Interim Deficiency Rept Re Safety & nonsafety-related Piping Subassembly & Partial Component Support Sleeves,Initially Reported 801208.Many Sleeves Remain Unidentified After Physical Insp.Next Rept Will Be Submitted by 820312
ML20039G275
Person / Time
Site: Marble Hill
Issue date: 01/08/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S80-36, NUDOCS 8201150455
Download: ML20039G275 (2)


Text

. 0100824000 A[ [a fy$hb R; -

PUBLIC MM" hl  ; e SERVICE d JAN 131982> I INDIANA h%?QL[

S W Shield <

senior vit.e Presdent - January 8,19[

Nuclear Division S8O-36 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 =

U.S. Nuclear Regulatory Cominission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellya, Illinois 60137 Marble Hill Nuclear Generating Statlan - Units 1 and 2

Dear Mr. Keppler:

On December 8, 1980, Mr. T. D. Gelb of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During receipt inspection, PSI Quality Assurance personnel were unable to verify, using construction records, that certain pipe sleeves had becu installed in their designated locations. This concern pertained to a group of safety and non-safety related piping subassembly and partial component support sleeves of various matcrials.

In an effort to establish the traceability of the sleeves in question an examination of available records was conducted. Based on the results of this examination an cn-site physical inspection of the sleeves was initiated. Subsequent to this inspection a number of slaeves remained unidentified. PSI has submitted proposed actions to correct this sit-uation to its Authorized Nuclear Inspector for review and is awaiting hfs concurrence or comments at this time.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before March 12, 1982.

8201150455 810108 PDR ADOCK 05000546 752 'n S PDR 7y g P. O. Box 190, New Washington, h. diana 47162 812. 289.1000 U

1 I

'O PUbuC SEnVICE INDIANA Letter: J. C. Keppler January 8, 1982 S80-36 If you have any questions on this report, please feel free to contact me.

1

~

Sine rely, S

h4 W. Shields TDG/bsk cc: Director of Inspect ion at.d Enforcement U.S. Nuclear Regulatory Commission Washington. D.C. 20555 E. R. Schweibinz, P. E.