ML20076K988
| ML20076K988 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/24/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9411020244 | |
| Download: ML20076K988 (1) | |
Text
sa a
m a
Stattrn tupport Departmint P.ECO ENERGY is agif";m,,
965 Chesterbrook Boulevard Wayne, PA 19087,!691 j
October 24,1994 Docket No. 50-277 Ucense No. DPR-44 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 2 Request for Enforcement Discretion from Technical q
Specification Sections 4.5.C.1.e and 4.5.D.1.e, "HPCI Subsystem" and "RCIC Subsystem" t
Reference:
Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC dated October 21,1994
Dear Sir:
As discussed with the NRC on October 24,1994, this letter is being submitted to request that our reference letter requesting Enforcement Discretion (ED) be withdrawn. As discussed, we will be submitting requests to change the Technical Specifications Sections 4.5.C.1.e and 4.5.D.1.e in accordance with the requirements of 10CFR50.
-l If you have any questions concerning this matter, please do not hesitate to contact us.
Very truly yours,
).,
' G. A. Hunger, r.
Director - Ucensing cc:
T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania 9411o2o244 941o24 PDR ADoCK 05o00277
\\'
O_
.