ML20072D430

From kanterella
Jump to navigation Jump to search

Forwards Rev 0 to Detailed Control Room Design Review (Dcrdr) Program Plan for Davis Besse Nuclear Power Plant, in Response to NRC & Commitments Per Util
ML20072D430
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20072D434 List:
References
RTR-NUREG-0737, RTR-NUREG-737 958, TAC-51154, NUDOCS 8306230259
Download: ML20072D430 (1)


Text

-

u-TOLEDO

%mm EDISON RCHARo P. CAOUSE Docket No. 50-346 v , %,,o.

Nudiar License No. NPF-3 Serial No. 958 June 15, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Our letter dated April 15, 1983 (Serial No. 933) committed Toledo Edison to submit our program plan for a Detailed Control Room Design Review (DCRDR), in response to your letter dated December 17, 1982 (Log No.

1168). The attached DCRDR program plan is for the Davis-Besse Nuclear Power Station, Unit No. 1.

The overall schedule on this item, (DCRDR), as well as the other items in Supplement I to NUREG-0737, is outlined in Figure 2-1 of our April 15, 1983 submittal. Please refer to this figure for the time allowed for NRC review to ensure Toledo Edison can meet the milestone dates as submitted.

Very truly yours, RPC:LDY:lah enclosure cc: DB-1 NRC Resident Inspector

- - + +

0306230259 030615 PDRADOCK05000g THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 Ift Y.