ML20076K988

From kanterella
Jump to navigation Jump to search
Requests That ,Requesting Enforcement Discretion Be Withdrawn.Also,Informs That Requests to Change TS Sections 4.5.C.1.e & 4.5.D.1.e Will Be Submitted Per 10CFR50
ML20076K988
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/24/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9411020244
Download: ML20076K988 (1)


Text

sa a

m a

Stattrn tupport Departmint P.ECO ENERGY is agif";m,,

965 Chesterbrook Boulevard Wayne, PA 19087,!691 j

October 24,1994 Docket No. 50-277 Ucense No. DPR-44 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 2 Request for Enforcement Discretion from Technical q

Specification Sections 4.5.C.1.e and 4.5.D.1.e, "HPCI Subsystem" and "RCIC Subsystem" t

Reference:

Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC dated October 21,1994

Dear Sir:

As discussed with the NRC on October 24,1994, this letter is being submitted to request that our reference letter requesting Enforcement Discretion (ED) be withdrawn. As discussed, we will be submitting requests to change the Technical Specifications Sections 4.5.C.1.e and 4.5.D.1.e in accordance with the requirements of 10CFR50.

-l If you have any questions concerning this matter, please do not hesitate to contact us.

Very truly yours,

).,

' G. A. Hunger, r.

Director - Ucensing cc:

T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania 9411o2o244 941o24 PDR ADoCK 05o00277

\\'

O_

.