Text
e-
~
Georgia Power Company 333 Pecmont Avenue Attanta Georgia 30308 Te'ephone 404 526-6526 g{p 9 I5 Mathog Address.
AliA
"~
Post Oftce Box 4545 m
A!!anta George 30302 T
n9: 5 Georgia Power Power Generation Department March 3, 1983 l
U..S.
Nuclear Regulatory Commission Office of Inspection and Enforcement
Reference:
Region II - Suite 2900 RII: JPO:
101 Marietta Street 50-321,366 Atlanta, Georgia 30303 IEB 82-04 Attn:
Mr. James P.
O'Reilly Gentlemen:
The following response addresses IE Bulletin No. 82-04 which was transmitted by letter dated D9.cember 3, 1982.
On March 3, 1983, Mr.
R.
D.
Baker of this office requested an extension of the due date of the subject bulletin with Mr. John Rogge of the Region II staff.
Mr. Rogge verbally granted GPC an extension to March 10, 1983 for the response to this Bulletin.
This letter constitutes a formal request for extension of that deadline and reconfirms GPC's intention to respond by March 10, 1983.
Sincerely, I
WI &"
L. T.
Gucwa l
Chief Nuclear Engineer CBS:lb xc:
J.
T.
Beckham, Jr.
H. C. Nix l
Senior Resident Inspector i
i d
OC 0
a
~rEs(
.-.