Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039G222 + (ML20039G222)
- ML20039G224 + (ML20039G224)
- 05000293/LER-1981-054-01, /01T-3:on 811209,during Analysis for IE Bulletin 80-11,masonry Wall 65.4 Was Discovered to Be Unstable. Caused by Design Deficiency & Const Errors.Masonry Wall Will Be Modified Per Pdcr 81-53 + (ML20039G226)
- ML20039G227 + (ML20039G227)
- ML20039G228 + (ML20039G228)
- ML20039G229 + (ML20039G229)
- ML20039G230 + (ML20039G230)
- ML20039G231 + (ML20039G231)
- ML20039G232 + (ML20039G232)
- ML20039G233 + (ML20039G233)
- 05000311/LER-1981-124, Forwards LER 81-124/03L-0.Detailed Event Analysis Encl + (ML20039G234)
- 05000219/LER-1981-063, Forwards LER 81-063/03L-0.Detailed Event Analysis Encl + (ML20039G236)
- ML20039G238 + (ML20039G238)
- ML20039G239 + (ML20039G239)
- ML20039G240 + (ML20039G240)
- 05000311/LER-1981-124-03, /03L-0:on 811123,during M3J Maint Test, Undervoltage Relay on 2C Vital Bus Was Discovered Actuating at 35% Trip Setpoint Value.Caused by Mechanical Sticking of Relay.Relay Cleaned & Tested Satisfactorily + (ML20039G241)
- ML20039G242 + (ML20039G242)
- ML20039G243 + (ML20039G243)
- ML20039G245 + (ML20039G245)
- 05000219/LER-1981-063-03, /03L-0:on 811119,during Surveillance Testing, Isolation Condenser Valve V-14-30 Failed to Close.Caused by Torque Switch Setting & Packing Gland Tightness.Torque Switch Setting Corrected + (ML20039G246)
- ML20039G247 + (ML20039G247)
- ML20039G248 + (ML20039G248)
- ML20039G249 + (ML20039G249)
- ML20039G250 + (ML20039G250)
- ML20039G251 + (ML20039G251)
- ML20039G252 + (ML20039G252)
- ML20039G253 + (ML20039G253)
- ML20039G254 + (ML20039G254)
- ML20039G255 + (ML20039G255)
- 05000304/LER-1981-032, Forwards LER 81-032/03L-0 + (ML20039G256)
- ML20039G258 + (ML20039G258)
- ML20039G259 + (ML20039G259)
- W3P81-2085, Forwards Info Necessary to Close Out SER Open Item 9 Re Feedwater Line Break & SER Confirmatory Item 13 Re Reactor Coolant Pump Shaft Seizure Analysis.Info Will Be Included in Next FSAR Amend + (ML20039G260)
- 05000304/LER-1981-032-03, /03L-0:on 811219,safety Injection Accumulator Sample Containment Isolation Valve 2A0V-SS9357B Failed to Close.Caused by Sticking Valve Stem.Valve Stem Cleaned & Lubricated & Packing Adjusted + (ML20039G261)
- ML20039G262 + (ML20039G262)
- ML20039G264 + (ML20039G264)
- ML20039G265 + (ML20039G265)
- ML20039G268 + (ML20039G268)
- ML20039G272 + (ML20039G272)
- ML20039G275 + (ML20039G275)
- A02109, Responds to 811113 Request for Addl Info Re SEP Topic III-6, Seismic Design Considerations.Contractor Authorized to Transmit Info to Lll for Review of Plant Seismic Load Capability.Load Combination Inapproriate as Design Basis + (ML20039G276)
- 05000245/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (ML20039G278)
- ML20039G280 + (ML20039G280)
- 05000245/LER-1981-040, Forwards LER 81-040/03L-0.Detailed Event Analysis Encl + (ML20039G281)
- 05000245/LER-1981-039-03, /03L-0:on 811124,alarm on Control Room Panel 905 Annunciated.Caused by Blown Fuse Due to Burned Out Relay Coil.Relay Replaced & Four Switches on 595-102D Recalibr + (ML20039G283)
- ML20039G284 + (ML20039G284)
- ML20039G285 + (ML20039G285)
- 05000245/LER-1981-040-03, /03L-0:on 811203,while Performing Operability Demonstration,Isolation Valve 1-CU-3 Failed to Close on Signal.Caused by Corrosion to Motor Housing & Bearings Which Produced Open Circuit & Commutator Damage.Motor Replaced + (ML20039G286)
- ML20039G287 + (ML20039G287)
- ML20039G288 + (ML20039G288)
- ML20039G289 + (ML20039G289)