Text
w M
E ENTERGY 9"",""""*'
/.y t ', '
- - - - ~ -
---u-a
-+----*----i--------------+
R. F. Durski a;,
j W3F1-94-0031 A4.05 PR March 14, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of February, 1994.
This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, glL' p
R.F. Burski Director Nuclear Safety RFB/TSB/ssf Attachment cc:
L.J. Callan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),
J.T. Wheelock (INP0 Records Center), NRC Resident Inspectors Office bh
/p)!
9403150514 940220 i
ADOCK0500g2 1
y PDR R
i
t l
i l
.\\
l NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 FEBRUARY 1994 The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period.
l l
i
. i l
- 1 i
.I i
i
?.
.l l
d PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of February 1994, there were no pressurizer safety valve failures or challenges.
l i
.1
j OPERATING DATA REPORT
~
DOCKET NUMBER: 50-382
^
UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY:
E.G. WlEGERT TELEPHONE: 504-739-6446 QPERATitLG STATUS
.I 1.
Reporting Period: February,1994 Gross Hours in Reporting Period: 312-2.
Carrently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Not MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.
Power Level to which Restricted (if any) (Net MWe): N/A 4.
Reasons for Restricticn (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor was Critical 672.0 1,416.0 62,516.0 6.
Reactor Reserve Shutdown Hours 7.
Hours Generator was On-line 672.0 1,416.0 61,704.2 8.
Unit Reserve Shutdown Hours 9.
Gross Thermal Energy Generated (MWH) 2,273,776 4.791,006 203,819,483
- 10. Gross Electrical Energy Generated (MWH) 743,540 1,567,710 67,988.490
- 11. Not Elecincal Energy Generated (MWH) 712.101 1,501,833 64,812,278
- 12. Reactor Service Factor 100.0 100.0 84.6
- 13. Reactor Availability Factor 100.0 100.0 84.6
- 14. Unit Service Factor 100.0 100.0 83.5
- 15. Unit Availability Factor 100.0 100.0 83.5 J
- 16. Unit Capacity Factor (using MDC) 98.6 98.7 81.6 i
- 17. Unit Capacity Factor (Using DER) 96.0 96.1 79.4
- 18. Unit Forced Outage Rate 3.4 i
c
.:y m,,..-.n..,+
.-..s
-,e r
a t
OPERA!!NG DATA REPORT '
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY:
E.G. WlEGERT TELEPHONE: 504 739-6446 QPERATING_ DATA REPORT (Con't) 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
Refueling - March 4,1994. Planned duration - 52 days.
20.
If Shutdown at end of report period, estimated date of startup: N/A 21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 672.0 1,416.0 73,921.0
- 23. Unit Forced Outage Hours 0.0 0.0 2,178.7 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A
.e.
~, -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1994 COMPLETED BY:
E.G. WlEGERT TELEPHONE: 504 739-6440 MONTH FEBRUARY.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1062 17 1060 2
1061 18 1060 3
1060 19 1061 4
1062 20 1061 5
1037 21 1061 0
1061 22 1061 7
1062 23 1059 8
1061 24 1060 9
1001 25 1059 10 1061 26 1060 11 1061 27 1059 12 1061 28 1057
. 13 1061 29 N/A 14 1060 30 N/A 15 1061 31 N/A 16 1061 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.-
Compute to the nearest whole megawatt.
g h
p
'(N-y
=T-=-
-Te=
u-g ww y-r w
.r e-f-1-ww^N-rwwwe wrraw is -
e-
=hevt
UNIT SHUTDOWNS AND POVER REDUCTIONS DOCKET NUMBER: 50-382 l
UNIT NAME: WATERFORD 3 '
i DATE OF REPORT: MARCH,1994 COMPLETED BY:
E.G. W1EGERT TELEPHONE-504-739-6446 REPORT FOR FEBRUARY.1994 Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Schedufed (Hours)
Reason (1)
Reducing Power (2)
Corrective Actions 1
NONE i
1 t
4 -
(1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
Regulatory Restriction 4=
Continuation from Previous Period E=
Operator Training and 5=
Power Reduction License Examination 6=
Other (explain)
F=
Administrative G=
Operational Error (explain)
H=
Other(explain) 4 a m-u
.