Text
Consumers Power James W Cook C0mpBDy v,,, m,a,,,
%,g.,,,,s.,
and Cons,ructso.
General Offices: 1945 West Parnail Rom 1, Jackson. MI 49201 * (517) 788 o453 December 21, 1981 s-S RECEtVED E
DEC2 8 7981> jI
~~
Harold R Denton, Director gg Office of Nuclear Reactor Regulation RELweaag a Division of Licensing US Nuclear Regulatory Commission g
Washington, DC 20555 m
/
MIDLAh3 PROJECT MIDLAh3 DOCKET NOS 50-329, 50-330 PART I RESPONSE TO NUREG-0612 CONTROL OF HEAVY LOADS AT NUCLEAR POWER PLANTS FILE: 0963 SERIAL:
14928 Reference (A) J W Cook Letter to H R Denton, Serial 12219, Dated June 18, 1981 Enclosure (1) Midland Units 1 & 2 - Part I Respense - Control of Heavy Loads at Nuclear Power Plants (NUREG-0612)
Reference (L) stated that a report of CP Co's review of controls for handling heavy loads would be submitted to the Staff by December 30, 1981. As outlined in D G Eisenhut's letters of December 22, 1980 and February 3, 1981, CP Co's review is being conducted in two phases. The results of Part I review are enclosed and address the general requirements for the control of heavy loads.
Part II review, addressing specific requirements for the control of heavy loads in spent fuel, reactor vessel and other safe shutdown areas, is still underway. We expect this phase to be completed in the near future and we plan to submit the Part II response by February 26, 1982.
dAa JWC/ PEP /fms CC RJCook, Midland Resident Inspector RHernan, US NRC LSRubenstein, US NRC DBMiller, Midland Construction (3)
RWHuston, Washington OY okoghjj9 oc1281-0494a131 C