Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080D915 + (ML20080D915)
- ML20080D920 + (ML20080D920)
- NRC-84-0017, Forwards Proprietary Response to NRC Comments on Steam Generator Tube Plugging Requirements.Requests That Tech Spec Tube Plugging Limit for Snupps Model F Steam Generators Be Established.Response Withheld (Ref 10CFR2.790) + (ML20080D924)
- ML20080D928 + (ML20080D928)
- ML20080D929 + (ML20080D929)
- ML20080D931 + (ML20080D931)
- ML20080D934 + (ML20080D934)
- ML20080D939 + (ML20080D939)
- RBG-15-671, Responds to IE Bulletin 83-05 Re ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co.Total of Four safety-related Hayward Tyler ASME Code Pumps Used in Standby Svc Water Sys + (ML20080D940)
- ML20080D943 + (ML20080D943)
- ML20080D946 + (ML20080D946)
- ML20080D950 + (ML20080D950)
- PY-CEI-NRR-0067, Forwards Clarifications Requested During 830818 Meeting Re Amend 12 to FSAR Section 17.2 Concerning Operational QA Program & Table 3.2-1, Equipment Classification. Encl Clarifications Will Be Incorporated Into Next FSAR Amend + (ML20080D951)
- 05000249/LER-1983-028-03, /03L-0:on 830723,differential Pressure Switch Ps 1349A Actuated Above Tech Spec Limit of 32.0 Inches of Water.Caused by Inadvertent Adjustment of High Differential Pressure Isolation Potentiometer + (ML20080D953)
- ML20080D955 + (ML20080D955)
- ML20080D957 + (ML20080D957)
- TXX-4034, Forwards Supplemental Response to Items 1.b,4 & 6 of SER Suppl 2,Section II.B.3 Open Items Re post-accident Sampling Sys + (ML20080D961)
- ML20080D962 + (ML20080D962)
- ML20080D963 + (ML20080D963)
- 05000395/LER-1983-086-03, /03L-0:on 830809,emergency Feedwater Supply Valve IFV-3536 to Steam Generator a Failed Closed.Caused by Failure of Output Transistor to Bistable Relay.Bistable Replaced + (ML20080D964)
- ML20080D967 + (ML20080D967)
- ML20080D969 + (ML20080D969)
- ML20080D976 + (ML20080D976)
- ML20080D977 + (ML20080D977)
- ML20080D983 + (ML20080D983)
- ML20080D985 + (ML20080D985)
- 05000255/LER-1983-052-01, /01T-0:on 830804,w/safety Injection Tank T-82D Inoperable Due to Routine Evolution,Second Safety Injection Tank T-82B Became Inoperable Due to Low Level.Caused by Leakage Past Fill & Drain Valve + (ML20080D992)
- ML20080D997 + (ML20080D997)
- 05000255/LER-1983-053-01, /01T-0:on 830806,during Normal Power Operation, Sample from Safety Injection Tank T-82D Showed Boron Concentration Below Tech Spec Limit.Caused by Minor Leak Past Loop Check Valve.Valves Will Be Inspected + (ML20080E000)
- NRC-84-0025, Notifies That Rev 2 to Rept of Independent Review of Environ Qualification Programs to NUREG-0588 Not Complete Reissue,Per .Several Rept Apps Had No Changes + (ML20080E002)
- ML20080E010 + (ML20080E010)
- ML20080E014 + (ML20080E014)
- 05000361/LER-1983-079-01, /01T-0:on 830804,while in Mode 1 During Routine Control Room Tour,Msiv 2HV-8249 Would Not Close & Declared Inoperable.Cause Unknown.Valve Will Remain Closed for Investigation + (ML20080E016)
- ML20080E021 + (ML20080E021)
- ML20080E026 + (ML20080E026)
- ML20080E027 + (ML20080E027)
- ML20080E036 + (ML20080E036)
- ML20080E039 + (ML20080E039)
- ML20080E040 + (ML20080E040)
- ML20080E049 + (ML20080E049)
- GO2-83-742, Final Deficiency Repts Re Conditions 264 & 276 Concerning Improperly Sized Overcurrent Devices & Diesel Generator 1A Bearing Failure,Respectively.Initially Reported on 830609 & 0802.Pump & Valve Operator Motor Fuses Replaced + (ML20080E050)
- ML20080E055 + (ML20080E055)
- ML20080E058 + (ML20080E058)
- ML20080E060 + (ML20080E060)
- ML20080E063 + (ML20080E063)
- AECM-83-0465, Discusses Comments in Sser 4,Section 22.2,II.B.3,re post- Accident Sampling Capability,Per 830822 Discussion W/F Witt. Forwards Procedures Re Grab Samples & Operation of in-line post-accident Sampling Sys.Analysis Data Encl + (ML20080E065)
- ML20080E071 + (ML20080E071)
- 05000285/LER-1983-007-03, /03L-0:on 830722,reactor Protective Sys Channel B Axial Power Distribution Positive Trip Setpoint Found Out of Spec Tolerance in Nonconservative Direction.Caused by Failure of Dual Potentiometer Module + (ML20080E074)
- ML20080E077 + (ML20080E077)
- ML20080E078 + (ML20080E078)
- ML20080E079 + (ML20080E079)