m VERMONT YANKEE NUCLEAR POWER-STATION 4
MONTHLY STATISTICAL REPORT 83-06 FOR THE MONTH OF JUNE, 1983 4
fu O
e T
OPERATING DATA REPORT 50-271 DOCKET NO.
DATE 830712 COMPLETED BY F.J. Burner TELEPHONE (802) 257-7711 Ext. 136 OPERATING STATUS Notes
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
June
- 3. Licensed Thermal Power (MWt):
1593
- 4. N:meplate Rating (Gross MWe):
540
- 5. Design Electrical Rating (Net MWe): 514(OC) 504(CC)
- 6. Maximum Dependable. Capacity (Gross MWe):
535
- 7. Maximum Dependable Capacity (Net MWe):
Sna
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
N/A
- 9. Power Level to Which Restricted If Any(Net MWe):
N/A
-10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative 11.. Hours In-Reporting Period.
720.00 4343.00
- 12. Nuuber Of Hours Reactor Was Critical 298.02 1769.44 75312.43
_13. Reactor Reserve Shutdown Hours n.0n
'n.nn n nn
~
- 14. H:urs Generator On-Line 232.07 1691.27 73110.96
- 15. Unit Reserve Shutdown Hours n.00 n_nn n nn
- 16. Gross Thermal-Energy Generated (MWH) 262851.00 2252807.50 105292050.00
- 17. Gross Electrical Energy Generated (MWH) 81835.00 748737.00 35009884.00 18.'N;t Electrical Energy Generated (MWH) 75558.00 712922.00 33201463.00
- 19. Unit Service Factor' 19.91 ag_oa 77.33 20'. Unit Availability Factor 32.23 38.94 77.41
- 21. Unit Capacity Factor (Using MDC Net) 20.82 32.57 69.76
- 22. Unit Capacity Factor (Using DER Net)
'20.42 31.94' 68.40 23.fUnit Forced Outage Rate 67.77 43.17 7.74-
' 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
'26. Units In Test Status (Prior to-Commercial Operation):
Forecast Achieved i~
INITIAL CRITICALITY
' INITIAL ELECTRICITY COMMERCIAL OPERATION.
b 1
.m w
+
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 Vermont Yankee UNIT 830712 DATE COMPLETED BY F. J. Bury,er (802) 257-7711 Ext. 136 TELEPHONE MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
0 17.
0 2.
0 18.
n 0
3.
19, 9
j 4.
0 20.
24-5.
0 21.
65 6.
0 22.
117 7.
0 23.
304 8.
0 24.
393 9.
0 25.
1st 10.
0 26.
452 11.
0 27.
499 l
12.
0 28.
son 13.
0 29.
ann 14.
0 30.
1An 15.
0 31.
16.
O INSTRUCTIONS:
_On-this format, list the average daily unit power level in MWe-Net for each day in the. reporting month. Compute to the nearest whole megawatt.
m 7
g w
= _ _ _ _ _ - _ _
. ~.
r t
+
s
' UNIT SHUTDOWNS AND POWER REDUCTIONS DdCKET No 50-271 UNIT NAME-Vermont Yankee REPORT MONTH
. June 0712 COMPLETED BY F. J. Burger TELEPHONE (802) 257-7711 ext. 136 s-I 8 '2 Cause & Corrective n
o No.
Date y --
ty g
g g.
g,s.
Action to License o
E Rep rt#
x g
u a
83-04' 830305 F
437.02 A 3
LER CB PIPEXX Continued the 1983 refueling outage (Cont.)'
83-12/IP repairs o'n the Reactor' Recirculation System as required by I&E Bulletin 83-02, were performed.
83-05 830619
.F 29.70 B
N/A N/A N/A N/A Turbine generator taken off line for overspeed testing and balancing.
83-06 830629 F
21.21 G
2 N/A N/A N/A While performing surveillance testing, the reactor recirculation pump isolation valves inadvertently went shut tripping.
the recirculation pumps. The reactor was manually scrammed.
o-t t
4 1 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure'(Explain) 1-Manual for' Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File
-D-Regulatory Restriction 4-Other (Explain)
(NUREG 0161) i E-Operator Training & License Examination s
' F-Adminis tra tive 5 Exhibit I - Same Source l
G-Operational Error (Explain)
H-Other (Explain) f 7/801
DOCKET NO.
'50-271' UNIT Vermont Yankee DATE 830712 COMPLETED BY F. J. Burger-TELEPHONE (802) 257-7711 Ext. 136 SAFETY RELhTED MAINTENANCE Page 1 of 1 l
NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RllR Heat Exchanger Corrective N/A-Worn Parts Leakage Replaced Gaskets E14-1A MR 83-0239 CAD Flow Transmitter Corrective N/A Failed Parts Unresponsive Replaced Transmitter FT-VG-LB MR83-1077 Reactor Vessel Level Corrective N/A Worn Parts Unable to Replaced Transmitter Transmitter LT2-3-72A MR 83-1107 Calibrate N
o t-DOCKET NO.
Vermont Yankee UNIT 830712 DATE COMPLETED BY F. J. Burger (802) 257-7711 Ext. 136 TELEPHONE REPORT MONTH June
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 22.92% of rated thermal power for the month.
Gross electrical generation was 81835 MWH or 21.05%of design electrical capacity.
~
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was shutdown for the extended 1983 refueling outage.
The outage was extended to repair the reactor recirculation piping as required by I&E Bulletin 83-02, 830617
'At 2037 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.750785e-4 months <br /> the reactor was critical.
830619 At 0501 hours0.0058 days <br />0.139 hours <br />8.28373e-4 weeks <br />1.906305e-4 months <br /> the turbine generator was phased onto the grid.
830619 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> the turbine generator was removed from the grid for overspeed testing and balancing.
'830620 At 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br /> the reactor scrammed'when the low condenser vacuum switches were bypassed too soon.
830620 At 0552 hours0.00639 days <br />0.153 hours <br />9.126984e-4 weeks <br />2.10036e-4 months <br /> the reactor was critical.
830620 At 1452 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.52486e-4 months <br /> the turbine generator was phased onto the grid.
830629 At 1437 hours0.0166 days <br />0.399 hours <br />0.00238 weeks <br />5.467785e-4 months <br /> the reactor was manually scrammed when the reactor recirculation pumps tripped (See unit shutdowns.and power reductions).
830630 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> the reactor was critical.
830630 At 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> the-turbine generator was phased onto the grid.
~At the end of the reporting period the plant was operating at 79.5%
'of rated thermal power.
W.
.L u
. VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 83-134 July 12, 1983 l
l United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, DC 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of June, 1983.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION M
W.
. Murphy Vice President anager of Operations WPM /caf l
0fl