Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039C233 + (ML20039C233)
- ML20039C234 + (ML20039C234)
- ML20039C235 + (ML20039C235)
- ML20039C236 + (ML20039C236)
- ML20039C237 + (ML20039C237)
- ML20039C238 + (ML20039C238)
- AECM-81-505, Forwards Responses to Hydrogen Review Questions & Analysis of Selected Base Case Containment Pressure & Temp Response. Equipment Survivability & Hydrogen Control Repts Will Be Submitted in Jan 1982 + (ML20039C239)
- ML20039C240 + (ML20039C240)
- ML20039C241 + (ML20039C241)
- ML20039C242 + (ML20039C242)
- ML20039C243 + (ML20039C243)
- ML20039C245 + (ML20039C245)
- ML20039C246 + (ML20039C246)
- ML20039C247 + (ML20039C247)
- ML20039C248 + (ML20039C248)
- ML20039C249 + (ML20039C249)
- ML20039C250 + (ML20039C250)
- ML20039C251 + (ML20039C251)
- ML20039C252 + (ML20039C252)
- ML20039C253 + (ML20039C253)
- ML20039C254 + (ML20039C254)
- ML20039C255 + (ML20039C255)
- RBG-11-824, Completes Response to Generic Ltr 81-03.A/E Will Specify L Grade Stainless Steel for All Other ASME III Code Class 2 & 3 Piping Per Generic Ltr 81-03 & NUREG-0313,Revision 1 + (ML20039C256)
- ML20039C257 + (ML20039C257)
- ML20039C258 + (ML20039C258)
- ML20039C259 + (ML20039C259)
- ML20039C260 + (ML20039C260)
- ML20039C261 + (ML20039C261)
- 05000280/LER-1981-079, Forwards LERs 81-070/03L-0,81-074/03L-0,81-078/03L-0 for Unit 2 & LER 81-079/03L-0 for Unit 1 + (ML20039C262)
- 05000282/LER-1981-027, Forwards LER 81-027/03L-0 + (ML20039C264)
- 05000311/LER-1981-122, Forwards LER 81-122/03L-0.Detailed Event Analysis Encl + (ML20039C266)
- 05000282/LER-1981-027-03, /03L-0:on 811116,discovered That Pre,Absolute & Charcoal Filter Test Not Done on 11 Shield Bldg Ventilation Sys Replacement on 811112.Caused by Procedural Inadequacies & Poor Communications + (ML20039C268)
- ML20039C270 + (ML20039C270)
- 05000306/LER-1981-028, Forwards LER 81-028/03L-0 + (ML20039C271)
- 05000311/LER-1981-122-03, /03L-0:on 811119 & 1207,leakage Rate Exceeded Limit at 130-ft Elevation Containment Air Lock.Caused by Misalignment of Inner Door Latch Mechanism & Failure of Latch Bearing.Latch Bearing Replaced + (ML20039C273)
- 05000306/LER-1981-028-03, /03L-0:on 811118 & 1218,bistables 2-PC-431 G & I Found Out of Tolerance.Caused by Defective Potentiometer on 811118.On 811218,leads Were Tightened,Correcting Problem + (ML20039C275)
- ML20039C276 + (ML20039C276)
- 05000324/LER-1981-128, Forwards LER 81-128/03L-0 + (ML20039C277)
- 05000244/LER-1981-020, Forwards LER 81-020/03L-0 + (ML20039C280)
- ML20039C282 + (ML20039C282)
- 05000324/LER-1981-128-03, /03L-0:on 811121,23,24 & 29 Oxygen Analyzer Showed Upscale Indications of Drywell Oxygen Concentration While Redundant Analyzer Was at Norm.Caused by Ice in Analyzer Air Dryer That Restricted Sample Flow + (ML20039C283)
- ML20039C286 + (ML20039C286)
- 05000287/LER-1981-014, Forwards LER 81-014/03L-0.Detailed Event Analysis Encl + (ML20039C287)
- ML20039C289 + (ML20039C289)
- 05000244/LER-1981-020-03, /03L-0:on 811119,two Fire Seals from a Battery Room Found Not Installed.Caused by Personnel Failure to Fill Seals W/Fire Barrier Foam.Improved Training & Supervision Instituted + (ML20039C290)
- ML20039C291 + (ML20039C291)
- 05000287/LER-1981-014-03, /03L-0:on 811125,channel B flux-imbalance Flow Bistable Found to Trip Outside Tech Spec Limit.Caused by non-linear Gain on Reactor Protection Sys Channel B Scaled delta-flux Amplifier.Amplifier Replaced + (ML20039C292)
- 05000219/LER-1981-059, Forwards LER 81-059/03L-0.Detailed Event Analysis Encl + (ML20039C293)
- 05000271/LER-1981-032, Forwards LER 81-032/03L-0 + (ML20039C295)
- ML20039C297 + (ML20039C297)
- PNO-V-81-070, resident Inspector Learned That 12 Gauges Associated W/Leach Diesel May Not Be Seismically Qualified. Gauges Isolated.Licensee Knew of Deficiency in 1977. Inspector Investigating + (ML20039C298)