ML20076L146
| ML20076L146 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/01/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, RDC-24(81), NUDOCS 8307190038 | |
| Download: ML20076L146 (1) | |
Text
f DinA e
f T. fy G I! '
f { f C ' b 14 E *)
Cl7PTDf IlMf
! L b I' I11* I ! M / "l l 9 f5 Oj
! Ii.$
1 fi O f; O 2 ;
'V L - kb 6 L.
UL t-. u.. If I s
> U ief i
,$V i P.O. box 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-980 ILLUMINATING BLDG.
- 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT July 1, 1983 NUCLEAR Mr. James C. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinoic 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Lubricating Oil System Defect in Standby Diesel Generators [RDC 24(81)]
Dear Mr. Keppler:
Our letter to you dated January 6,1983, stated that the installation of tubing for modification of the turbocharger lubricating oil system would be completed by July 1983 for Unit I and September 1983 for Unit 2.
Presently, 90% of the required parts have been received; however, installation cannot begin until repairs of Code piping welds are completed. We now anticipate completion by the following scheduled dates: Unit 1 - December 1983; Unit 2 -
February 1984.
Please contact us if you have any questions.
Sincerely, M
W Murray R. Edelman Vice President Nuclear Croup MRE:pab cc:
Mr. M. L. Gildner NRC Site Office om Director N$
Office of Inspection and Enforcement
-Q@
U.S. Nuclear Regulatory Commission go g
Washington, D.C.
20555 g
-Q U.S. Nuclear Regulatory Commissicn ou c/o Document Management Branch
-@O
. Washington, D.C.
20555 w<
bom Records Center, SEE-IN h$g; Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500
.g g Atlanta, Georgia 30339
+-vi1