Deficiency Rept Concerning Uncapped Spare Containment Pipe Penetrations.Corrective Action:Penetrations Will Be Sealed to Meet FSAR Reqs
ML20064G001
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/22/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20064F998 List:
References
REF-PT21-78-086-000 661, NUDOCS 7812060142
Download: ML20064G001 (2)


Text

,O k9*Od

.,Vepco VIRGINI A ELECTRIC AND POWER COMP ANY, RICHMOND, VIRGINf A 23269 I

November 22, 1978 i

Mr. James P. O'Reilly, Director Serial No. 661 o

Office of Inspection & Enforcement PSE&C/EGL:bep/mc U. S. Nuclear Regulatory Comission Region II Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta. Georgic 30303

Dear Sir:

On November 20, 1978, a report was made under the provisions of 10CFR50.55(e) concerning a possible deficiency in the spare containment pipe penetrations for North Anna Unit 2. '

k" In accordance.with the reporting requirements of 10CFR21, the following

+

information is submitted:

A.

Name and address of reporting individual:

(

Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 B.

Facility, activity, and/or component affected:

i North Anna F;6er ication, Unit 2 Spare Cor.i.7.i.se e Pipe Penetrations l

C.

Name of firm cgnstrucGpg the facility or supplyi.ng the component, activity or service.

r Stone & Webster E.ngineering Corporation P. O. Box 2325 r

Boston, Massachusetts 02107 D.

Description of defect, deficiency, or failure to comply:

FSARSection6.2.4.3, Subsection 4,Page6.2.125statisthatspare containment pipe penetrations are sealed at both ends by means of welded pipe caps.

It has been determined that only one end have been capped on North Anna Unit 2.

E.

Date of determination of reportability:

November 20, 1978 I

73120601N1

. -,~

~.

VmGINIA ELECTRIC AND POWER COMPANY To Mr. James P. O'Reilly SHEET ND. g F.

Similar components, activities, or services:

North Anna Power Statien, Unit 1 G.

Corrective action which has been, is being or will be taken, the indi-vidual responsible and the length of time to complete the action:

Penetrations will be sealed in accordance with the require-

~

ments of the FSAR.

H.

Other information:

None Any information not available at this time will be submitted in a follow-up letter as a 30-day report.

(.

Should you require further information, please contact this office.