Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072D398 + (ML20072D398)
- 05000325/LER-1983-006, Forwards Updated LER 83-006/03L-1 + (ML20072D401)
- ML20072D403 + (ML20072D403)
- 05000325/LER-1983-006-03, Insert/Withdrawal Position & Drive Power Indication for Source Range & Immediate Range Monitors Discovered Inoperable.Caused by Blown Control Power Supply Fuse F13.Fuse Replaced + (ML20072D408)
- ML20072D410 + (ML20072D410)
- ML20072D412 + (ML20072D412)
- 05000328/LER-1983-017-03, /03L-0:on 830201,at 100% Power,Containment Pressure for Annulus Discovered to Be Greater than +0.3 Psi. Caused by Normal Air Leakage Into Containment W/O Venting. Personnel Reminded to Vent Containment + (ML20072D414)
- AECM-83-0145, Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetrations. Bunker-Ramo Electrical Penetrations Not Used at Facility.Three Manhours Expended in Bulletin Response + (ML20072D418)
- 0CAN038316, Forwards Outline of Schedule for Spent Fuel Storage Expansion.Response by 830325 Requested So Util Can Adjust Planning & Work Plans + (ML20072D422)
- ML20072D426 + (ML20072D426)
- ML20072D430 + (ML20072D430)
- ML20072D437 + (ML20072D437)
- ML20072D440 + (ML20072D440)
- ML20072D445 + (ML20072D445)
- ML20072D449 + (ML20072D449)
- ML20072D450 + (ML20072D450)
- 05000361/LER-1983-051-03, /03X-0:on 830501,control Room Complex Isolation Dumper 2/3HV9702 Did Not Close as Required on Spurious Tgis. Caused by Dirt on Reset Relay.Relays Cleaned + (ML20072D455)
- ML20072D463 + (ML20072D463)
- ML20072D469 + (ML20072D469)
- ML20072D470 + (ML20072D470)
- ML20072D482 + (ML20072D482)
- ML20072D488 + (ML20072D488)
- 05000327/LER-1994-003, :on 940310,errors Identified in Two Separate SIs Resulted in Failure to Comply W/Two TS Srs.Caused by Inadequate procedure-rev Reviews.All Operations SIs Reviewed to Ensure Spec SRs Properly Ref + (ML20072D489)
- W3P82-0675, Advises That Tech Specs 3/4.9.7 Will Prohibit Travel of Heavy Loads Over Fuel Assemblies in Storage Pool. NUREG-0612 Interim Requirements Per SER Satisfied + (ML20072D490)
- L-83-125, Advises of Review of IE Bulletin 83-01, Failure of Reactor Trip Breakers (Westinghouse DB-50) to Open on Automatic Trip Signal. Plant Does Not Have Subj Breakers or Employ Subj Trip Design + (ML20072D492)
- 05000373/LER-1983-012, Forwards LER 83-012/03L-0 + (ML20072D494)
- ML20072D496 + (ML20072D496)
- ML20072D498 + (ML20072D498)
- 05000346/LER-1983-011, Forwards LER 83-011/03L-0 + (ML20072D505)
- ML20072D507 + (ML20072D507)
- 05000373/LER-1983-012-03, /03L-0:on 830210,during LIS-R1-03,RCIC Leak Detection Temp Switch Setpoints Found Out of Calibr.Caused by Defective Calibr Instrument.Temp Switches Recalibr.Calibr Instrument Replaced + (ML20072D508)
- ML20072D513 + (ML20072D513)
- ML20072D519 + (ML20072D519)
- 05000346/LER-1983-011-03, /03L-0:on 830211,auxiliary Feedwater Pump Turbine 2 Overspeed Trip Alarm Sounded.Caused by Personnel Error. Personnel Bumped Turbine Overspeed Trip Linkage Causing Trip of Trip Throttle Valve When Removing Case Guards + (ML20072D522)
- 05000327/LER-1994-011, :on 940715,manual Reactor Trip Was Initiated Due to Loss of Reactor Coolant Pump.Caused by Personnel Error.Failed Components Were Replaced & Controller Was Tested,Calibrated & Returned to Service + (ML20072D526)
- ML20072D529 + (ML20072D529)
- ML20072D533 + (ML20072D533)
- ML20072D543 + (ML20072D543)
- 05000324/LER-1983-017, Forwards LER 83-017/03L-0 + (ML20072D544)
- ML20072D545 + (ML20072D545)
- ML20072D551 + (ML20072D551)
- 05000327/LER-1994-012, :on 940715,discovered That Containment Bldg Penetration Surveillance Not Implemented in Instructions as Required by TS SR 4.9.4.Caused by Inadequate Procedure Rev. Surveillance Instructions Revised + (ML20072D552)
- ML20072D562 + (ML20072D562)
- 05000324/LER-1983-017-03, /03L-0:on 830126,during Standby Gas Treatment Sys Heater Check,One Heater Element in Treatment Sys a Found Inoperable.Caused by Damaged Power Supply Cable Terminal Lug Ring.Lugs Checked for Proper Tightness + (ML20072D570)
- 05000348/LER-1983-006, Forwards LER 83-006/01T-0 + (ML20072D574)
- ML20072D578 + (ML20072D578)
- 05000348/LER-1983-006-01, /01T-0:on 830215,both Trains of Common Control Room Filtration Unit Penetration Room Filtration Sys Carbon Filters Train a Failed to Meet Criteria for Iodine Removal Efficiency.Caused by Misinterpretation of Reg Guide 1.52 + (ML20072D584)
- ML20072D589 + (ML20072D589)
- 05000321/LER-1983-011, Forwards LER 83-011/03L-0 + (ML20072D591)
- NRC-94-4263, Forwards Table Identifying RAIs Issued Since Rev of SSAR That Impact One or More SSAR Section,In Fulfillment of Commitment Made in + (ML20072D607)
- ML20072D608 + (ML20072D608)