Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035C551 + (ML20035C551)
- ML20035C552 + (ML20035C552)
- ML20035C554 + (ML20035C554)
- ML20035C557 + (ML20035C557)
- ML20035C558 + (ML20035C558)
- ML20035C560 + (ML20035C560)
- ML20035C561 + (ML20035C561)
- ML20035C562 + (ML20035C562)
- ML20035C563 + (ML20035C563)
- ML20035C564 + (ML20035C564)
- ML20035C565 + (ML20035C565)
- ML20035C566 + (ML20035C566)
- ML20035C567 + (ML20035C567)
- ML20035C568 + (ML20035C568)
- ML20035C569 + (ML20035C569)
- ML20035C570 + (ML20035C570)
- 05000298/LER-1993-003, :on 930306,Group Isolation & Loss of Shutdown Cooling Due to Inadvertent 4160 Vac Breaker Trip.Caused by Personnel error.Self-checking Training Will Be Enhanced & Addl Labeling & Visual Identification Aids Being Evaluated + (ML20035C574)
- ML20035C575 + (ML20035C575)
- ML20035C576 + (ML20035C576)
- ML20035C579 + (ML20035C579)
- 05000298/LER-1993-004, :on 930308,discovered That Documentation for Installation of Temporary Seals in RB Exterior Wall on 930306 Incomplete Due to Procedural Deficiencies.Procedures Revised to Ensure Guidance Re Temporary Seal Installation + (ML20035C580)
- PY-CEI-NRR-1631, Revised Emergency Public Info Organization Implementing Instruction Manual,Including Rev 19 to JPC-App B,Temporary Change 1 to Rev 7 to JPC-App C & Temporary Change 1 to Rev 1 to JPC-App D + (ML20035C582)
- ML20035C584 + (ML20035C584)
- ET-NRC-93-3854, Forwards Corrected AP600 Passive RHR Study Sketch Drawings Provided in 920914 Response to 920714 Request for Addl Info.Encl Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse + (ML20035C586)
- ML20035C591 + (ML20035C591)
- ML20035C592 + (ML20035C592)
- 05000482/LER-1993-001, :on 930304,determined That All Time Delays for RCP Undervoltage Trip Function Not Included in Response Time Testing of Reactor Trip Circuit.Caused by Inadequate Westinghouse TS Development Procedures Revised + (ML20035C594)
- ML20035C595 + (ML20035C595)
- ML20035C596 + (ML20035C596)
- ML20035C597 + (ML20035C597)
- 05000293/LER-1993-002, :on 930225,RCIC Sys Declared Inoperable During Surveillance Testing.Caused by Galling of Valves Stem & Bonnet Chamber.Valve Stem & Bonnet Chamber Will Be Replaced & Parts Will Be Purchased Following Design + (ML20035C598)
- ML20035C600 + (ML20035C600)
- ML20035C601 + (ML20035C601)
- ML20035C603 + (ML20035C603)
- ML20035C604 + (ML20035C604)
- ML20035C605 + (ML20035C605)
- ML20035C608 + (ML20035C608)
- ML20035C609 + (ML20035C609)
- ML20035C611 + (ML20035C611)
- ML20035C613 + (ML20035C613)
- ML20035C614 + (ML20035C614)
- ML20035C615 + (ML20035C615)
- ML20035C617 + (ML20035C617)
- ML20035C618 + (ML20035C618)
- ML20035C619 + (ML20035C619)
- ML20035C621 + (ML20035C621)
- ML20035C622 + (ML20035C622)
- ML20035C623 + (ML20035C623)
- ML20035C624 + (ML20035C624)
- ML20035C625 + (ML20035C625)
- ML20035C626 + (ML20035C626)