l PHILADELPHIA ELECTRIC COMPANY e
g 2301 M ARKET STREET
[]
P.O. BOX 8699 RECEAVED 1881 -1981 PHILADELPHI A. PA.19101 k;
QECS8198]D> h)
SHIELDS L D ALTROFF vics ressansur Q
UMU soscraic reocuctio=
IWC sp December 24, 1981 Re: Docket Nos.30-277 50-278 l
Mr. Darrell G.
Eisenhut, Director Division of Licensing U.S.
Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Request for Exemption from 10 CPR 50.48 for Peach Bottom Atomic Power Station
Dear Mr. Eisenhut:
In accordance with telephone conversations with the Peach Bottom Project Manager (December 8, 1981), this letter revises the request for exemption to the implementation schedules identified in 10 CFR 50.48, subsection (c)(2) and (d)(2) regarding fire protection modifications.
The revised request for exemption is as follows:
Philadelphia Electric Company hereby requests an exemption to regulations 10 CFR 50.48(c)(2) and (d)(2).for the Peach Bottom Atomic Power Station to extend the date to January 29, 1982, for completion of the following fire protection modifications:
1)
Sprinkler systems in the recirculation pump M-G set lube oil pump rooms, and in the M-G set rooms.
2)
Early warning detection systems (smoke detectors) in the areas discussed in the March 20, 1981 letter, and the automation of the cable spreading ob
' n
\\b Gs hDkkDOCKO00 7
F PDR
Mr.
D.
G.
Eisenhut Page 2 room suppression system associe.ted with the new i
smoke detection system.
1 3)
Breathing air bottle charging system.
Additionally, Philadelphia Electric Company hereby requests an exemption to regulations 10 CFR 50.48 (c)(2) and (d)(2) for the Peach Bottom Atomic Power Station to extend the date to March 31, 1982, for completion of electrical supervision of fire doors as approved in the staff's Supplement No. 1 to the Safety Evaluation of the Peach Bottom Atomic Power Station Fire Protection Program, item 3.2.6 (R.
W.
Reid to E.
G.
Bauer, dated August 14, 1980).
A description of compensatory measures implemented while the modifications are being completed is provided in correspondence dated October 14, 1981 (J.
W.
Gallagher to D.
G.
Eisenhut), and November 19, 1981 (S.
L.
Daltroff to D.
G.
Eisenhut).
Should you wish to discuss this matter further, please do not hesitate to contact us.
Very truly yours,
,l
)
,g fiIl f'.
_ =.. _ _..
i 1
l COMMONWEALTH OF PENNSYLVANIA :
ss.
COUNTY OF PHILADELPHIA S.
L.
Daltroff, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, that he has read the foregoing letter dated December 24, 1981, relating to the Company's request for exemptions from the implementation schedules identified in 10 CFR 50.48, subsections (c)(2) and (d)(2), and the previous correspondence referred to therein; that he knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
[ $~j
,/
f, a-c q
Subscribed and sw n to before me thi [J day ClllL 0 @l i
M IM r_,Oh bIldbd /
tIo EUZJ5 N.
L.
4dary Pulhic Philt, Phill CMn Expires Jan. 30,1LU
.,