THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI, OHIO 45201 June 15, 1983 LOZ-83-0050 J. WILLlAMS JR sEN#OR VtCC PRESIDENT NUCLEAR OPERATPONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G.
Keppler
-Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-62 FIRE DAMPER FAILURE W.O.
57300, JOB E-5590, FILE NO. 956C,-M-62 This letter constitutes a final report concerning the subject deficiency. initially reported to the Commission on October 29, 1982 under the requirements of 10CFR50.55 (e).
As indicated in the previous report, QA-2280, dated March 7, 1983, fire dampers as manufactured by Air Balance Inc. (ABI) and supplied to the project by Waldinger-Young & Bertke (W-Y&B) are
. located in various safety related HVAC systems in the plant.
The fire damper blade is held in an open posiFinn by "J" hooks joined to a fusible link.
This configuration restrains the damper blade from closing until a temperature of 160 F is reached, the link melts and the damper blade closes and isolates the associated ductwork.
One damper, lVDO4YA, located in the Diesel Generator i
Ventilation System was identified in which the fusible link had i
I melted and the hooks latched onto the damper blade, prohibiting proper closure of the damper.
This problem was attributed to the fact that the hooks pointed upward toward the blades.
JUN 2 01983 g62sO2688306, ADOCK 05000358 g
a Mr. J.G. Keppler Regional Administrator June 15, 1983 LOZ-83-0050 Page 2 To prevent recurrence of this problem, the orientation of the "J" hooks on all seismic ABI fire dampers have been reversed so that the open end is pointed away from the blade.
W-Y&B performed the work of repositioning the "J" hooks and surveillance reports of their QA/QC inspections are available on site.
We trust the above will be found acceptable as final report under 10CFR50.55 (e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY
_ gs _ w By WILLIAMS,Jh.,
ENIOR VICE PRESIDENT DJS/KRK/sfr cc:
NRC Office of Inspection &' Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector ATTN:
W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz swww Y