[

9507060246 950630 PDR ADOCK 05000298 q

g I

P PDR

=,

a.

  • o

NLS950153' June 30,1995 -

Page 2 NPPD is aggressively pursuing the completion of the new Training Tracking

' System development project, and will fully implement this enhancement to our existing process after full testing to ensure the system is reliable and will fully satisfy all tracking requirements. NPPD will notify the Nuclear Regulatory Commission by letter when this commitment has been fulfilled.

Should you have any questions or require additional information, please contact me.

Sincerely, N

Muell[r vohn H.

s'te Manager V nr cc:

Regional Administrator USNRC - Region IV Arlington, Texas Project Manager - Cooper USNRC - Region IV Arlington, Texas NRC Resident Inspector Cooper Nuclear Station i

4 f

h

4 l

LIST OF NRC COMMITMENTS l ATTACHMENT 3 l

Correspondence No: NLS950153 The'following table identifies those actions committed by the District in this document.

Any other actions discussed in the subn 11 represent intended or planned actions by the District. They are aribed to the NRC for the NBC's information and are not regulatory commit.i. t s.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE NPPD will notify the Nuclear Regulatory Commission by N/A letter when full implementation of the enhancement to our existing process is complete.

i l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER 0 l

PAGE 10 OF 16 l

,o l

RECORD OF NRC COMMITMENTS - NRC OUTGOING CORRESPONDENCE l ATTACHMENT 4 l

-Cortespondence No: NLS950153 s

The following commitments were made in this interaction.

There are no other commitments, expressed, or implied.

COMMITTED DATE COMMITMENT COMMITMENT RESPONSIBILITY OR OUTAGE NUMBER NPPD will notify the Nuclear Regulatory Commission by letter when full implementation of the enhancement to our existing process is complete.

J. W.'Dutton 8-31-95 950087-01 1

i l

REVISION NUMBER 0 l

PROCEDURE NUMBER 0.42 l

l PAGE 11 OF 16