Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20136C7651985-10-31031 October 1985 Special Rept 85-010:on 851001,two Failures of Diesel Generator a Occurred.Caused by Closed Governor Needle Valve. Valve Opened Slightly & Procedure Sys KJ-121, Diesel Generator NE01 & NE02 Lineup for Automatic... Revised ML20072D5131983-06-17017 June 1983 Ro:On 830614,sealed Source w/Ru-106 Leak Tested.Results Showed 0.005 Uci Activity Removed by Smear.Second Test on 830617 Showed 0.00016 Uci Removed.Source Removed from Use 1985-10-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20205B0921998-12-31031 December 1998 Rept of Reactor Operations for Jan-Dec 1998. with ML20217A6341997-12-31031 December 1997 Rept on Reactor Operations for Period Jan-Dec 1997. W/ ML20137J3941996-12-31031 December 1996 Rept on Reactor Operations for Period Jan-Dec 1996 ML20137D5431996-12-31031 December 1996 Report on Reactor Operations for Period Jan-Dec 1996. W/ ML20132H1411995-12-31031 December 1995 Rept on Reactor Operations for Period Jan-Dec 1995 ML20132H1361994-12-31031 December 1994 Rept on Reactor Operations for Period Jan-Dec 1994 ML20132H1311993-12-31031 December 1993 Rept on Reactor Operations for Period Jan-Dec 1993 ML20132H1221992-12-31031 December 1992 Rept on Reactor Operations for Period Jan-Dec 1992 ML20132H1171991-12-31031 December 1991 Rept on Reactor Operations for Period Jan-Dec 1991 ML20132H1111990-12-31031 December 1990 Rept on Reactor Operations for Period Jan-Dec 1990 ML20132H1061989-12-31031 December 1989 Rept on Reactor Operations for Period Jan-Dec 1989 ML20248A0171988-12-31031 December 1988 Rept on Reactor Operations for 1988 ML20153D3421988-04-30030 April 1988 Safety Evaluation Report Related to the Renewal of the Operating License for the Research Reactor at Purdue University ML20132H0861987-12-31031 December 1987 Rept on Reactor Operations for Period Jan-Dec 1987 ML20132H0741986-12-31031 December 1986 Rept on Reactor Operations for Period Jan-Dec 1986 ML20199K4621986-06-30030 June 1986 SAR for Purdue Univ PUR-1 Reactor ML20132H0561985-12-31031 December 1985 Rept on Reactor Operations for Period Jan-Dec 1985 ML20199K4491985-12-31031 December 1985 Purdue Univ Financial Rept,1984-1985 ML20136C7651985-10-31031 October 1985 Special Rept 85-010:on 851001,two Failures of Diesel Generator a Occurred.Caused by Closed Governor Needle Valve. Valve Opened Slightly & Procedure Sys KJ-121, Diesel Generator NE01 & NE02 Lineup for Automatic... Revised ML20132H0501984-12-31031 December 1984 Rept on Reactor Operations for Period Jan-Dec 1984 ML20132H0471983-12-31031 December 1983 Rept on Reactor Operations for Period Jan-Dec 1983 ML20070S1031983-06-30030 June 1983 Doubly Labeled Water (3-HH-18-0) Method:Guide to Use, UCLA Publication 12-1417 ML20072D5131983-06-17017 June 1983 Ro:On 830614,sealed Source w/Ru-106 Leak Tested.Results Showed 0.005 Uci Activity Removed by Smear.Second Test on 830617 Showed 0.00016 Uci Removed.Source Removed from Use ML20132H0401982-12-31031 December 1982 Rept on Reactor Operations for Period Jan-Dec 1982 ML20132H0361981-12-31031 December 1981 Rept on Reactor Operations for Period Jan-Dec 1981 ML20004F0281981-06-0808 June 1981 Ro:On 810602,reactor Scram Times Exceeded Tech Specs Limits. Caused by Tech Specs Ambiguity Between Measured Rod Drop Times & Reactor Scram Times.Proposes Continued Operation W/ No Changes.Tech Specs Change Request to Be Submitted ML20132H0321980-12-31031 December 1980 Rept on Reactor Operations for Period Jan-Dec 1980 ML20132H0291979-12-31031 December 1979 Rept on Reactor Operations for Period Jan-Dec 1979 ML20132H0241978-12-31031 December 1978 Rept on Reactor Operations for Period Jan-Dec 1978 ML20062F3521978-11-28028 November 1978 Safety Eval Rept Supporting Amend 3 to Oper Lic R-87. Concludes Amend Does Not Involve Significant Hazards Consideration,Safety of Pub Not Endangered & Activities Conducted in Compliance Will Not Be Iminical to Defense ML20132H0181977-12-31031 December 1977 Rept on Reactor Operations for Period,Jan-Dec 1977 1998-12-31
[Table view] |
Text
-
&Nf3 PURDUE OFFICE OF HEALTH PHYSICS AND RADIOLOGICAL CONTROL June 17, 1983 Region III Office of Inspection and Enforcement USNRC 799 Roosevelt Road Glen Ellyn IL 60137 ATTN: Mr. D. Sreniawski
Dear Sir:
The following summary is forwarded to report a leaking sealed source which was discovered as a result of a routine 6-month leak test survey.
, On June 14, 1983 a Ruthenium-106 (Ru-106) sealed source, owned by Argonne National Laboratory and on loan to Dr. E. Shibata of the Physics i Department at Purdue University, was leak tested. The results of the l June 14, 1983 leak test showed 0.005 pCi of activity was removed by the l smear. A second leak test on the nearest accessible surface, when the j source is in use, was performed on June 16, 1983. The results showed O.00016 pCi were removed. The source was taken out of use June 16, 1983.
The Ru-106 source had a nominal activity of 100 pCi on February 22, 1979. The decay corrected a:tivity is 5.2 pCi as of June 14, 1983 (T - 368 days).
l l
The source is enclosed in a box with a sliding door opening which allows exposure of the source. The June 14, 1983 leak test was per-formed inside the box. The June 16, 1983 leak test was performed on the outside of the " doors".
l 3 i%_,
$ \
i?
'_ _I.T T.
l N~
l
, N '
doors Source at back '
of box i
C3 C 0. Pharmacy Building 0- Q A' West Lafayette, Indiana 47907
$$$'$$0$b0 p$ JUN 2 01983 o
jfo HD 7
Mr. D. S':niawski r
Page 2 June 17, 1983 A gamma analysis of the June 14, 1983 leak test varified that the contamination was Ru-106. The identification was made since peaks with energies of 0.512 and 0.622 Mev were present and are associated with Ru-106 daughter decay.
Dr. Shibata stated on June 17, 1983 that he would like the source returned to Argonne National Laboratory. Argonne National Laboratory was called June 17, 1983 and arrangements finalized to allow return of the~ source.
Sincerely,
//h1c w
- Gordon S. Born Radiological Safety Officer GSB/cg cc
. . . . . . . _ _ . _ _ _ . .