Monthly Operating Rept for Feb 1993 for Waterford 3
ML20064F967
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/28/1994
From: Burski R, Wiegert E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0031, W3F1-94-31, NUDOCS 9403150514
Download: ML20064F967 (7)


Text

w

. M E ENTERGY 9"",""""*'

/ .y t ' , '

- _ . . _ . _ - - , . . - - -- - -- - - - - ~ - ---u-a -+----*----i--------------+

R. F. Durski a; ,

j W3F1-94-0031 A4.05 PR March 14, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of February, 1994. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

. p glL' R.F. Burski Director Nuclear Safety RFB/TSB/ssf Attachment cc: L.J. Callan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INP0 Records Center), NRC Resident Inspectors Office l

9403150514 940220 bh y /p)!

i 1

PDR ADOCK0500g2 R ,

i

t l

i l .\

l NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 FEBRUARY 1994 l

The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period. l l

! i l

.i l :1 i

.I i

i

?. .l l

1

d PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of February 1994, there were no pressurizer safety valve failures or challenges.

l i

.1

.* l

.. j OPERATING DATA REPORT

~

^

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY: E.G. WlEGERT TELEPHONE: 504-739-6446 l QPERATitLG STATUS .I

1. Reporting Period: February,1994 Gross Hours in Reporting Period: 312-
2. Carrently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Not MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restricticn (if any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor was Critical 672.0 1,416.0 62,516.0
6. Reactor Reserve Shutdown Hours 7. Hours Generator was On-line 672.0 1,416.0 61,704.2
8. Unit Reserve Shutdown Hours 9. Gross Thermal Energy Generated (MWH) 2,273,776 4.791,006 203,819,483
10. Gross Electrical Energy Generated (MWH) 743,540 1,567,710 67,988.490
11. Not Elecincal Energy Generated (MWH) 712.101 1,501,833 64,812,278
12. Reactor Service Factor 100.0 100.0 84.6
13. Reactor Availability Factor 100.0 100.0 84.6
14. Unit Service Factor 100.0 100.0 83.5
15. Unit Availability Factor 100.0 100.0 83.5 J
16. Unit Capacity Factor (using MDC) 98.6 98.7 81.6 l
17. Unit Capacity Factor (Using DER) 96.0 96.1 79.4 i
18. Unit Forced Outage Rate 3.4 i

c .:y -

m,,..-.n..,+ .-..s . -,e r ,-

  • a t

, OPERA!!NG DATA REPORT '

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY: E.G. WlEGERT TELEPHONE: 504 739-6446 QPERATING_ DATA REPORT (Con't)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):  ;

Refueling - March 4,1994. Planned duration - 52 days.

20. If Shutdown at end of report period, estimated date of startup: N/A
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 672.0 1,416.0 73,921.0
23. Unit Forced Outage Hours _

0.0 0.0 2,178.7

24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A

' l 1

.e. ~ , - , - . ,,, -,

AVERAGE DAILY UNIT POWER LEVEL ,

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY: E.G. WlEGERT TELEPHONE: 504 739-6440 MONTH FEBRUARY.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1062 17 1060 2 1061 18 1060 3 1060 19 1061 4 1062 20 1061 1

5 1037 21 1061 0 1061 22 1061 7 1062 23 1059 l l

8 1061 24 1060 l l

9 1001 25 1059 l 10 1061 26 1060 11 1061 27 1059 12 1061 28 1057

. 13 1061 29 N/A 14 1060 30 N/A 15 1061 31 N/A 16 1061 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.-

Compute to the nearest whole megawatt.

g h p '(N-y =T-=- -Te= -

u- g ww & y-r w .r e-f-1-ww^N- rwwwe wrraw is - e- =hevt -- -"

UNIT SHUTDOWNS AND POVER REDUCTIONS DOCKET NUMBER: 50-382 l UNIT NAME: WATERFORD 3 '

i DATE OF REPORT: MARCH,1994 '

COMPLETED BY: E.G. W1EGERT TELEPHONE- 504-739-6446 '

REPORT FOR FEBRUARY.1994 Type Method of Shutting

F = Forced Duration Down the Reactor or Cause, Comments and
Number Date S = Schedufed (Hours) Reason (1) Reducing Power (2) Corrective Actions 1

NONE i

1 t

4-

, (1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other (explain)

F= Administrative G= Operational Error (explain)

H= Other(explain) 4

_ . _ _ _ _ _ _ _ _ _ _ - - . _ _ , _ _ . _ _ . _ - _ _ _ - _ _ _ _ _ . - _ _ _ . _ _ - . . _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ . - - - _ _ - - _ - _ _ _ _ - ___--______a_m-___-___- -____u ___-_____ _ _ .