Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-90-078, on 900906,discovered That Radiopharm Delivery Vehicle Missing.Vehicle Contained Two Spent Mo-99/Tc-99m Generators to Be Delivered to Del-Med Facility in South Plainfield,Nj by 900907.State of CT Notified + (ML20059G994)
- IR 05000498/1993031 + (ML20059G995)
- ML20059G996 + (ML20059G996)
- ML20059G997 + (ML20059G997)
- ML20059G998 + (ML20059G998)
- ML20059H000 + (ML20059H000)
- ML20059H001 + (ML20059H001)
- ML20059H004 + (ML20059H004)
- PNO-I-90-076, on 900902,licensee Initiated Manual Reactor Scram to Preclude Anticipated Automatic Scram Due to Increasing Reactor Vessel Water Level.Licensee Established Multidisciplinary Analysis Team to Evaluate Reactor Scram + (ML20059H006)
- ML20059H007 + (ML20059H007)
- ML20059H009 + (ML20059H009)
- ML20059H011 + (ML20059H011)
- ML20059H012 + (ML20059H012)
- ML20059H013 + (ML20059H013)
- ML20059H016 + (ML20059H016)
- ML20059H017 + (ML20059H017)
- ML20059H018 + (ML20059H018)
- IR 05000413/1990019 + (ML20059H019)
- ML20059H020 + (ML20059H020)
- ML20059H022 + (ML20059H022)
- B14661, Requests Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements,Per 10CFR50.55a(g)(6)(i),in Response to NRC GL 90-05.Description of Actions Taken by Util in Interim to Repair 2 Inch stab-in Off 24 Inch SW-17 Encl + (ML20059H024)
- ML20059H025 + (ML20059H025)
- ML20059H026 + (ML20059H026)
- ML20059H029 + (ML20059H029)
- ML20059H031 + (ML20059H031)
- ML20059H035 + (ML20059H035)
- ML20059H036 + (ML20059H036)
- ML20059H038 + (ML20059H038)
- ML20059H039 + (ML20059H039)
- ML20059H040 + (ML20059H040)
- ML20059H041 + (ML20059H041)
- ML20059H042 + (ML20059H042)
- ML20059H043 + (ML20059H043)
- ML20059H045 + (ML20059H045)
- ML20059H048 + (ML20059H048)
- ML20059H049 + (ML20059H049)
- RC-93-0279, Provides 10CFR50.46 30 Day Rept,Consisting Description of Issues Pertaining to Modeling of SI Flow Into Broken Loop & Notrump Drift Flux Flow Regime Map Errors & Summary of Collective Impact of ECCS Evaluation Model Changes + (ML20059H050)
- RC-93-0278, Requests Relief from ASME Section Xi,Class 1 Requirement for NDE of Welds in Plant Reactor Vessel,Steam Generators & Reactor Bldg Svc Water Piping + (ML20059H052)
- ML20059H054 + (ML20059H054)
- ML20059H055 + (ML20059H055)
- ML20059H056 + (ML20059H056)
- IR 05000498/1993054 + (ML20059H057)
- ML20059H059 + (ML20059H059)
- ML20059H060 + (ML20059H060)
- ML20059H061 + (ML20059H061)
- ML20059H064 + (ML20059H064)
- ML20059H065 + (ML20059H065)
- ML20059H066 + (ML20059H066)
- ML20059H067 + (ML20059H067)
- ML20059H069 + (ML20059H069)
- ML20059H070 + (ML20059H070)