MONTHYEARML19341C5221981-02-25025 February 1981 Forwards Addl Info for Tech Spec Change Request 28,re App J Containment Testing Requirements,Per 810127 Request Project stage: Other ML20004E9951981-06-0909 June 1981 Discusses Position on Reduced Duration Containment Leak Rate Test Period.Duration Should Not Be Less than 24-h Unless Experience of at Least Two Prior Tests Provides Evidence of Adequacy of Shorter Test Duration Project stage: Other IR 05000266/19810231982-01-28028 January 1982 IE Insp Repts 50-266/81-23 & 50-301/81-23 on 811201-31. Noncompliance Noted:Failure to Follow Maint Procedure Project stage: Request ML20050B3671982-03-26026 March 1982 Forwards Summary of Types A,B & C Refueling Containment Penetration Leak Tests for Various Periods Between Oct 1974 & Oct 1981,per Tech Specs Section 15.4.4.I.D & Section V.B of 10CFR50,App J.No Noncompliance Noted Project stage: Other ML20054K6581982-06-25025 June 1982 Notice of Issuance & Availability of Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20054K6531982-06-25025 June 1982 Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively, Providing Primary Containment Integrated Leak Rate Test Requirements & Schedules Project stage: Other ML20055A3211982-06-25025 June 1982 Exemption from Section 50.54(a) & 10CFR50,App J Re Type C Substitution for Type a Testing Requirements of Svc Air Supply Sys,Hydrostatic Testing Instead of Type C Testing for Decay Heat Removal Sys & Type a Test Sequence Methodology Project stage: Approval ML20054K6551982-06-25025 June 1982 Safety Evaluation Supporting Amends 61 & 66 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20055A3231982-06-25025 June 1982 Safety Evaluation Supporting Exemption from Section 50.54(a) & 10CFR50 App J Project stage: Approval ML20062K1691982-07-31031 July 1982 Rept of Reactor Containment Bldg Integrated Leakage Rate Test for Point Beach Unit 2 Project stage: Other ML20062K1531982-08-11011 August 1982 Forwards Rept of Reactor Containment Bldg Integrated Leakage Rate Test for Point Beach Unit 2 Project stage: Other ML20062K5551982-08-13013 August 1982 Discusses Plans & Tech Spec Changes for Compliance W/Requirements of 10CFR50 App J,Per .Full Compliance Re Plant Design Mods to Containment Spray Sys Will Be Achieved by Mar 1983 Project stage: Other ML20065S0671982-10-0404 October 1982 Safety Evaluation Supporting Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20065S0761982-10-0404 October 1982 Notice of Issuance & Availability of Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20065S0631982-10-0404 October 1982 Amends 64 & 69 to Licenses DPR-24 & DPR-27,respectively, Modifying Operation & Surveillance Testing Requirements of Containment Purge Supply & Exhaust Isolation Valves & Terminology of Tech Spec 15.4.4 on Testing Project stage: Other ML20027D1381982-10-21021 October 1982 Tech Spec Change Request 82,changing Requirements for Periodic Leakage Rate Testing of Containment Air Lock Doors Project stage: Other ML20027D1331982-10-21021 October 1982 Application to Amend Licenses DPR-24 & DPR-27,changing Tech Specs Re Requirements for Periodic Leakage Rate Testing of Containment Airlock Doors.Class I & II Amend Fees Encl Project stage: Request ML20064G0101982-10-24024 October 1982 Proposed Tech Spec Re Leakage Testing of Containment Purge Supply & Exhaust Valves Project stage: Other ML20064F9911983-01-0404 January 1983 Forwards Tech Spec Basis Change Re Leakage Testing of Containment Purge Supply & Exhaust Valves.Test Will Be Conducted Per Tech Spec 15.4.4.II, Type B Tests, Measuring Leakage Across Individual Pressure Boundaries Project stage: Other ML20069J0271983-04-0101 April 1983 Safety Evaluation Supporting Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20069J0171983-04-0101 April 1983 Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively, Modifying Requirements for Periodic Leak Rate Testing of Containment Airlock Doors Consistent w/10CFR50,App J Project stage: Other ML20069J0301983-04-0101 April 1983 Notice of Issuance & Availability of Amends 70 & 75 to Licenses DPR-24 & DPR-27,respectively Project stage: Other 1982-03-26
[Table View] |
Text
.
f' l
lHsconsm Elechc rowca couraur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 January 4, 1983 Mr. H.
R. Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 NOTIFICATION OF CHANGE TO TECHNICAL SPECIFICATION BASIS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The purpose of this letter is to notify you of a change Licensee has initiated to the Technical Specification Basis regarding leakage testing of the containment purge supply and exhaust valves.
These valves are required by the Specifications to be maintained locked closed during normal plant operation and may only be opened' when the reactor ir in a cold or refueling shutdown condition.
As origi ally presented, the Basis stated that these valves would be leakage tested in accordance with Specification 15.4.4.III.
This Specification describes the testing requirements for Type "C" tests, or tests to measure the leakage across an individual valve or group of valves used to isolate an individual containment penetration.
We have changed this Basis to state that the test shall be conducted in accordance with Specification 15.4.4.II,
" Type
'B' Tests".
Type "B" tests measure leakage across individual pressure containing boundaries.
We have initiated this change for the following reasons:
i 1.
Containment penetrations that employ resilient seals are presently listed under Type "B"
tests.
Since the purge supply and exhaust valves use resilient seals, and a primary purpose of the periodic leakage testing of these valves is to identify excessive degradation of the seals, they should be tested using the Type "B" test procedures.
8301110258 830104 PDR ADOCK 05000266 l
P PDR r*
i Mr. H.
R. Denton January 4, 1983 2.
The containment purge supply and exhaust valves, as stated previously, are locked closed'in all plant operating modes except cold or refueling shutdown.
These isolation valves, therefore, no longer perform an active containment isolation function and are not required to be capable of closing in response to a containment isolation signal while operating at power.
The valves now' function as pressure containing boundaries and, as such, are more appropriately tested to Type "B" requirements.
i 3.
The method used for. leak rate testing of the containment purge supply and exhaust valves is to pressurize the space between the two series valves in both the supply j
and exhaust lines.
The Type "C" tests require that the pressure shall be applied in the same direction as that when the valve is required to perform its isolation function.
For the containment side valve of these series pairs this is not presently possible, therefore, the Type "B" testing requirements are more appropriate.
i The Manager's Supervisory Staff has reviewed this change to the Basis under the provision of 10 CFR 50.59 and has approved this change in testing methodology.
The remainder of the Basis for this Specification and, of course, Specification 15.4.4.X itself have not been affected by this change.
We have included a page revision containing this change to the Technical Specification Basis with this letter.
Please notify us if you have any questions concerning this matter.
(
Very truly yours, i
n
/
Vice Preside
-Nuclear Power f
C. W. Fay Attachment i
Copy to NRC Resident Inspector i