Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064F962 + (ML20064F962)
- ML20064F963 + (ML20064F963)
- RBG-14-081, Confirms 820727 Telcon Between Util,Nrc & Ae Re Control of Heavy Loads.Phase 1 Work Currently Scheduled for Submittal on 830805.Phase 2 Anticipated to Be Complete by First Quarter 1984 + (ML20064F964)
- 05000387/LER-1982-068-03, /03L-0:on 821201,discovered That Tech Spec Surveillance Requirement 4.7.6.3.2.a (Carbon Dioxide Storage Tank Level) Not Included in Any Surveillance Procedure. Caused by Human Error.Procedure Revised to Include Checks + (ML20064F966)
- ML20064F967 + (ML20064F967)
- ML20064F968 + (ML20064F968)
- ML20064F972 + (ML20064F972)
- ML20064F976 + (ML20064F976)
- ML20064F978 + (ML20064F978)
- ML20064F979 + (ML20064F979)
- ML20064F980 + (ML20064F980)
- ML20064F982 + (ML20064F982)
- ML20064F984 + (ML20064F984)
- ML20064F985 + (ML20064F985)
- ML20064F986 + (ML20064F986)
- ML20064F991 + (ML20064F991)
- ML20064F993 + (ML20064F993)
- ML20064F994 + (ML20064F994)
- ML20064G001 + (ML20064G001)
- ML20064G005 + (ML20064G005)
- ML20064G009 + (ML20064G009)
- ML20064G010 + (ML20064G010)
- ML20064G012 + (ML20064G012)
- 05000333/LER-1982-055, Forwards LER 82-055/03L-0 + (ML20064G014)
- ML20064G019 + (ML20064G019)
- ML20064G026 + (ML20064G026)
- 05000333/LER-1982-055-03, /03L-0:on 821214,turbine Steam High Flow Containment Isolation Switch 13-DPIS-84 Setpoint Found Less Conservative than Tech Specs.Caused by Instrument Drift. Setpoint Adjusted to within Required Value + (ML20064G030)
- ML20064G036 + (ML20064G036)
- ML20064G039 + (ML20064G039)
- 05000333/LER-1982-054, Forwards LER 82-054/03L-0 + (ML20064G043)
- 05000334/LER-1982-055, Forwards LER 82-055/03L-0 + (ML20064G048)
- ML20064G063 + (ML20064G063)
- 2CAN018304, Application to Amend License NPF-6,removing Automatic Recirculation Actuation Signal to HPSI mini-recirculation Valves.Safety Evaluation Encl + (ML20064G067)
- 05000333/LER-1982-054-03, /03L-0:on 821213,difficulty Experienced in Initiating Trip on DPIS-76 & Venting Low Pressure Side of DPIS-77 During Surveillance Testing.Caused by Incomplete Instrument Surveillance Procedure.Procedure Revised + (ML20064G071)
- B10638, Advises That Extra Time Needed to Respond to Question 4 of NRC Re Measurement Uncertainties Used in Safety Analyses,Since Final Designs for Several Measurement Channels Not Yet Finalized + (ML20064G083)
- ML20064G084 + (ML20064G084)
- ML20064G088 + (ML20064G088)
- 05000334/LER-1982-055-03, /03L-0:on 821130,Operations Surveillance Test 1.47.3A Not Performed within 25% Max Allowable Extension & ASME Oct & Nov Monthly Valve Restroking Not Conducted.Caused by Human Error.Present Scheduler Trained + (ML20064G089)
- ML20064G097 + (ML20064G097)
- ML20064G098 + (ML20064G098)
- ML20064G099 + (ML20064G099)
- 05000271/LER-1982-025, Forwards LER 82-025/03L-0 + (ML20064G100)
- ML20064G108 + (ML20064G108)
- 05000293/LER-1982-013, Forwards Updated LER 82-013/03X-1 + (ML20064G110)
- 05000271/LER-1982-025-03, /03L-0:on 821201,drywell Atmospheric Temp Recorder TR-1-149 Found Inoperable.Caused by Failure of Servo Motor Logic Ground Connection.Ground Restored & Recorder Calibr & Returned to Svc + (ML20064G115)
- 2CAN018303, Application to Amend License NPF-6,deleting Requirement for Monthly Channel Functional Tests of Plant Protection Sys for Jan 1983.Access to Plant Protection Sys Cabinets Should Be Limited Prior to Circuit Mods + (ML20064G122)
- ML20064G124 + (ML20064G124)
- 05000293/LER-1982-013-03, HPCI High Temp Switch TS2373C,contributing to Trip Logic of HPCI Turbine,Did Not Actuate.Caused by Heat Gun Reducing Output & Air Currents in Area of Switches During Test.Heat Output to Be Shielded + (ML20064G134)
- 05000387/LER-1982-066, Forwards LER 82-066/03L-0 + (ML20064G141)
- ML20064G146 + (ML20064G146)
- 05000325/LER-1978-080, Forwards LER 78-080/03L-0 + (ML20064G148)