Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076K982 + (ML20076K982)
- 05000324/LER-1983-079-03, /03L-0:on 830807,during Diesel Generator 1 Monthly Load Test PT-12.2a,generator Reverse Power Trip Occurred, Rendering Diesel Unavailable for Automatic Operation.Caused by Personnel Error.Personnel Counseled + (ML20076K983)
- ML20076K984 + (ML20076K984)
- ML20076K986 + (ML20076K986)
- ML20076K988 + (ML20076K988)
- ML20076K989 + (ML20076K989)
- ML20076K991 + (ML20076K991)
- ML20076K993 + (ML20076K993)
- ML20076K994 + (ML20076K994)
- BSEP-83-3006, RO 1-83-40:on 830904,while Performing Periodic Test A4 on RCIC Steam Line High D/P Instrumentation,Hpci & RCIC Isolated.Caused by Periodic Test Incorrectly Written. Results Will Be Reported in 14-day Rept + (ML20076K995)
- 05000369/LER-1983-067-03, /03L-0:on 830806,during Surveillance,Upper Head Injection Level Switch Setpoints Found Out of Tolerance. Caused by Design Deficiency.Mod to Replace Switches W/Transmitters Will Be Implemented + (ML20076L008)
- 05000458/LER-1994-021, :on 940712,affected Equipment Declared Operable.Caused by Inadequate Control & Implementation of Procedure Writing,Review & Rev Process.Affected STPs Revised + (ML20076L012)
- RC-94-0280, Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing + (ML20076L017)
- BVY-94-103, Application for Amend to License DPR-28,consisting of Proposed Change 174,removing Neutron Flux Instrumentation from Post Accident Monitoring TS + (ML20076L019)
- ML20076L027 + (ML20076L027)
- ML20076L039 + (ML20076L039)
- ML20076L065 + (ML20076L065)
- 05000331/LER-1983-030-03, /03L-0:on 830812,diesel Generator (DG) Unit/ Parallel Switch on DG Control Panel Bumped Causing 1G-31 to Be Aligned in Parallel Rather than Control Mode.Caused by Personnel Error.Switch Reset + (ML20076L067)
- ML20076L076 + (ML20076L076)
- ML20076L106 + (ML20076L106)
- ML20076L107 + (ML20076L107)
- 05000255/LER-1983-043-03, /03L-0:on 830609,boron Concentration of Safety Injection Tank D Sample Did Not Reach Tech Spec Limit of 1,720 Ppm.Caused by Boron Dilution Due to Minor Leakage. Primary Coolant Leak Rate Being Monitored + (ML20076L118)
- ML20076L122 + (ML20076L122)
- ML20076L125 + (ML20076L125)
- ML20076L127 + (ML20076L127)
- ML20076L146 + (ML20076L146)
- ML20076L147 + (ML20076L147)
- ML20076L149 + (ML20076L149)
- ML20076L155 + (ML20076L155)
- 1CAN078304, Responds to 830524 Request for Addl Info Re Util 811118 Submittal on Natural Circulation Cooldown.Operators Trained on Mechanics of Void Formation & Recognition Techniques. Operator Actions Would Preclude Head Bubble Expansion + (ML20076L167)
- AECM-83-0543, Updated RO 83-015/3 Re Open fire-rated Penetrations.Caused by Incomplete Design Drawings or Const Oversight.Action Statement a of Tech Spec 3.7.7 Will Continue Until All Three Penetrations Closed + (ML20076L170)
- AECM-83-0373, Forwards Proposed Changes to Tech Specs,Enhancing Clarity or Providing Consistency W/Plant Design & Operation,Per 821014 Confirmation of Action Ltr.Changes Involve Nshc. Justification for Determination Encl + (ML20076L180)
- ML20076L186 + (ML20076L186)
- 05000333/LER-1993-009-02, Forwards LER 93-009-02 Re Low Rwl Scram Due to FW Transient. Replacement of Reactor Feed Discharge Valves W/Improved Design Scheduled So That One Valve Will Be Replaced During 1994 Refueling Outage + (ML20076L190)
- ML20076L196 + (ML20076L196)
- ML20076L199 + (ML20076L199)
- ML20076L201 + (ML20076L201)
- ML20076L203 + (ML20076L203)
- ML20076L207 + (ML20076L207)
- ML20076L208 + (ML20076L208)
- ML20076L213 + (ML20076L213)
- ML20076L217 + (ML20076L217)
- ML20076L221 + (ML20076L221)
- ML20076L229 + (ML20076L229)
- 05000331/LER-1983-026-03, /03L-0:on 830809,during Surveillance Testing, Auxiliary Relay in Main Steam Isolation Logic Failed to Deenergize.Caused by Melted Relay Coil Varnish.Relay Replaced + (ML20076L234)
- ML20076L235 + (ML20076L235)
- ML20076L237 + (ML20076L237)
- ML20076L239 + (ML20076L239)
- ML20076L244 + (ML20076L244)
- ML20076L246 + (ML20076L246)
- ML20076L252 + (ML20076L252)